This site is in beta — data may be incomplete and features are still being added.
Council Meeting/Documents/Attachment 14. Grading Plan (updated) - Associated Engineering
Appendix

Attachment 14. Grading Plan (updated) - Associated Engineering

April 20, 2021Page 681 section

Updated civil grading plan for Phase 3.

1 CALL TO ORDER
March 18, 2021Associated Engineering

West Park at Thetis Phase 3 - Civil Grading Plan

General Notes

  1. GEOTECHNICAL AND STRUCTURAL DESIGN OF RETAINING WALLS, BOULDER WALLS, AND ROCK CUTS BY OTHERS.
  2. 1.5 m WIDE BENCHES REQUIRED WHERE CUT SLOPES OVER 6 m - GEOTECH ENGINEER TO CERTIFY ALL ROCK CUTS AND BOULDER STACKED WALLS.
  3. 2:1 BOULDER STACKED WALL REQUIRED (TO BE MONITORED AND CERTIFIED BY GEOTECHNICAL ENGINEER).
  4. 1 m HIGH BOULDER STACKED WALL BETWEEN 1.5:1 SLOPES (TYP) TO BE MONITORED & CERTIFIED BY RYZUK.
  5. 1 m HIGH BOULDER STACKED WALL TO BE MONITORED & CERTIFIED BY RYZUK.

Legend

Symbol Description
G=49.40 AVERAGE GARAGE ELEVATION
(89.561) ROAD CENTERLINE FINISHED GRADE
67.350 FINISHED GRADE
92.10 DESIGN SUBGRADE/PAD ELEVATION
90.46 ORIGINAL GROUND
3.7 WALL HEIGHT (FILL)
2.2 SIDE YARD WALL HEIGHT

Rear Yard Walkout Types

  • TYPE U: SG 0.30, FG 0.45
  • TYPE M: SG 0.40
  • TYPE L: SG 0.45

Revision History

REV DATE DESIGN DRAWN DESCRIPTION
A 2020SEP14 DD DH ISSUED FOR PRICING
B 2020NOV6 DD DH ISSUED FOR PLUMBING PERMIT
C 2021MAR18 DD DH ISSUED FOR PRICING

Project Information

  • Client: LIMONA CONSTRUCTION
  • Project Title: WEST PARK AT THETIS PHASE 3
  • Project Number: 2016-2253-00
  • Drawing Title: CIVIL GRADING PLAN
  • Scale: 1:250
  • Drawing Number: 2253-00-C-301
  • Revision: C
  • Sheet: 6
  • Firm: Associated Engineering (DRAFT - PRELIMINARY/FOR DISCUSSION - NOT FOR CONSTRUCTION)
Page 68
Extracted from: 2021 04 20 Council Agenda - Agenda - Pdf