Detailed presentation slides on the 10-year roadmap for infrastructure improvements, policies, and programs to support active transportation.

3 MINUTES OF PREVIOUS MEETINGS, ADOPTION OF
10-year vision for reduced GHG emissions and local economic boost.Total short-term priority project cost estimate: $11,013,200.Major projects: Admirals Road Improvements ($3,742,300), Helmcken Interchange ($1,973,500), Six Mile Road ($1,037,800).

View Royal Active Transportation Network Plan

Committee of the Whole Presentation

April 11, 2023

Person riding a cargo bike with a passenger on a paved path next to a road
Person riding a cargo bike with a passenger on a paved path next to a road
Public engagement event with cyclists and a information tent on a trail
Public engagement event with cyclists and a information tent on a trail
Street level view of a crosswalk with pedestrian signals and signage
Street level view of a crosswalk with pedestrian signals and signage
Page 252–275

Agenda

  1. Project Overview
  2. Engagement Feedback
  3. Plan Framework
  4. Ultimate Network
  5. Short-term Priority Projects
  6. Programs & Policies
  7. Q&A
Aerial view of a roadway bridge showing a person on a scooter and vehicles
Aerial view of a roadway bridge showing a person on a scooter and vehicles
Page 252–275

1. Project Overview

  • Town’s first comprehensive document that provides a 10-year roadmap outlining the short-term infrastructure improvements, policies, and programs needed to prioritize active transportation in View Royal
  • Key objective of the ATNP is to identify gaps in the network and the priorities needed to address those gaps
Project timeline diagram showing five phases from March 2022 to April 2023
Project timeline diagram showing five phases from March 2022 to April 2023
Page 252–275

2. Engagement Approach & Feedback

Desired improvements:

  • Filling in gaps in the network
  • More separation from motor vehicle traffic
  • Greater protection for pedestrians with a focus on all ages and abilities
  • Safer routes to school
Infographic titled "Engagement by the Numbers" showing 706 survey responses, 76 ideas fair participants, 8 stakeholder interviews, and 29 bikeshop participants
Infographic titled "Engagement by the Numbers" showing 706 survey responses, 76 ideas fair participants, 8 stakeholder interviews, and 29 bikeshop participants
Page 252–275

3. Plan Framework

The 10-year vision:

View Royal is a dynamic, inclusive, and connected community that recognizes the impacts of climate change. Its active transportation network allows residents and visitors alike to move around the community safely by walking, cycling, or rolling. The active transportation network connects neighbourhoods, schools, employment destinations, natural environments including parks and green spaces, and with regional trails and neighbouring communities. A connected, compact, and safe network of active transportation facilities make driving the least attractive option and change the culture of transportation in View Royal, helping the town reduce GHG emissions, boost its local economy, and enhance its overall resilience—meeting the needs of the present and future generations.

Objectives

Objective #1: The Culture of Active Transportation checklist
Objective #1: The Culture of Active Transportation checklist
* Achieve the mode share target of 25% of all trips to work and school by an active mode * Achieve the climate target of a 36% reduction below 2007 levels * All elementary schools have participated in the Ready, Step, Roll Active School Travel Planning Program * Create an active transportation coordinator position at the Town
Objective #2: All Ages & Abilities Facilities checklist
Objective #2: All Ages & Abilities Facilities checklist
* A physically protected cycling facility is constructed on one east-west arterial corridor and one north-south arterial corridor * All upgrades to major intersections are designed to be universally accessible * There are zero injuries and/or fatalities for those who use active transportation modes * Bus stops with at least 10 boardings / alightings per day are connected to pedestrian facilities that are universally accessible
Objective #3: Local & Community Connections checklist
Objective #3: Local & Community Connections checklist
* Regional trails are accessible by an all ages and abilities facility * All Town parks provide short-term bicycle parking * All designated OCP Growth Areas (i.e., Future Town Centre, Neighbourhood centres, Community Corridors) are accessible by an all ages and abilities cycling facility * All designated OCP Growth Areas have pedestrian facilities on both sides of the street * All schools are accessible by an all ages and abilities pedestrian or cycling facility

Objective #4: Regional Connections

  • All regional trail crossings are designed to the same standard
  • All active transportation connections to neighbouring jurisdictions must be coordinated and conform to all ages and abilities standards
Page 252–275

4. Ultimate Networks

Future network informed by the following:

  • Baseline conditions analysis + results
  • Public engagement process
  • Transportation needs assessment
List of criteria informing the Pedestrian and Cycling Networks, including traffic speeds, volumes, school connections, and proximity to lower income areas
List of criteria informing the Pedestrian and Cycling Networks, including traffic speeds, volumes, school connections, and proximity to lower income areas
Map 5 - Ultimate Pedestrian Network for View Royal
Map 5 - Ultimate Pedestrian Network for View Royal
Map 6 - Ultimate Cycling Network for View Royal
Map 6 - Ultimate Cycling Network for View Royal
Page 252–275

5. Short-term Priority Projects

Critical Corridor Projects

Admirals Road (Island Highway to Hallowell Road)

  • Overall, most respondents in online survey no.2 were supportive of the proposed improvements with 45% (strongly support) and 27% (support)
  • Bikeshop participants identified Admirals Road as one of the most unsafe roads in the network for people walking, cycling, and rolling
  • While there is support for the improvements, there were concerns expressed about the removal of the southbound travel lane and the impact that would have to traffic operations and the road network
  • Class D Cost Estimate $3,742,300
Aerial rendering of Admirals Road showing proposed bike lanes, removal of a southbound lane, and improved sidewalks
Aerial rendering of Admirals Road showing proposed bike lanes, removal of a southbound lane, and improved sidewalks

Island Highway (E&N Rail Trail to Admirals Road)

  • Overall, most respondents in online survey no.2 were supportive of the proposed improvements with 53% (strongly support) and 31% (support)
  • Bikeshop participants were supportive of this improvement citing the importance of enhancing connectivity to the E&N Rail Trail and Shoreline Community Middle School
  • Class D Cost Estimate $335,000
Aerial view rendering of Island Highway showing a proposed new off-street multi-use pathway
Aerial view rendering of Island Highway showing a proposed new off-street multi-use pathway

Helmcken Interchange (Vickery Road to Watkiss Way)

  • Overall, most respondents in online survey no.2 were supportive of the proposed improvements with 44% (strongly support) and 21% (support)
  • Feedback in the first round of engagement identified the interchange as creating a major north-south divide in View Royal’s active transportation network
  • While there is support for the improvements, similar to Admirals Road, there were concerns expressed about the removal of the southbound travel lane on the bridge deck and the impact that would have to traffic operations and the road network
  • Class D Cost Estimate $1,973,500
Aerial rendering of the Helmcken Interchange showing proposed bicycle lanes and lane reconfigurations
Aerial rendering of the Helmcken Interchange showing proposed bicycle lanes and lane reconfigurations
Map 8 - Short-term Corridor Improvements labeled A through J
Map 8 - Short-term Corridor Improvements labeled A through J

Other Short-term Projects

List and graphic icons for short-term projects A through J with distance and cost estimates
List and graphic icons for short-term projects A through J with distance and cost estimates
Project Distance Cost
A. Helmcken Road (Watkiss Way to Burnside Rd) 210m $1,166,500
B. Watkiss Way (roundabout to Helmcken Rd) 185m $893,600
C. Burnside Road (Helmcken Rd to Saanich border) 260m $414,600
D. Vickery Road / St. Giles Road 650m $73,000
E. Six Mile Road (Island Hwy to Thetis Lake) 900m $1,037,800
F. Jedburgh Road (12 Jedburgh Rd to Helmcken Rd) 135m $192,100
G. Chancellor Avenue (Helmcken Rd to Galloping Goose) 175m $447,800
H. Glentana Road (Island Hwy to Admirals Rd) 300m $365,600
I. Talcott Road (Galloping Goose to Eagle View Elementary) 125m 193,400
J. Island Highway (Wilfret Rd to Hart Rd) 115m $178,000
Summary table of Action IDs and Class D Cost Estimates
Summary table of Action IDs and Class D Cost Estimates
Action ID & Project Name Class D Cost Estimate (2023 $)
1A Admirals Road (Island Hwy to Hallowell Rd) $3,742,300
1B Island Highway (E&N Rail Trail to Admirals Rd) $335,000
1C Helmcken Interchange (Watkiss Way to Vickery Rd) $1,973,500
1D Helmcken Road (Watkiss Way to Burnside Rd) $1,166,500
1E Watkiss Way (roundabout to Helmcken Rd) $893,600
1F Burnside Road (Helmcken Rd to Saanich border) $414,600
1G Vickery Road / St. Giles Road $73,000
1H Six Mile Road (Island Hwy to Thetis Lake) $1,037,800
1I Jedburgh Road (12 Jedburgh Rd to Helmcken Rd) $192,100
1J Chancellor Avenue (Helmcken Rd to Galloping Goose Regional Trail) $447,800
1K Glentana Road (Island Hwy to Admirals Rd) $365,600
1L Talcott Road (Galloping Goose Regional Trail to Eagle View Elementary) 193,400
1M Island Highway (Wilfret Rd to Hart Rd) $178,000
Total $11,013,200
Page 252–275

6. Programs & Policies

Descriptions and icons for various Active Transportation Programs & Policies
Descriptions and icons for various Active Transportation Programs & Policies

Bike to Work/School Week Bike to Work Week and Bike to School Week is a campaign hosted by various non-profit organizations that encourages employees and students to register to participate on a team and log their cycling commute trips for the week.

Staffing for Active Transportation Coordination Dedicated active transportation staff offer many benefits including ongoing support, programming, education campaigns, and in-house knowledge of contextual requirements relating to active transportation.

'Amazing Places' Walking Tour The Town could develop a walking tour that highlights pedestrian-friendly destinations to increase awareness of specific walking paths, trails and amenities.

Bicycle Skills Training The Town could partner with or provide funding support to local cycling advocacy organizations or non-profits to offer bicycle skills training courses.

Bike Parking Retrofit Program A program is for the Town to retrofit all of its municipally-owned short-term bike parking and work with business and commercial property owners to install or retrofit short-term bike parking to align with the BC Active Transportation Design Guide.

Bicycle Parking Zoning Bylaw Amendment Given the importance of bicycle parking to the success of any active transportation network, it is recommended that the Town update its Zoning Bylaw to align with best practices and the guidance outlined in the BC Active Transportation Design Guide.

Maintain Active Transportation Network The Town looks to implement the short-term priority projects outlined in the ATNP, it should ensure a robust maintenance program is in place that includes maintenance of all active transportation facilities.

Wayfinding Strategy Wayfinding refers to all of the infrastructure and systems associated with helping individuals to correctly orient themselves within their environment and conveniently reach their intended destination.

Page 252–275

THANK YOU!

Black and white landscape view of a suburban road seen from a bridge
Black and white landscape view of a suburban road seen from a bridge
Page 252–275

Document Images

(2)
Document image
Document image
Extracted from: 2023 04 11 Committee of the Whole Agenda - Agenda - Pdf