January 15, 2019Page 1771 section

Engineering plan showing the proposed grading levels and street profile changes.

1 CALL TO ORDER
242 Island HighwayDate: October 2018

242 Island Highway - Grading Plan, Profiles and Details

Westbrook Consulting Ltd. #115 - 866 Goldstream Ave., Victoria, BC V9B 0J3 Telephone: 250-391-8592 Facsimile: 250-391-8593

Gutter Profile

Scale: H 1:250 V 1:50

Vertical Curve Data:

  • PVI STA: 10+21.048 | PVI ELEV: 36.721 | K: 3.8 | 10.000m VERT. CURVE
  • PVI STA: 10+35.640 | PVI ELEV: 37.149 | K: 3.3 | 10.000m VERT. CURVE
  • PVI STA: 10+53.237 | PVI ELEV: 38.130 | K: 1.4 | 15.000m VERT. CURVE
  • PVI STA: 10+86.673 | PVI ELEV: 36.522 | K: 4.0 | 10.000m VERT. CURVE

Typical Sections

Island Highway Typical Section (NTS)

  • Sidewalk (1.80m): 100mm thick concrete sidewalk (150mm thick at driveway crossings) on 100mm of 20mm minus crushed gravel.
  • Bus Stop (3.00m): 2.0% cross-slope.
  • Bike Lane (1.90m): 1.0-4.0% cross-slope.
  • Pavement Structure:
    • 100mm thick asphalt paving (top lift and bottom lift).
    • 100mm of 19mm minus crushed gravel.
    • 250mm of 75mm minus pit run gravel placed on subgrade approved by a geotechnical engineer.
    • Non-mountable curb.
    • Note: Confirm subbase with proof roll.

Access Lane Typical Section (NTS)

Grading Plan Details

Plan Notes:

  • Bollard lighting, typ. by others.
  • Tie into existing curb and sidewalk at the next sidewalk panel.
  • Bike lane lines and marking to be repainted after paving.
  • Catch basin to be moved and adjusted to the new gutter.
  • 100mm thermoplastic white traffic line.
  • Adjust pavers and existing catchbasin to suit new curb.
  • Curb return to be adjusted to align with the property line.

Building Elevations:

  • Building (North): FG 37.10, S 33.106, D 34.310, O+41.7, MBFE 35.6
  • Building (South): FG 37.25, S 33.106, D 34.780, O+41.7, MBFE 35.6

Access Lane Curb Return Grading

Scale: 1:100

Legend

Symbol Description
[Hatched Area] 100mm thick concrete (150mm at driveway location)
[Shaded Area] Approximate extent of asphalt paving
[Stippled Area] Landscaped area
[Tree Icon] Proposed tree
+ 00.00 Proposed finished ground elevation
00.00 Existing ground elevation

Project Information

Field Details
Project 242 Island Highway, Dave Vidalin
Westbrook Project No. 3337
Date October 2018
Designed RD
Drawn IK
Scale Horiz 1:250, Vert 1:50
Sheet 3 of 3
Drawing No. 3337-03

General Notes: The location and elevation of existing underground services on this drawing may not be accurate or complete. The actual horizontal and vertical locations must be confirmed by utility companies and the contractor prior to the start of any excavation.