Appendix
FIELD REVIEW REPORT No. 1 - 237 Anya Lane
May 17, 2016Page 291 section
Geotechnical field review report confirming the wall is considered suitable for driveway support under static conditions.
Contractor: Design West ConstructionEngineer: Alec Morse, P.Eng.Date: November 21, 2013
FIELD REVIEW REPORT
| PROJECT: Retaining Wall Review | Report No 1 | In Attendance: |
| LOCATION: 237 Anya Lane, View Royal, BC | Date: November 21, 2013 | Lak Jassar |
| CONTRACTOR: Design West Construction | Project No: VI12-0784-00 | Ed – Excavator Operator |
| OWNER: | Time: 10:30 am | Alec Morse |
| CONTRACT REF Lak Jassar | Weather: Sunny/cool |
OBSERVATIONS/REMARKS/ACTIONS BY: Alec Morse, P.Eng.
- construction of a stacked boulder wall had been carried out along the south side of a driveway access to the lower, rear yard of the property;
- the wall was observed to be range in height from 1 to 4m and, due to proximity of trees along the toe of the wall, the face batter of the wall varies from 1H:1V to ¼H:1V;
- review of the backfill indicates that free-draining material was used to promote drainage into the low-lying area adjacent to Millstream Creek;
- a test pit excavated at the base of the wall indicates that the subgrade for the wall is dense, native, silty sand, which is consistent with past experience within this subdivision;
- the driveway is to remain gravel-surfaced and not used on a daily basis;
- it was discussed that this wall is a landscaping wall with minimal downslope consequence for failure, as the area below the wall is within the subject property and will not be readily habited;
- the wall is considered suitable for driveway support and is expected to perform adequately under static conditions.
Distribution: Design West: Lak Jassar – Email – jassar1@telus.net
Page 29
Extracted from: 2016 05 17 Council Agenda - Pdf