Technical engineering report evaluating traffic impacts, parking supply, and cycling requirements for the proposed Eltham/Helmcken development.

December 1, 2023Addoz Engineering Inc.20-unit townhomes

A Transportation Review Report For RESIDENTIAL DEVELOPMENT – 20-UNIT TOWNHOMES

294 & 296 Eltham Road & 242 Helmcken Road, View Royal, Victoria, BC

Prepared for Jeffery Sengara, Owner

January 3, 2023, Updated on December 1, 2023

ADDOZ ENGINEERING INC 81 Evansridge Circle NW, Calgary, AB T3P0H9 Cell 1: 587-703-5222 Cell 2: 587-703-9321 Email: ealsaidi@addozeng.ca

REVIEWED By ileung at 4:20 pm, Dec 07, 2023 File: ENG2022-06 Conditions:

  1. Reviewed for rezoning only
  2. Onsite Parking to be reviewed further by Development Services

Page 226–235

TABLE OF CONTENTS

Section Title Page
1.0 INTRODUCTION 5
1.1 General 5
1.2 Planned Development 5
1.3 Purpose of Study 5
1.4 Methodologies 7
2.0 EXISTING CONDITIONS 8
2.1 Area Road Network 8
2.2 Existing Traffic Volumes and Conditions 8
2.4 Existing Heavy Vehicle Composition 11
3.0 PROJECTED TRAFFIC VOLUMES 12
3.1 Site Generated Trips 12
3.1.1 Pass-by Trips 12
3.1.2 Internal Trips 13
3.2 Trip Distribution 13
3.3 Trip Assignment 13
3.3.1 Site Generated Traffic Volumes 13
3.3.2 Post Development Traffic Volumes 13
4.0 EVALUATION AND RECOMMENDED IMPROVEMENTS 16
4.1 Level of Service Criteria for Intersections 16
4.2 Capacity and Level of Service Analyses 17
4.2.1 Existing 2022 Traffic Conditions 17
4.2.2 Post Development Traffic Conditions 18
4.3 Intersection Layout Assessment, Left Turn Requirement 18
4.4 Access and Major Intersections’ Sight Distance Review 21
5.0 PARKING AND TRAVEL DEMAND MANAGEMENT REVIEWS 29
5.1 Vehicle Parking Supply / Demand Analysis and Loading Requirement 29
5.2 Bicycle Parking Supply / Demand Analysis 29
5.3 Travel Demand Management 30
6.0 CONCLUSIONS AND RECOMMENDATIONS 31

Appendices: Appendix A: Project Development Site Plans Appendix B: Turning Movement Traffic Count Data Appendix C: Synchro - HCM 6th Edition Capacity Analysis Reports

List of Figures

Figure Title Page
Figure 1a Site Location Map 6
Figure 1b Local Context Aerial Map 6
Figure 1c Existing Intersection Lane Configuration and Control Type 9
Figure 2 Existing 2022 Peak Hour Traffic Volumes 10
Figure 3 Existing 2022 Pedestrian Crossing and Bicycle Peak Hour Volumes 10
Figure 4 Direction of Approach and Site Access Distribution 14
Figure 5 Site Generated Peak Hour Traffic Volumes 14
Figure 6 Post Development Peak Hour Traffic Volumes 15
Figure 7 Collision History at Helmcken Road and Eltham Intersection 20
Figure 8a Sight Distance and Visibility for 90° Intersection Approaches 22
Figure 8b Design Sight Distance For Departures From Stop Controlled Approach 25
Figure 9 Sight Distance Field Measurement at Helmcken Road and Eltham Road 27
Figure 10 Sight Distance Field Measurement at Access A1 on Eltham Road 28

List of Table

Table Title Page
Table 1 Adjacent Highway Heavy Vehicle Composition (in%) 11
Table 2 Trip Generation Rates, ITE Trip Generation Manual 12
Table 3 Projected Site-Generated Peak-Hour Volume 12
Table 4 Level of Service Criteria for Unsignalized Intersections 16
Table 5 Level of Service Criteria for Signalized Intersections 16
Table 6 Capacity Analysis for Existing 2022 Traffic Conditions 17
Table 7 Capacity Analysis for Post Development, Opening Traffic Conditions 18
Table 8 Town of View Royal's Parking Requirements (Supply / Demand Analysis) 29
Table 9 Town of View Royal's Bicycle Parking Requirements (Supply / Demand) 29

Page 226–235

1.0 INTRODUCTION

1.1 General

Mr. Jeffery Sengara retained Addoz Engineering Inc. to prepare a transportation review in support of the proposed Mixed-Use Residential Development, Townhomes to be in View Royal, Victoria, British Columbia. The proposed development will consist of a total of 20-Unit townhouses. The development will be located at 294 & 296 Eltham Road & 242 Helmcken Road, View Royal, BC. The project will be located on the northwestern quadrant of Helmcken Road and Eltham Road intersection. This transportation review is being prepared to assess potential transportation impacts of the proposed development and to satisfy View Royal's requirements for such a study as a result of the proposed development.

Figure 1a presents a site map that presents the general location of the proposed development, and Figure 1b presents a local context aerial map.

1.2 Planned Development

The proposed development will occupy the existing three houses currently located at 294 & 296 Eltham Road & 242 Helmcken Road, View Royal, BC. The proposed development will consist of 20-unit townhouses with attached car garages. The proposed site plans are attached in Appendix A of this report.

1.3 Purpose of Study

The primary purposes of this transportation review study are:

  • To evaluate the traffic operations and levels of service (LOS) at the following intersections:

    • Helmcken Road and Eltham Road intersection; and
    • Eltham Road and Site Access intersection.
  • To evaluate any potential project traffic impacts of the proposed development to the surrounding roadway network, and to determine if the roadways, site access and traffic circulations in the project vicinities would be suitable for the intended development and the amount of development traffic volumes anticipated.

  • To identify suitable intersection control and geometric configurations that would be required to properly service the proposed development including conducting left-turn lane assessment for the Helmcken Road and Eltham Road intersection, based on Transportation Association of Canada (TAC)’s standards.



  • Also, to identify any needed short-term and long-term roadway improvements in the project areas to enable acceptable traffic operations that would satisfy View Royal's requirements.

1.4 Methodologies

This transportation review utilizes the following evaluation methodologies:

  • Data collection including but not limited to existing roadway and intersection geometric characteristic, pavement markings, and traffic control types.

  • A new peak hour traffic count collected on a typical weekday at the major study intersection.

  • Trip generation estimate for the proposed development were based on appropriate Trip Generation land use categories available in the trip generation manual published by the Institute of Transportation Engineers (ITE), 11th Edition.

  • Distribution of the site generated trips to/from the development site based on population, land uses, roadway network, and existing traffic patterns in the project vicinities.

  • Assignment of the project trips to the adjacent roadways based on the proposed project site plan and the estimated roadway trip distribution characteristics.

  • Intersection layout assessment based on the Transportation Association of Canada’s standards will be completed to determine any needed improvements for the study intersection. The study will analyze whether there is a need for a left turn lane for either Helmcken Road or Eltham Road.

  • Sightline field measurement and assessment will be completed for the site access intersection and the Helmcken Road / Eltham Road intersection. The town indicated they have concerns with respect to the sightlines, both vertical and horizontal, as a result of this development.

  • Existing and Post Development traffic capacity analysis for the study area intersections and roadways to identify possible capacity constraints and to assess overall traffic impacts of the proposed development, which is based on the latest Highway Capacity Manual (HCM) methodologies by the Transportation Research Board, the US National Academies of Sciences, Engineering and Medicine.


Page 226–235

2.0 EXISTING CONDITIONS

2.1 Area Road Network

There are two roadways providing access to the site as described below. These roadways are Helmcken Road and Eltham Road. A brief description of each of these roadways follows.

Helmcken Road is a two-lane two-way undivided roadway that runs in the north / south directions in the vicinity of the proposed development and intersects with Eltham Road creating a T-intersection. Helmcken Road connects the areas south of Eltham Road to provincial Highway 1 and the areas to the north of Highway 1. The speed limit on Helmcken Road is posted at 40 Km / hr. in the vicinity of the proposed development. Helmcken Road has marked bicycle lanes on the northbound and southbound direction adjacent to vehicle travel lanes.

Eltham Road is a two-lane two-way undivided paved local roadway that runs in the east / west directions in the vicinity of the site. The speed limit on Eltham Road is not posted but the prima facie speed is 30 Km/hr.

The intersection of Helmcken Road and Eltham Road is a 3-leg unsignalized intersection with stop-control sign on Eltham Road approach and a free flow operation on Helmcken Road north / south approaches. This intersection has one left/right shared lane in the westbound direction, one shared through/left lane in southbound direction, and one through/right lane in the northbound direction. Refer to Figure 1c that presents the current intersection layout for more details.

2.2 Existing Traffic Volumes and Conditions

A field and desktop reconnaissance of the site and its surroundings was conducted to establish a database of the existing conditions. The peak period for the proposed residential development would typically occur during the weekday morning and afternoon periods. Turning movement traffic count data was collected on Tuesday, December 13, 2022 from 7:00 AM to 9:00 AM and from 4:00 PM to 6:00 PM for the a.m. and p.m. peak periods respectively at the following study intersection:

  • Helmcken Road and Eltham Road Intersection.

The Existing 2022 AM and PM peak-hour traffic volumes for the above intersection are illustrated on Figure 2. Details of the collected traffic count data for the study intersection are contained in Appendix B.

Additionally, the Existing 2022 bicycle traffic and pedestrian crossing the study intersection are presented on Figure 3. A review of Figure 3 indicates that observed bicycle traffic was low; however, pedestrian crossing was significant. The numbers of conflicting pedestrian and bicycle were considered in the Synchro capacity analyses for the study intersection.