Council Meeting/Documents/Average Finish Grade Calculation Map
Appendix

Average Finish Grade Calculation Map

July 19, 2016Page 731 section

Topographical map and calculations for determining the average finished grade of the site after development.

8.1c Development Permit No. 2016/05 - 1950 Watkiss Way
20.15 Average Finish Grade

1950 WATKISS WAY, VIEW ROYAL BC

Architectural site plan for 1950 Watkiss Way, showing topographical contour lines, building footprint with perimeter segment lengths, corner elevations, and detailed calculations for determining the average finish grade.
Architectural site plan for 1950 Watkiss Way, showing topographical contour lines, building footprint with perimeter segment lengths, corner elevations, and detailed calculations for determining the average finish grade.

Average Finish Grade

Calculations:

  • $\frac{(22.0 + 22.0)}{2} * 19.5 = 429.0$
  • $\frac{(22.0 + 22.0)}{2} * 24.7 = 543.4$
  • $\frac{(22.0 + 21.0)}{2} * 25.0 = 537.5$
  • $\frac{(21.0 + 18.0)}{2} * 19.5 = 380.3$
  • $\frac{(18.0 + 18.0)}{2} * 44.5 = 801.0$
  • $\frac{(18.0 + 22.0)}{2} * 44.3 = 886.0$

$\frac{429.0 + 543.4 + 537.5 + 380.3 + 801.0 + 886.0}{19.5 + 24.7 + 25.0 + 19.5 + 44.5 + 44.3} = * 20.15$ Average Finish Grade

Project Information:

D-ARCHITECTURE 6377 ICARUS DRIVE, NANAIMO, BC V9V 1N4 T: 250-933-1991, E: FIROUZLI@SHAW.CA DARYOUSH FIROUZLI ARCHITECTURE INC.

  • Scale: N/A
  • Date: July 7th 2016
  • Project No: 2639
  • Sheet Number: A0.2
  • Project: 1950 WATKISS WAY, VIEW ROYAL BC
  • Client: Denfor Investments Inc.
Page 73