Appendix 2: 297 View Royal Avenue; Tree Protection Plan Drawing
Site drawing detailing the tree protection measures and critical root zones for trees affected by the proposed construction.
297 View Royal Avenue; Tree Protection Plan Drawing
CONCRETE JUNGLE FORESTRY LTD.
Urban & Wildland Forest Assessment & Mapping
Appendix 2: 297 View Royal Avenue; Tree Protection Plan Drawing.
Tree Inventory Table
| Tree (Tag) # | Tree | Protected Bylaw 1069 2022 Protected | Ownership | DBH (cm) | Road Zone Radius (m) | Crown East (m) | Crown South (m) | Crown West (m) | Crown North (m) | Health | Structure | Comments |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 491 | Douglas-fir (Pseudotsuga menziesii) | Yes | 297 View Royal | 108.0 | 15.3 | 12 | 12 | 10 | 8 | Good | Good | Large mature tree on western part of front property. Needs canopy lift pruning for driveway clearance. |
| 492 | English Oak (Quercus robur) | No | 297 View Royal | 38.0 | 5.7 | 7 | 7 | 6 | 4 | Good | Good | Young oak tree on eastern part of property. Prune lower limbs for clearance. |
| 493 | Black Hawthorn (Crataegus douglasii) | Yes | 297 View Royal | 25.0 | 4.0 | 5 | 5 | 4 | 3 | Good | Good | Multi-stemmed shrub on eastern part of property. Prune for site access. |
| 494 | Grand Fir (Abies grandis) | Yes | 297 View Royal | 58.0 | 8.7 | 9 | 8 | 7 | 8 | Good | Good | Mature Grand fir tree near property line. Prune lower limbs for driveway clearance. |
| 495 | Bigleaf Maple (Acer macrophyllum) | Yes | 297 View Royal | 34.0 | 5.1 | 6 | 5 | 5 | 4 | Fair | Fair | Multi-stemmed maple tree near house footprint. Minor pruning required. |
Tree Protection Measures
- Canopy Clearance Pruning
- Pruning must be completed prior to constructing Grand Fir 494 tree protection fence.
- CJF recommends 2.5m canopy lift from current lowest branch.
- Black hawthorn #493 prunings.
- Grand fir #494 CJF advises whole tree safety and maintenance prune.
- All pruning to be completed by an ISA certified arborist.
- Tree Protection Fencing (TPF)
- Provide maximum and approved aeration of selected tree service contractor.
- No entry into fenced protection zone (TPF).
- No loading in-out.
- Max pruning height: 50% of tree height.
- Post brightly coloured "Tree Protection Zone" signs: permission.
- Remove debris from project area.
- Site supervisor must ensure fence remains in place.
- Construct rain run off with well braced 1.2m (4') wood frame / snow fence panel tree protection fence.
- Maintain tree protection fence in good functioning condition until landscape changes.
- Fencing must be erected prior to any site work.
- Construction materials / waste / concrete outwash must not be placed against / stored within protection zones.
- TPF to be installed at edge of the critical root zone (CRZ) as identified.
- Temporary Machine / Materials Access
- Place temporary bridge over critical root zone where access is required.
- Temporary wood chip path / 80mm wood chips over woven geotextile.
- Access for low-pressure track machines only inside root protection zone.
- Soil Compaction Protection
- Use wood chip mulch layer (10-15cm) between access slopes and bottom north property line path.
- Do not allow excavator to climb/descend slope over non-woven geotextile (Texel 350 or similar product).
- Excavation
- In the following locations hand excavation with hand:
- All proposed work within the root zone of Douglas-fir 491.
- Proposed gabion wall construction on west side of property.
- 4m south / west of Douglas-fir 491 35cm surface holding roots 1, 2.
- Root pruning:
- Flush prune exposed roots >2.5cm diameter severed or damaged beyond reasonable repair.
- Seal exposed roots with sterile pruning compound.
- Hand / hand pruner tools.
- Sawzall / reckal with wood knife.
CJF Project responsibilities:
- Discuss canopy pruning goals / practice with tree service contractor prior to commencement.
- Layout protection fence alignment with builder at start.
- Consult on temporary machine / materials access slope design / location.
- Consult on woodchip soil compaction protection with contractor.
- Oversee temporary machine / materials access slope construction.
- Oversee excavation along:
- Western property line between waterline and Grand fir 494.
- Western property line within Bigleaf maple 495 8.1m PRZ.
- 0.15m either side of Douglas-fir 491 35cm surface holding roots 1, 2.
- Prune exposed roots >2.5cm.
- Flush prune exposed roots.
- Consult on location of plantable walls where these encroach toward Douglas-fir 491 36cm surface roots.
- Remain available to other consultants, home owner and contractor team.
- Occasionally visit site to ensure tree protection measures maintained.
- Submit arborist letter of "successful project completion / Bylaw 1069, 2022 protected tree impact assessment report".
Legend
- canopy
- tree trunk
- root protection zone
- CJF oversight work area
- wood chip soil compaction protection
Map Notes
- Douglas-fir 491; holding root Root 1
- Douglas-fir 491; holding root Root 2
- Douglas-fir 491: holding root: GAP BETWEEN ROOT SYSTEMS SHOULD ALLOW FOR AN AXIAL ROOT CANAL / UTILITY TRENCH AS RECOMMENDED IN 2010 FOR WATER DRAINAGE.
- GABION WALLS ALONG SHORELINE: RESTORE AND INCREASE BIODIVERSITY VALUES OF SITE BY USING "CJF" COMPOSTABLE COCONUT FIBRE MAT TO RETAIN SOLID COIR SOIL ON THE TOP AND FRONT SIDE WITH BIOLOGISTS APPROVED PLANTINGS.
- REMOVAL OF INVASIVE BROOM: FROM SHORELINE BEYOND THE 15M SETBACK.
- STONE VENEER RETAINING WALLS & STAIRS: TO REPLACE EXISTING DRY STACKED CINDER BLOCK WALLS & FLAGSTONE PATIOS.
Landscape Specifications:
These plans are not for construction. These plans are not to scale. Landscapers and homeowners must be aware of all aspects of any landscape and/or tree protection bylaws to comply with municipal bylaws and installed and maintained as noted on Landscape and All drawings and specifications remain the property of Concrete Jungle Forestry Ltd. (CJF). CJF is not responsible for any change of plan or details by others. Contractors must verify all dimensions, and working budgets at the job site. The designer is not responsible for construction means, methods, technique, sequence, budgets or safety on the job. Any and all changes made during construction must be approved in writing by the designer. All plants and materials are supplied by homeowner. All errors, omissions and revisions must be reported immediately to the designer. Designer is to be paid plant fees for any changes or additions to plant lists. It is the homeowner/landscaper's responsibility to locate all underground services.
DISCLAIMER: As hundreds of city councils and fancy decisions are made during the creation of these drawings, it is inevitable that some gaps may filter into these plans. Homeowners/landscapers are responsible for reviewing these plans with a arborist/landscape architect/landscape designer and ensuring that all plans meet provincial and municipal tree protection/landscape guidelines. Concrete Jungle Forestry Ltd. cannot be held responsible for errors or omissions on this plan. Because the use of these plans is beyond our control, we cannot assume any responsibility or liability for their use or for any loss or damage that may result therefrom, and shall be held harmless from any and all liability in regards to their use. It shall be understood that with the acceptance of these plans, the landscape designer shall be held harmless from any and all liability in regards to their use.
Address: 297 View Royal Avenue, Victoria BC V9B 1R3 Date: July 7, 2022 Project Name: 297 View Royal Firm: CONCRETE JUNGLE FORESTRY LTD. Contact: (250) 589-4050 Email: concretejungleforestry@gmail.com