Presentation: STORMONT ROAD TRAFFIC CALMING UPDATE
Slide deck presentation explaining the background, technical concerns with speed humps, and the proposed chicane solution for Stormont Road.
STORMONT ROAD TRAFFIC CALMING UPDATE
Feburary 15, 2023 Committee of the Whole Budget Meeting: Stormont Road Traffic Calming (N-081) – additional details to be provide on other potential options


BACKGROUND
- Traffic Counter: <50km/hr all instances
- Currently two (2) existing speed humps on Stormont Road
- Project included at request of Council
- Budget: $8,000

Council directed staff to seek other options due to Staff concerns regarding:
- Precedence setting
- Effectiveness of a third speed hump in significant short proximity of others
- Emergency service concerns
BACKGROUND (continued)
A third speed hump would cause distance between each other to be half to a third of the distance stipulated in the Traffic Calming Policy #5200-016
- Precedence (speeds and location of measures)
- Additional and cumulative delays for fire trucks and emergency services

OTHER MEASURES
- Chicane / Choker / Curb Extension
- Raised Medians (Intersection or Mid-Block)
- One Way Street
- No-Thru Street
Excerpt: BC Active Transportation Design Guide
CHICANE - EXAMPLE


CHICANE - PROPOSAL
Quick-Build Principles: Town of View Royal Active Transportation Network Plan:
- Flexible
- Inexpensive
- Allows for adjustments post implementation
- Does not require removal of existing infrastructure
- Geometric layout of the road does not require changes
- No significant impacts to utilities or drainage
City of Vancouver “Slow Streets Program” – Street Barrier Design for Narrow Streets

Stormont Road – Installation on Sidewalk Side of the Road

RECOMMENDATION
THAT the Committee recommend to Council that Staff proceed with installing a quick build chicane on Stormont Road as part of Capital Project N-081
Ivan Leung, P.Eng Director of Engineering & Parks Engineering@viewroyal.ca