Engineering drawing detailing the water, sewer, and storm drain connections for the proposed development.
242 Island HighwayDate: October 2018
242 Island Highway - Servicing Plan and Details
Project Information
Client: Dave Vidalin Project No: 3337 Date: October 2018 Drawing No: 3337-02 Scale: 1:250 Consultant: Westbrook Consulting Ltd. #115 - 866 Goldstream Ave., Victoria, BC V9B 0J3 Telephone: 250-391-8592 Facsimile: 250-391-8593
Legend
- 100mm Thick Concrete (150mm at driveway location):
- Approximate extent of asphalt paving:
- Landscaped area:
- Proposed tree:
Proposed Services Legend
| Symbol | Description | Symbol | Description | Symbol | Description |
|---|---|---|---|---|---|
| --- W --- | Water | — — — — | Road Sign | [Circle/H] | Hydrant |
| --- S --- | Sanitary Sewer | — — — — | Asphalt | [Circle/V] | Valve |
| --- D --- | Drain | — — — — | Concrete | [Square/M] | Meter |
| — · — · | Ditch/Swale | — — — — | Gravel | [X] | Reducer |
| [Rectangle] | Culvert | — — — — | Brick | [F] | Flush |
| [Half-Circle] | Headwall | [Cloud] | Bushline | [Tree] | Tree |
| — — — | Edge Pave | [Circle/S] | Manhole | — — — | Non-Mtbl Curb |
| — — — | Mountable Curb | [CO] | Cleanout | — — — | Flat Curb |
| [Square/CB] | Catchbasin ID/T | — — — — | Barrier Curb | [Triangle] | Monument |
| [Dot/Circle] | Lot Pin | --- G --- | Gas | [Arrow] | Lead Pipe |
| [Light Symbol] | Cobra/Davit Light | [Light Symbol] | Ornamental Starlight | [Circle/P] | Power Pole |
Water Service Capping Detail
(N.T.S.)
- Shut off curb stop
- Install compression fitting with cap
- Fill abandoned portion with high density fill
Double Check Valve Assembly Chamber
(N.T.S.)
- 100ø Drain to stormwater management cells
- 14 x 19mm Sensus SR II Water Meter
- Thrust Plate 560x560x9.5mm (TYP)
- Fusion bonded epoxy-coated to AWWA C213 100ø SCH40 Steel
- 50x63ø Reducer
- 63ø Watts Series LF757 Double Check Valve Assembly
- Concrete thrust block c/w 15M reinforcement E.W. typical
- Volclay RX waterstop, grout opening watertight with non-shrink grout
- 100ø Watts Series LF757 Double Check Valve Assembly
- USF Fabrication access hatch - Model AC-3030 aluminum or approved alternate. Adjust to match final road grade.
- 150ø Vent to be routed to vegetated area c/w bird screen.
- Finished Ground
- Epoxy coated steel-transition coupling (Steel to PVC) same diameter as pipe.
- Thrust Ring (TYP)
- Grinnell pipe supports or approved alternate (2/Assembly)
- 1800ø Manhole Barrel
- Minimum 300mm compacted sand, all around manhole.
- 19mm diameter Galv. Ladder rungs at 300mm spacing c/w BC-2 "COPROX" safety paint (Model No. LUT (Black Enamel))
- Romac DJ400 Dismantling Joint or approved alternate.
- Slope bottom of manhole @ min 1.0% toward 100ø PVC drain to stormwater management cells.
- Min. 150mm compacted granular material.
Water Service Detail
(1:100)
- 2-40° 100ø Bends, MJH c/w thrust blocks
- 1-100ø Gate Valve, MJH c/w thrust block
- 50ø Service Saddle c/w Valve, Service Tubing and box for curb stop
- 2-200øx100ø Tapping Sleeve, 1-100ø Gate Valve, FLH c/w thrust block
- Double check detector assembly (to detail this sheet)
- 50ø Domestic water meter to CRD Std Dwg 2.8
Flow Control Manhole Detail
(N.T.S.)
- Building storm drain to go through oil interceptor prior to exiting the building. Refer to mechanical drawings for details. 150ø Inlet from equipment rm 35.400.
- 600ø ADS N-12 corrugated HDPE inlet/outlet pipe to detention chamber.
- Stormwater detention cells storage = 34.740
- Inlet pipe invert: 34.606
- Outlet pipe: 150mm PVC DR28
- 1200ø Concrete lid H20 rated.
- 1200ø Concrete manhole sections c/w 19mm galvanized steel rungs at minimum 300mm spacing.
- Overflow invert: 35.338
- Riser open at top 150mm PVC DR35.
- Impervious liner.
- Cap with 57mm orifice. Invert: 34.556.
- Min. 150mm compacted granular material.
- 15M @ 300 E.W. O.C. required in areas of low soil bearing strength and deep manholes.
General Notes
The location and elevation of existing underground services on this drawing may not be accurate or complete. The actual horizontal and vertical locations must be confirmed by utility companies and the contractor prior to the start of any excavation.