This site is in beta — data may be incomplete and features are still being added.
Committee of the Whole/Documents/Attachment 2 - Applicant Rationale Letters
Correspondence

Attachment 2 - Applicant Rationale Letters

April 11, 2023Pages 309–3141 section

Letters from VDA Architecture Limited explaining the design rationale, reasons for the new DP application, and justification for requested variances.

Dated April 4, 2023 and January 25, 2021Variance for building height from 13.5m to 16.90m requestedRequested setback projections for main entrance and balconies

Despite this absence, the Ready Step Roll planning initiative was prominently promoted at the ATNP open house.

In addition to addressing the above concerns, please consider the following:

Lower speed limit on Island Hwy to 40 and rename this non-highway Craigflower Road,

Prioritise safety; spread funding as broadly as possible

  • install curb plunk cycle lanes on Admirals.
  • convert all sweeping right turns throughout the town to hard rights.
  • fill trail ruts, install handrails, build steps rather than gravel slopes.

Helmcken overpass has sufficient cycling lanes but MOTI, Ministry of Transportation and Infrastructure should work with VR to address cycling lanes that cross the on/off ramps, and widen sidewalks as necessary.

Require Bus stop shelters at all stops, secure bike storage at major bus stops. Top Priority: sidewalks and bike lanes on both sides of the roadway along bus routes.

Include costing to implement a Five Year Sidewalk Masterplan. We need sidewalks on Watkiss Way, 6 Mile, and Admirals. Also need to focus on Hospital Trail, budget and negotiations.

Lobby the CRD to separate cyclists and pedestrians on the Galloping Goose and E&N Trail: create cycle highways that don’t negatively impact pedestrians, or transit users. Improve access points to these important regional trails

Consider rising temperatures: include necessary amenities in an app - seating, water fountains, shade, cooling, 110 outlet for mobility charging.

In summary, we question the effectiveness of the draft ATNP and respectfully request that council receive it tonight but delay approval until it meets all our collective needs. We see no point in adopting an unbalanced, flawed plan, even if it does mean View Royal risks losing the funding.

Thank you,
Cathie Blanchard, Ian Brown, Jane Devonshire, Linda Jeaurond.
For View Royal Climate Coalition, VRCC

Page 309–314
Extracted from: 2023 04 11 Committee of the Whole Agenda - Agenda - Pdf