Completed checklist evaluating the project's economic, environmental, and social sustainability attributes.

1. CALL TO ORDER
20 rental townhousesRetention of 12 existing Garry Oak treesProximity to Galloping Goose Trail

PROJECT SUSTAINABILITY CHECKLIST

All new developments in View Royal should be designed to be sustainable. This checklist will be used by Staff and Council as part of your application. If you require further space feel free to attach additional information. If something does not apply simply indicate N/A (Not Applicable).

Project Sustainability Checklist Page 1
Project Sustainability Checklist Page 1

1. Economic Sustainability

Key Elements Yes No Description/Explanation
1.1 Comment on direct employment opportunities created by this project during construction:
a. Number and duration of jobs (full time, part time): a. Full-time and part-time:
b. Types of jobs (e.g.- construction, design): b. Full- time and part-time:
1.2 Will the project provide permanent employment after the project is completed? X Describe:
1.3 Are there any other components of economic sustainability (e.g. suitability of units for live/work opportunities, secondary housing units) advanced by this proposal? X List: This is adding 20 rental townhouses to the community. to broaden the housing options

2. Environmental Sustainability – Built Environment

Key Elements Yes No Description/Explanation
2.1 Walking distance to current and future transport-hubs as marked in the OCP:
Distance to bus stop (in kilometres): .3K
or... any trails, greenways, cycling routes (in kilometres): immediately adjacent: GALLOPING GOOSE TRAIL.
List:
2.2 Is the proposed development located within the Town’s Urban Containment Boundary (check with View Royal Planning Dept.)? X Describe where:
2.3 Does the project provide additional support for alternative transportation use? Check all that apply:
[ ] Was a variance granted to provide less parking than required?
[x] Is there on-site bicycle storage? – IN EVERY GARAGE.
[ ] Are there change rooms?
[ ] Is there designated parking for car-share spaces, high-occupancy vehicles (e.g., carpool, vanpool)?
[ ] Are there means for alternate transport/ power supplies?
Describe: ____________________________________________________________________________________
[ ] If other, describe? ______________________________________________________________________________________
Project Sustainability Checklist Page 2
Project Sustainability Checklist Page 2
Key Elements Yes No Description/Explanation
2.4 Does the development meet or exceed the Town of View Royal Municipal Guidelines for the retention and cleaning of storm-water? X Describe: not yet designed.
2.5 Have you considered floodplain mitigation or ocean tidal-storm surges? How would this be managed? N/A Explain:
2.6 Will site remediation be part of the development process? X Explain: no history of industrial use.
2.7 Mitigation of light pollution (e.g., spill lighting, offsite glare and up lighting avoided) X Describe: will use downcast exterior lights.
2.8 Will the project provide enhanced waste-diversion facilities such as: on-site recycling or on-site composting? X List and Describe: on site composting.

3. Environmental Sustainability

Key Elements Yes No Description/Explanation
3.1 Comment on the inclusion of the following water efficiency techniques:
a. Water-efficient-landscaping such as: drought-resistant /native plantings; the use of non-potable, or reclaimed water for irrigation; the use of high efficiency irrigation; the use of rainwater cisterns for irrigation and Xeriscapes? X a. List and describe: drought resistant planting & high efficiency drip irrigation.
b. Onsite grey-waste-water treatments? X b. List and describe:
c. Indoor water-use-reduction measures (e.g. low consumption fixtures/appliances) that exceed bylaw requirements? X c. List and describe:
Project Sustainability Checklist Page 3
Project Sustainability Checklist Page 3
Key Elements Yes No Description/Explanation
3.2 Comment on the inclusion of any of the following methods to reduce energy use and improve air quality:
a. The Energy efficiency ratings of proposed structures and materials used such as: locating buildings to respond to daily sun/shade patterns; high-performance envelopes; passive solar gain; solar shading; natural ventilation; ground heating/cooling; high- efficiency fixtures; consideration of heat-island effects including landscaping, green roofs/walls etc. X high albedo roof. colour to reflect sunlight.
b. The use of renewable-energy alternatives (e.g. geothermal, solar, off-grid power or water supplies, BC Hydro Green Power). X
3.3 Comment on the following methods for sustainable-use (and reuse) of building materials and resources:
a. The management of construction wastes (e.g. reuse of existing buildings or building materials during construction and/or demolition, having remade or recycled content): X
b. The use of environmentally-sensitive or recycled construction materials (e.g. high-volume, fly-ash concrete, non-toxic finishing materials3): X
c. The enhanced durability of construction materials (e.g. wall systems, roof materials): X
d. Is LEEDS, Built Green or other green standards certification being pursued for this project? X
3.4 Comment on the inclusion of any strategies to improve indoor environmental quality:
a. Improved air quality through low-emitting materials (e.g. paint, carpets) and natural ventilation with windows that open. X
b. Design attempts to maximize exposure to natural light and passive solar heating/ light (i.e. through building orientation). X
Project Sustainability Checklist Page 4
Project Sustainability Checklist Page 4
Key Elements Yes No Description/Explanation
3.5 Does the street/boulevard layout and design encourage walking and cycling, while also providing for personal and commercial vehicle use? X 4 townhouses face St. Giles. to enrich the streetscape- St. Giles is being upgraded with re-surfacing & boulevard treatment
3.6 If new streets or lanes are constructed as part of the development, how are they designed to reduce storm-water runoff? X The street re-surfacing will be integrated into the existing drainage ditch system.
3.7 If the property is adjacent to existing parking space, open space, paths or trails, is there a visual and pedestrian connection provided? Is it signed and accessible? X The Galloping Goose Trail is visible & accessible and will be signed.
3.9 Is the proposed development within a ten-minute walk (approximately 800 metres) from: X Comments:
[x] neighbourhood store or other shopping opportunities
[ ] schools
[x] community services (e.g., library, community centre)
[x] child care facility
[x] health services (e.g., hospital, doctor’s office)
[x] parks or trails
[x] bus stop
[ ] other alternative transport (park-and-ride, car pool)
[ ] other amenities

4. Natural Environment

Key Elements Yes No Description/Explanation
4.1 Is the proposed development in an environment-development permit area? X Describe:
4.2 Was an environmental assessment of the property completed prior to the commencement of design work? X When and by whom? STANTEC has provided a report.
Project Sustainability Checklist Page 5
Project Sustainability Checklist Page 5
Page 47–52
Key Elements Yes No Description/Explanation
4.3 Are any of the following environmental features present on the property? X Describe: There is a grove of Garry Oaks- we are retaining 12 trees. - see arborist report.
[x] Significant native and protected trees
[ ] Natural grassland areas
[ ] Riparian areas: estuaries, wetlands, tidal-creeks
[ ] Is it adjacent to Esquimalt Harbour or Portage Inlet
[ ] Wildlife (red or blue, listed species)
[ ] Wildlife habitat
[ ] Wildlife corridors
b) Has the preservation and/or enhancement of any the areas listed above been incorporated in the proposed project? Explain how:
4.4 Provision of natural green space and trees on site (includes retention of existing trees).
a) Amount of green space (area in m² and ft²): ____________________________________________________________________
b) Amount of usable, open space (area in m² and ft²): _________________________________________________________________
c) Number and percentage of existing trees to be retained on site: 12 existing trees.
d) Number of trees removed: 6 trees.
e) Number of trees to be planted: _______________________________________________________________________________
f) Names of native species being planted: _________________________________________________________________________
4.5 Are there any significant existing environmental features that are to be maintained or enhanced on the site (e.g., tree and/or shrub preservation, or daylighting of a stream)? List and describe: see 4.3 above.

5. Social Sustainability

Key Elements Yes No Description/Explanation
5.1 Anticipated price range of units (note the price ranges for both commercial and residential units, if applicable)
____________________________________________________________________________________________________________
Average price per square foot of cost and expected sale: _______________________________________ // ____________________
Project Sustainability Checklist Page 6
Project Sustainability Checklist Page 6
Key Elements Yes No Description/Explanation
5.9 Does the project contain a mix of uses (e.g. residential, commercial) and/or introduce a new community-serving land use type to the neighbourhood (e.g. new housing-form, commercial service)? X Describe: rental townhouses not currently in community.
5.10 Does the project contribute to heritage revitalization through the reuse, relocation or rehabilitation of an existing structure or feature? N/A Describe:
5.11 Does the project involve provincial designation of a heritage building/features/trees? X Describe:
5.12 Are there any public amenities provided by, and maintained, with the development (check all that apply):
[ ] Public art
[ ] Child care facility
[ ] Walking/bike trails
[ ] Public Washrooms
[ ] Drinking Fountains
[ ] Other, Describe: ______________________________________________________________________________________
5.13 How does the development create or enhance local food production and food securing? X Describe:
5.14 Does the development incorporate space for public gathering and activities (e.g. courtyards, communal gardens, play areas, benches, shaded areas)? X Describe: There is a central green space where the trees are retained as well as an open space in the SW corner
5.15 How does the proposed development enhance the streetscape? Describe:
4 TOWNHOUSES FACE THE STREET TO ENGAGE IT. Street & Boulevard improved.
5.16 How have residents and community stakeholders been involved in the planning and design process? Describe in detail:
neighbors on St. GILES / Casgrain & others trails have been informed - see letter in package.
5.17 Is there something unique or innovative about your project that has not been addressed in this checklist (e.g., creation of a new zone, other descriptors)? X Describe:
5.18 Do any of the Town of View Royal policies or regulations currently prevent you from implementing sustainable initiatives? X Describe:
Page 47–52
Extracted from: 2018 02 06 Council Agenda - Agenda - Pdf