This site is in beta — data may be incomplete and features are still being added.
Council Meeting/Documents/Drawing A1.4 - Shadow Study (March 20 / June 20)
Appendix

Drawing A1.4 - Shadow Study (March 20 / June 20)

January 15, 2019Page 1621 section

Shadow analysis drawings for the spring equinox and summer solstice dates.

1 CALL TO ORDER
Drawing Number: A1.4Dates Analyzed: March 20, June 20

PROPOSED RESIDENTIAL DEVELOPMENT

242-244 ISLAND HIGHWAY, VICTORIA, BC

alan lowe architect inc. 118 - 21 Erie St. Victoria, British Columbia t 250.360.2888

SHADOW STUDY: MARCH 20 / JUNE 20

Project Information:

  • Project no.: 17-504
  • Date: 05 NOV 2018
  • Scale: AS NOTED
  • Drawn by: TS, DM, WL
  • Checked by: LOWE
  • Sheet no.: A1.4

Issue / Revisions

No. Issued / Revisions Date
1 REZONING 19 FEB '18
2 REVISIONS TO REZONING 15 MAY '18
3 DEVELOPMENT PERMIT 25 JUNE '18
4 REVISIONS TO DP 08 NOV '18

1 MARCH 20 - 9AM

Shadow study diagram for March 20 at 9:00 AM showing shadows from the proposed building at 242-244 Island Highway extending towards properties on Suzanne Pl. and the Lane to the northwest.
Shadow study diagram for March 20 at 9:00 AM showing shadows from the proposed building at 242-244 Island Highway extending towards properties on Suzanne Pl. and the Lane to the northwest.

4 JUNE 20 - 9AM

Shadow study diagram for June 20 at 9:00 AM showing shadows from the proposed building extending towards the northwest.
Shadow study diagram for June 20 at 9:00 AM showing shadows from the proposed building extending towards the northwest.

2 MARCH 20 - 12PM

Shadow study diagram for March 20 at 12:00 PM showing shadows from the proposed building extending directly north towards 236 Suzanne Pl.
Shadow study diagram for March 20 at 12:00 PM showing shadows from the proposed building extending directly north towards 236 Suzanne Pl.

5 JUNE 20 - 12PM

Shadow study diagram for June 20 at 12:00 PM showing shortened shadows from the proposed building extending north.
Shadow study diagram for June 20 at 12:00 PM showing shortened shadows from the proposed building extending north.

3 MARCH 20 - 3PM

Shadow study diagram for March 20 at 3:00 PM showing shadows from the proposed building extending towards the northeast across the Lane and toward properties at 250 and 243 Island Highway.
Shadow study diagram for March 20 at 3:00 PM showing shadows from the proposed building extending towards the northeast across the Lane and toward properties at 250 and 243 Island Highway.

6 JUNE 20 - 3PM

Shadow study diagram for June 20 at 3:00 PM showing shadows from the proposed building extending towards the northeast.
Shadow study diagram for June 20 at 3:00 PM showing shadows from the proposed building extending towards the northeast.
Page 162
Extracted from: 2019 01 15 Council Agenda - Agenda - Pdf