This site is in beta — data may be incomplete and features are still being added.
Committee of the Whole/Documents/Parks & Environmental Services / Planning & Protective Services / Corporate Services / Integrated Water Services Presentation
Presentation

Parks & Environmental Services / Planning & Protective Services / Corporate Services / Integrated Water Services Presentation

June 13, 2023Pages 39–435 sections

A presentation by the Capital Regional District (CRD) Executive Leadership Team regarding various regional projects, including landfill management, housing programs, and water infrastructure upgrades.

4.a) Capital Regional District Executive Leadership Team, Re: Capital Regional District
Development of Renewal Natural Gas Facility at Hartland landfillAnalysis of a new scaled-up housing supply program for 2023-24Implementation of the Local Community Commission on SSIGoldstream Ave water main and new pump station at Rocky PointLarisa Hutcheson, Kevin Lorette, Kristen Morley, Ian Jesney

Parks & Environmental Services

Larisa Hutcheson

Portrait of Larisa Hutcheson
Portrait of Larisa Hutcheson

Departments:

  • Climate Action & Adaptation
  • Environmental Resource Management
  • Environmental Protection
  • Facilities Management & Engineering Services
  • Regional Parks
  • Panorama
  • SEAPARC

Highlights:

  • Development of Renewal Natural Gas Facility at Hartland landfill
  • Hartland landfill north liner system in preparation for Cells 4, 5 and 6
  • Regional Trail widening and lighting, Selkirk Trestle refurbishment
  • Biosolids management, short and long-term planning
  • Roll out of Home Energy Navigator Program
Person riding a cargo bike with a dog on a paved trail
Person riding a cargo bike with a dog on a paved trail
Aerial view of Hartland landfill construction site
Aerial view of Hartland landfill construction site
Page 39–43

Planning & Protective Services

Kevin Lorette

Portrait of Kevin Lorette
Portrait of Kevin Lorette

Departments:

  • Building Inspection
  • JDF Local Area Services
  • Protective Services
  • Regional Housing
  • Regional & Strategic Planning
  • Health & Capital Planning Strategies

Highlights:

  • Continued implementation of the Regional Housing First Program, Regional Housing Trust Fund and the Government of Canada Reaching Home Program
  • Analysis and development of a new scaled-up housing supply program for implementation in 2023-24
  • Community engagement, demolition and planning for redevelopment of Oak Bay Lodge
  • Ongoing upgrades and replacement of health facilities and medical equipment
Aerial view of a large residential building complex
Aerial view of a large residential building complex
Sign for Oak Bay Lodge at 2251
Sign for Oak Bay Lodge at 2251
Animal control officer kneeling with a black dog in a kennel area
Animal control officer kneeling with a black dog in a kennel area
Page 39–43

Corporate Services

Kristen Morley

Portrait of Kristen Morley
Portrait of Kristen Morley

Departments:

  • Legislative Services
  • Information Services
  • Legal Services & Risk Management
  • First Nations Relations
  • Real Estate Services & SGI Initiatives

Highlights:

  • Electronic Documents and Records Management system
  • Continued development of a First Nation Relations Strategic Plan and Engagement Framework
  • Implementation of the Local Community Commission on SSI
  • Support advancement of Southern Gulf Island initiatives including development of a Rural Housing Strategy and high-speed internet connectivity
Hands pointing at a screen on a laptop
Hands pointing at a screen on a laptop
Woman draped in a traditional patterned blanket standing by the water
Woman draped in a traditional patterned blanket standing by the water
Page 39–43

Integrated Water Services

Ian Jesney - Acting

Portrait of Ian Jesney
Portrait of Ian Jesney

Departments:

  • Water Operations
  • Wastewater Operations
  • Infrastructure Engineering
  • Watershed Protection
  • Customer & Technical Services

Highlights:

  • Goldstream Ave water main and new pump station and reservoir at Rocky Point
  • Construct new field operations centre building for Watershed Operations
  • Capital upgrades across local water services (dam repairs, distribution pipe, pump station replacements, treatment system improvements)
  • Odour control upgrades at Saanich Peninsula WWTP
  • Continue rehabilitation – Bowker Trunk Sewer and Marigold pump station
Road crew laying and compacting fresh asphalt
Road crew laying and compacting fresh asphalt
Worker in high-visibility gear using testing equipment at a roadside utility site
Worker in high-visibility gear using testing equipment at a roadside utility site
Aerial view of a wastewater treatment plant facility on a rocky shoreline
Aerial view of a wastewater treatment plant facility on a rocky shoreline
Page 39–43

Questions?

Landscape view of forested hills under a blue sky with distant snow-capped mountains
Landscape view of forested hills under a blue sky with distant snow-capped mountains
Page 39–43

Document Images

(5)
Document image
Document image
Document image
Document image
Document image
Extracted from: 2023 06 13 Committee of the Whole Agenda - Agenda - Pdf