This site is in beta — data may be incomplete and features are still being added.
Committee of the Whole/Documents/Attachment 3 2024 Non-core Projects
Appendix

Attachment 3 2024 Non-core Projects

July 9, 2024Page 1414 sections

A status report and budget summary for non-core projects spanning administration, finance, IT, protective services, and development.

3 MINUTES OF PREVIOUS MEETINGS, ADOPTION OF
Total Non-core Project budget: $1,407,255FireSmart program budget: $112,775Full-time fire personnel budget: $139,260Official community plan project budget: $100,000

May 13, 2024

Town of View Royal 45 View Royal Avenue Victoria, BC V9B 1A6

Attn: Mayor and Council/Town of View Royal Planning Department

RE: Rezoning Application for 346 Island Highway

Page 141

Project Overview

Urban West Architecture Inc. and Westplan Consulting Group in collaboration with Lombard North Group and McElhanney have prepared a rezoning application for a proposed multi-residential rental development to be located at 346 Island Highway. The site is located on the northern side of the Island Highway, abutted by the E&N Rail Trail and the Fort Victoria RV Park. The surrounding neighbourhood is primarily low-density residential.

The 94 unit proposed building is 7358.5 m² in size and is 6 storeys in height with two levels of below grade parking. The proposed Floor Space Ratio (FSR) is 2.06. The units will be a mix of one-to-three bedroom suites.

The design team consulted and collaborated with the Planning Department on several occasions and concluded that a six storey building with increased setbacks at the upper two levels (stepping the building) and a 2.06 FSR may be supported on the site.

Page 141

Public Engagement

A Public Information Meeting (PIM) was held for the proposed project on March 27, 2024 via Zoom. The invitation was sent to households within a 400m radius of the site. Eleven community members attended. The feedback and general conversation are summarized below:

  • Concerns about traffic on Island Highway and potential signal at Prince Robert Drive. General questions about traffic, parking and the Traffic Impact Assessment (TIA)
  • Concerns about blasting and pile driving
  • Questions about process and the Public Hearing, who the owner is and
  • Questions about the road improvements timing
Page 141

Policy Context

The proposed multi-residential rental development is 100% residential units and complies with the prescribed density for the Land Use Designation (LUD), therefore, under the new Bill 44 legislation a Public Hearing is not required.

Page 141

Document Images

(1)
Document image
Extracted from: 2024 07 09 Committee of the Whole Agenda - Agenda - Pdf