Committee of the Whole/Documents/Attachment 4 - Flood Construction Level Assessment - 2818 Shoreline Drive
Appendix
Attachment 4 - Flood Construction Level Assessment - 2818 Shoreline Drive
Geotechnical assessment determining the flood construction level (FCL) and building setbacks required to address coastal flooding hazards.
September 22, 2023Ryzuk GeotechnicalFCL of 4.08 m CGVD28 (habitable space)Setback recommendation of 19m to 22m from natural boundary
Geotechnical assessment determining the flood construction level (FCL) and building setbacks required to address coastal flooding hazards.
Page 99–110
Extracted from: 2025 11 12 Committee of the Whole Meeting - Agenda - Pdf(223 pages total)










