Appendix
Site Servicing Schematic - 231 Heddle Ave (Attachment 2)
January 15, 2019Page 2191 section
A civil engineering drawing showing the proposed site layout and utility servicing for the Heddle Avenue project.
Westbrook Consulting Ltd.Date: 2018-04-27
Site Servicing Schematic - 231 Heddle Ave
Project Information
- Project: 231 Heddle Ave
- Client: John Koren
- Consulting Firm: Westbrook Consulting Ltd.
- Date: 2018-04-27
- Project No.: 3214
- Scale: 1:250
- Status: Preliminary Drawing
Drawing Annotations and Details
- Access: Common access 8.0m wide; 6.0m paved driveway and retaining wall as required.
- Easements: 5.0m access easement over SL 1 in favor of SL 4.
- Storm Water: Storm water detention gallery (typical); perforated foundation drain.
- Utilities:
- Backflow prevention valve chamber.
- Water meter chamber to CRD detail 2.8.
- Remove lawn basin and replace with manhole.
- Lot Designations: SL 1, SL 2, SL 3, SL 4.
- Location Context: Site located between Heddle Ave and Island Hwy.
Legend
Tree Symbols
- Tree to remain: See arborist report
- Tree to be removed
Pavement and Drainage Symbols
- EP: Edge of pavement
- WC: Asphalt water control
Proposed Services (Shown Bold)
| Symbol/Line | Description | Symbol/Line | Description |
|---|---|---|---|
| W | Water | Hydrant | Hydrant |
| S | Sewer | Valve | Valve |
| D | Drain | Meter | Meter |
| Edge Pave. | Edge Pavement | Manhole | Manhole |
| Non-Mtble Curb | Non-mountable Curb | Cleanout | Cleanout |
| Mountable Curb | Mountable Curb | Catchbasin | Catchbasin |
| Gas | Gas | Road Sign | Road Sign |
| Underground Utl. | Underground Utility | Asphalt | Asphalt |
| Cobra/Davit Light | Cobra/Davit Light | Concrete | Concrete |
Note: The location and elevation of existing underground services on this drawing may not be accurate or complete. The actual horizontal and vertical locations must be confirmed by utility companies and/or by hand digging prior to any construction.
Page 219
Extracted from: 2019 01 15 Council Agenda - Agenda - Pdf