Appendix
FIRE TRUCK TURNING TEMPLATE (Attachment 23)
October 18, 2016Page 981 section
A maneuvering analysis demonstrating that standard fire trucks can navigate the site.
Date: February 29, 2016Consultant: Westbrook Consulting Ltd.
EAGLE CREEK VILLAGE - PHASE 2 FIRE TRUCK TURNING TEMPLATE


Project Information
- Project: EAGLE CREEK VILLAGE OMICRON DEVELOPMENT INC.
- Title: FIRE TRUCK TURNING TEMPLATE PHASE 2
- Consultant: WESTBROOK Consulting Ltd.
- Address: #115 - 866 Goldstream Ave., Victoria, BC V9B 0J3
- Telephone: 250-391-8582
- Fax: 250-391-8593
- Westbrook Project No.: 2623
- Date: 2016.05.20
- Figure: 1
- Sheet: 1 of 1
Revisions
| No. | Description | Date | By | Chk. |
|---|---|---|---|---|
| 1 | REVISED ACCESS ALIGNMENT AND PARKING | 2016.03.31 | PC | ELH |
| 2 | REVISED PER TOWN COMMENTS | 2016.05.11 | PC | ELH |
Legend - Proposed services shown bold
| Symbol | Description | Symbol | Description |
|---|---|---|---|
| —— W —— | WATER | ⬚ | HANDHOLE |
| —— S —— | SEWER | ⊙ | CLEANOUT |
| —— D —— | DRAIN | ▅ | CATCHBASIN |
| ———— | NATURAL GRADE | 🚩 | ROAD SIGN |
| ====== | CULVERT | ⦾ | HYDRANT |
| ⊓ | HEADWALL | ⧇ | VALVE |
| —— G —— | GAS | ⊠ | METER |
| —— H —— | HYDRO | ⧓ | REDUCER |
| —— T —— | TEL | ◈ | MONUMENT |
| ....... | SIDEWALK | • | LOT PIN |
| _______ | CURB/CURB & GUTTER | + | LEAD PLUG |
| — · — · | PROPERTY LINE | ||
| ~~~~~~ | BUSHLINE | ||
| 🌲 | TREE | ||
| [Graphic] | EXISTING S/W UTIL | ||
| [Graphic] | PROPOSED L/S UTIL | ||
| ¤ | LIGHT STANDARD | ||
| ⌾ | POWER POLE | ||
| ┥ | ANCHOR |
Location Plan
Site Address: 33 HELMCKEN ROAD Legal Description: LOT A, SECTIONS 8 & 102, LAKE & ESQUIMALT DISTRICTS, PLAN EPP23184.
The location plan shows the site's proximity to:
- Helmcken Road
- Watkiss Way
- Burnside Road West
- V.G. General Hospital
Fire Truck Specifications (TOVR)
- Vehicle: TOVR
- Width: 2.60m
- Track: 2.60m
- Overall Length: 11.23m
- Wheelbase: 5.86m
- Front Overhang: 2.44m
- Lock to Lock Time: 6.00s
- Steering Angle: 45.0°
General Notes
THE LOCATION AND ELEVATION OF EXISTING UNDERGROUND SERVICES ON THIS DRAWING MAY NOT BE ACCURATE OR COMPLETE. HORIZONTAL AND VERTICAL LOCATIONS MUST BE CONFIRMED BY UTILITY COMPANIES AND THE CONTRACTOR PRIOR TO THE START OF ANY EXCAVATION.
Page 98
Extracted from: 2016 10 18 Council Agenda - Pdf

