Council Meeting/Documents/Letter received November 7, 2023 from D. Wilson, Re: Off-Street Parking Review
Correspondence

Letter received November 7, 2023 from D. Wilson, Re: Off-Street Parking Review

November 7, 2023Pages 201–2034 sections

External correspondence received by the town providing feedback or commentary on the Off-Street Parking Review.

9.2.a Letter received November 7, 2023 from D. Wilson, Re: Off-Street Parking Review
November 7, 2023D. Wilson

Construction Impact Assessment and Tree Management Plan for 339, 341, 345 Island Highway Prepared for Boardwalk REIT

Page 201–203

APPENDIX C – HARD SURFACE ABOVE TREE ROOTS DETAIL

Page 201–203

HARD SURFACE ABOVE TREE ROOTS DETAIL

CROSS SECTION VIEW NTS

HARD SURFACE ABOVE TREE ROOTS NOTES

  1. Maintain as large a setback between the fill encroachment and the root collar of the tree as possible.
  2. Review any canopy clearance pruning requirements to accommodate vehicle or pedestrian clearances (Pruning to be performed to ANSI A300 standards).
  3. Excavate the new footprint of the driveway or sidewalk under the supervision of the project arborist. Excavation will be limited to the removal of the existing sod layer. Excavation around root structures must be performed by hand, airspade, or hydroexcavation.
  4. Install a two-dimensional (such as Combigrid 3030) or Three-dimensional geogrid reinforcement.
  5. Install a 150mm depth layer of clear crushed gravel (no fines) using 20mm and/or 75mm diameter material or approved equivalent. *Note - the depth may be less than 150mm in some situations (dependant on grading constraints).
  6. Install meduim weight geotextile fabric (such as Nilex 4535 or similar) over the clear crushed gravel layer to prevent fine particles of sand from infiltrating this layer.
  7. The bedding or base layer and new driveway or sidewalk surface can be installed directly on top of the felted filter fabric.
  8. Fill slopes - where possible install loose stacked boulders to reduce the footprint of the fill slopes that encroach within the critical root zone. Fill slope materials must be permeable to air and water. Do not pile fill material directly against the trunk of a tree.
Page 201–203

ATTACHMENT 8

Tenant Relocation Plan

July 10, 2023

339, 341, 345 Island Highway

Page 201–203