Council Meeting/Documents/CORE AREA TRUNK SEWERS - SCHEDULE 'A' TO BYLAW 2312
Appendix

CORE AREA TRUNK SEWERS - SCHEDULE 'A' TO BYLAW 2312

June 16, 2020Pages 191–1922 sections

Detailed engineering maps (Schedule 'A') showing the trunk sewer network and maximum allocated capacities for regional participants.

1 CALL TO ORDER
January 16, 2006Macaulay Point Service AreaMaximum allocated capacities for 2045

CORE AREA TRUNK SEWERS

SCHEDULE 'A' TO BYLAW 2312 AS AMENDED BY BYLAW 3319. - MACAULAY POINT SERVICE AREA AND MAXIMUM ALLOCATED CAPACITIES

Allocation Tables (Litres per Second - L/s)

ALDEANE (MEAFORD) WEIR

Participant Current Allocation (L/s) 2045 Allocation (L/s)
Langford 370 370

PARSONS MAG METER

Participant Current Allocation (L/s) 2045 Allocation (L/s)
Langford 370 370
Colwood 347 347
Total (see note 4) 651 651

CRAIGFLOWER PUMP STATION

Participant Current Allocation (L/s) 2045 Allocation (L/s)
Langford 210 370
Colwood 192 347
View Royal 173 274
Songhees IR 22 45
Esquimalt IR 13 17
Esquimalt 7 8
Total (see note 4) 522 894
  • EXISTING PUMP STATION IS SCHEDULED TO BE REPLACED TO MEET CAPACITY.

MARIGOLD PUMP STATION

Participant Current Allocation (L/s) 2045 Allocation (L/s)
Saanich 568 806 *
  • MARIGOLD TANK TO STORE FLOW IN EXCESS OF 568 L/s. BENEFIT TO DOWNSTREAM MUNICIPALITIES FROM FLOW STORAGE.

SHORELINE TRUNK SEWER

Participant Current Allocation (L/s) 2045 Allocation (L/s)
View Royal 10 25
Songhees IR 22 45
Esquimalt IR 13 17
Esquimalt 7 8
Total **52 95**

HARRIET FLUME

Participant Current Allocation (L/s) 2045 Allocation (L/s)
Saanich 210 226

CITY BOUNDARY FLUME

Participant Current Allocation (L/s) 2045 Allocation (L/s)
Saanich 350 365

CECELIA FLUME

Participant Current Allocation (L/s) 2045 Allocation (L/s)
Victoria 105 633

SELKIRK CONNECTION

Participant Current Allocation (L/s) 2045 Allocation (L/s)
Esquimalt 1 1
Victoria 8 31
Total 9 32

HEREWARD / LANGFORD FLUMES

Participant Current Allocation (L/s) 2045 Allocation (L/s)
Victoria 60 271

WILSON FLUME

Participant Current Allocation (L/s) 2045 Allocation (L/s)
Esquimalt 7 116

SEA TERRACE FLUME

Participant Current Allocation (L/s) 2045 Allocation (L/s)
Victoria 28 64

HEAD STREET FLUME

Participant Current Allocation (L/s) 2045 Allocation (L/s)
Esquimalt 49 262
DND 21 21
Total 70 283

LANG COVE PUMP STATION

Participant Current Allocation (L/s) 2045 Allocation (L/s)
Esquimalt 27 128
DND 46 76
Total 73 204

CONSTANCE / LYALL MAG METER

Participant Current Allocation (L/s) 2045 Allocation (L/s)
Esquimalt 20 87
DND 53 102
Total 73 189

KINVER MAG METER

Participant Current Allocation (L/s) 2045 Allocation (L/s)
Esquimalt 0 100

DEVONSHIRE FLUME

Participant Current Allocation (L/s) 2045 Allocation (L/s)
Esquimalt 54 247
Songhees IR 1 1
Total 55 248

NORTHWEST TRUNK WESTERN AT MACAULAY

Participant Current Allocation (L/s) 2045 Allocation (L/s)
Langford - 370
Colwood - 347
View Royal 173 274
Esquimalt 109 323
DND 136 178
Songhees IR 22 45
Esquimalt IR 13 17
Total 453 1554

NORTHWEST TRUNK NORTHERN AT MACAULAY

Participant Current Allocation (L/s) 2045 Allocation (L/s)
Saanich 1128 1397 *
Victoria 442 1080
Esquimalt 194 644
Songhees IR 1 1
DND 37 37
Total 1802 2890
  • SEE NOTE 6

MACAULAY POINT PUMP STATION & OUTFALL

Participant Current Allocation (L/s) 2045 Allocation (L/s)
Saanich 1128 1397 *
Victoria 442 1080
Esquimalt 427 967
Langford - 370
Colwood - 347
View Royal 173 274
DND 185 215
Songhees IR 23 46
Esquimalt IR 13 17
Total (see note 4) 1787 4452 *
  • SEE NOTE 6

NORTHWEST TRUNK NORTHERN AT LYALL

Participant Current Allocation (L/s) 2045 Allocation (L/s)
Saanich 1128 1397 *
Esquimalt 111 626
Esq. Credit for Lyall Diversion 65
Victoria 201 1080
Victoria credit for Lyall Diversion 241
Songhees IR 1 1
DND 21 21
Total 1768 2856
  • SEE NOTE 6

KINVER / ANSON FLUME

Participant Current Allocation (L/s) 2045 Allocation (L/s)
Esquimalt 18 18
DND 16 16
Total 34 34

NOTES:

  1. ALL FLOWS SHOWN ARE PEAK, IN LITRES PER SECOND (L/s).
  2. CURRENT FLOW ALLOCATIONS ARE BASED ON 1973 PRIESTMAN REPORT AND 1994 WESTERN COMMUNITIES TRUNK SEWER COST SHARING REPORT.
  3. 2045 FLOW ALLOCATIONS ARE BASED ON REGIONAL GROWTH STRATEGY AND 2004 INFLOW & INFILTRATION RATES. THESE ALLOCATIONS WILL BE AVAILABLE WHEN ALL LIQUID WASTE MANAGEMENT PLAN (LWMP - CHAPTER 16) UPGRADES ARE COMPLETED.
  4. TOTAL PEAK FLOWS MAY NOT ADD CUMULATIVELY DUE TO POPULATION-BASED HARMON PEAKING FACTOR.
  5. LOCATION AND EXTENT OF CRD SEWERS AND FACILITIES AS DEPICTED ARE PRELIMINARY AND MAY CHANGE IN ACCORDANCE WITH THE FINAL SYSTEM DESIGN. PROPOSED UPGRADES AS SHOWN ARE REQUIRED TO MEET 2045 FLOW ALLOCATIONS.
  6. SAANICH'S ALLOCATED FLOW AT MACAULAY REMAINS AT 1128 L/s AS EXCESS IS STORED IN MARIGOLD TANK.

DESIGN FLOW LEGEND

  • INFLOW ALLOTMENT AT INDICATED LOCATION
  • DESIGN CAPACITY ALLOTMENT AT INDICATED LOCATION
  • EXIST. / PROP. (Legend for Sewer Lines and Facilities)
  • TRUNK SEWER: [Solid Line / Dashed Line]
  • BYPASS OUTFALL: [Line with arrows]
  • PUMP STA.: [Solid square / Dashed square]
  • PUMP STA. UPGRADE: [Solid square with star / Dashed square with star]
  • PEAK FLOW STORAGE TANK: [Solid hexagon / Dashed hexagon]

LAST REVISED: JAN. 16, 2006 DWG. NO. 8-S184-1 SHT 1 OF 2


SCHEDULE 'A' TO BYLAW 2312 AS AMENDED BY BYLAW 3319. - CLOVER POINT SERVICE AREA AND MAXIMUM ALLOCATED CAPACITIES

Allocation Tables (2045 Allocation L/s)

NORTHEAST TRUNK BOWKER AT FINLAYSON

Participant 2045 Allocation (L/s)
Saanich 14
Victoria 152
Total (see note 3) 158

NORTHEAST TRUNK BOWKER UPSTREAM OF TRENT P.S.

Participant 2045 Allocation (L/s)
Saanich 396
Victoria 1461
Total (see note 3) 1824

TRENT PUMP STATION

Participant 2045 Allocation (L/s)
Saanich 365
Victoria 1155
Total 1520
  • BENEFIT TO OAK BAY FROM FLOW DIVERSION

NORTHEAST TRUNK BOWKER DOWNSTREAM OF TRENT P.S.

Participant 2045 Allocation (L/s)
Saanich 37
Victoria 320
Oak Bay 237
Total (see note 3) 560

NORTHEAST TRUNK BOWKER UPSTREAM OF CURRIE ROAD

Participant 2045 Allocation (L/s)
Saanich 37
Victoria 320
Oak Bay 1155
Total (see note 3) 1450
Page 191–192

CURRIE ROAD PUMP STATION

Participant 2045 Allocation (L/s)
Saanich 552
Victoria 320 *
Oak Bay 1109
Total (see note 3) 1509 **
  • *CURRIE ROAD P.S. IS ONLY REQUIRED TO CONVEY SAANICH'S 5 YEAR FLOW FROM EDI, & OAK BAY'S 5 YEAR FLOW FROM NETB AND ECI (ALL FLOW IN EXCESS OF 1509 L/s CAN BE DIVERTED OUT MCMICKING BYPASS OUTFALL.

EAST COAST INTERCEPTOR UPSTREAM OF CURRIE ROAD

Participant 2045 Allocation (L/s)
Saanich 552 *
Oak Bay 318
Total (see note 3) 856
  • *ARBUTUS TANK IS UTILIZED DURING STORM EVENTS TO THROTTLE SAANICH'S FLOW TO 552 L/s.

CLOVER POINT PUMP STATION & OUTFALL

Participant 2045 Allocation (L/s)
Saanich 552 *
Victoria 2420
Oak Bay 1223
Total (see note 3) 4100 **
  • *ARBUTUS TANK IS UTILIZED DURING STORM EVENTS TO THROTTLE SAANICH'S FLOW TO 552 L/s MAX.
  • **CLOVER POINT P.S. IS ONLY REQUIRED TO CONVEY AND DISCHARGE 5 YEAR FLOWS (ALL FLOW IN EXCESS OF 4100 L/s CAN BE DIVERTED OUT THE EMERGENCY BYPASS OUTFALL.

HARLING POINT PUMP STATION

Participant 2045 Allocation (L/s)
Oak Bay 61.5

CITY TRUNK (BUSHBY)

Participant 2045 Allocation (L/s)
Victoria 2372

ARBUTUS FLUME

Participant 2045 Allocation (L/s)
Saanich 1040 *
  • *ARBUTUS TANK STORES FLOW IN EXCESS OF 1040 L/s.

UNIVERSITY OF VICTORIA

Participant 2045 Allocation (L/s)
Saanich * 134
  • *SAANICH HAS SEWER USE AGREEMENT WITH UVIC.

PENRHYN PUMP STATION

Participant 2045 Allocation (L/s)
Saanich 552 *
  • *ARBUTUS TANK IS ACTIVATED DURING STORM EVENTS TO THROTTLE SAANICH'S FLOW TO 552 L/s MAX.

HUMBER & RUTLAND PUMP STATIONS

Participant 2045 Allocation (L/s)
Oak Bay 25 *
  • *WHEN COMBINED SEWERS ARE SEPARATED. (SEE NOTE 5)

PROPOSED ARBUTUS PEAK FLOW STORAGE TANK 17,900 m³

  • ARBUTUS TANK WILL STORE ALL FLOW IN EXCESS OF 1040 L/s FROM ARBUTUS OR 134 L/s FROM UVIC.
  • *BENEFIT TO OAK BAY & VICTORIA FROM FLOW STORAGE.

NOTES:

  1. ALL FLOWS SHOWN ARE PEAK, IN LITRES PER SECOND (L/s).
  2. 2045 FLOW ALLOCATIONS ARE BASED ON REGIONAL GROWTH STRATEGY AND INCLUDE INFLOW & INFILTRATION RATES FOR A 5 YEAR OR 100 YEAR STORM EVENT WHERE APPLICABLE MODELED IN 2004. THESE ALLOCATIONS WILL BE AVAILABLE WHEN ALL LIQUID WASTE MANAGEMENT PLAN (LWMP CH. 16) UPGRADES ARE COMPLETED.
  3. TOTAL PEAK FLOWS MAY NOT ADD CUMULATIVELY DUE TO POPULATION-BASED HARMON PEAKING FACTOR.
  4. LOCATION AND EXTENT OF CRD SEWERS AND FACILITIES AS DEPICTED ARE PRELIMINARY AND MAY CHANGE IN ACCORDANCE WITH THE FINAL SYSTEM DESIGN. PROPOSED UPGRADES AS SHOWN ARE REQUIRED TO MEET 2045 FLOW ALLOCATIONS.
  5. BYPASS OUTFALLS WILL ONLY BE ACTIVATED DURING A STORM EVENT THAT EXCEEDS A 5 YEAR RETURN PERIOD.

DESIGN FLOW LEGEND

  • INFLOW ALLOTMENT AT INDICATED LOCATION
  • DESIGN CAPACITY ALLOTMENT AT INDICATED LOCATION
  • EXIST. / PROP. (Legend for Sewer Lines and Facilities)
  • TRUNK SEWER: [Solid Line / Dashed Line]
  • BYPASS OUTFALL: [Line with arrows]
  • PUMP STA.: [Solid square / Dashed square]
  • PUMP STA. UPGRADE: [Solid square with star / Dashed square with star]
  • PEAK FLOW STORAGE TANK: [Solid hexagon / Dashed hexagon]

LAST REVISED: JAN. 16, 2006 DWG. NO. 8-S184-2 SHT 2 OF 2

Page 191–192