This site is in beta — data may be incomplete and features are still being added.
Committee of the Whole/Documents/Presentation: DEVELOPMENT PERMIT 2021/01 - 1950 West Park Lane
Presentation

Presentation: DEVELOPMENT PERMIT 2021/01 - 1950 West Park Lane

March 9, 2021Pages 529–5414 sections

A slide deck presenting the background, proposal, and discussion points for the development permit application at 1950 West Park Lane.

15 residential units (3 triplexes, 3 duplexes)4.26 ha parcel10m fire fuel clearance areas

DEVELOPMENT PERMIT 2021/01

1950 West Park Lane

Committee of the Whole – March 9, 2020

Form & Character and Environmental Development Permit for Phase 3 townhouses at West Park at Thetis

  • A variance is requested
Site map showing the Subject Property at 1950 West Park Lane relative to Thetis Lake Regional Park and the Trans Canada Highway
Site map showing the Subject Property at 1950 West Park Lane relative to Thetis Lake Regional Park and the Trans Canada Highway
Page 529–541

BACKGROUND:

  • 4.26 ha parcel
  • Part of a six-phase comprehensive development.
  • The CD-23: Comprehensive Development (Thetis Lake) zone permits a total of 350 residential units on this parcel and the adjacent property 1910/1920 West Park Lane.
  • Access from West Park Lane is by easement
Multi-phase site development plan showing Phases 1 through 6, with Phase 3 highlighted as the Current Phase
Multi-phase site development plan showing Phases 1 through 6, with Phase 3 highlighted as the Current Phase
Page 529–541

PROPOSAL:

  • 15 residential units in three triplexes and three duplexes
Detailed Phase 3 site plan showing building blocks labeled L, M, N, O, P, and Q
Detailed Phase 3 site plan showing building blocks labeled L, M, N, O, P, and Q

Architectural Renderings and Materials

Architectural rendering of Block L, a single-story residential building
Architectural rendering of Block L, a single-story residential building
Architectural rendering of Block Q, a two-story residential building
Architectural rendering of Block Q, a two-story residential building

Color Palette:

  • Block L: Sea Haze (2137-50), Duxbury Gray (HC-163), Flint (AF-560), Cloud White (CC-40)
  • Blocks M, Q: Eclipse (2132-40), Pilgrim Haze (2132-50), Cloud White (CC-40)
  • Block N: Carolina Gull (2138-40), Puritan Gray (HC-164), Boothbay Gray (HC-165), Cloud White (CC-40)
  • Blocks O, P: Chelsea Gray (HC-168), Kendall Charcoal (HC-166), Storm (AF-700), Cloud White (CC-40)

Landscape Plan

Detailed Phase 3 Planting Plan including a plant schedule and planting notes
Detailed Phase 3 Planting Plan including a plant schedule and planting notes
Page 529–541

DISCUSSION:

  1. Relevant development permit guidelines
  2. Zoning requirements
  3. On-site servicing (overall requirements for the comprehensive development)
  4. Next steps toward Council consideration of the proposal

1. Development Permit Area Guidelines

Mixed Residential Development Permit Area (Form and Character)

a. The form and massing of buildings will be similar to Phases 1 and 2.

  • contemporary West Coast treatment: natural toned cementitious materials, mullioned window treatments, extensively glazed entry doors and windowed garage doors

b. Cladding includes horizontal plank and board & batten to provide variety and texture. In Phase 3, stone type cladding elements are introduced on Blocks L, N, O and P, which provides a substantial and higher quality finish.

c. Buildings arranged to follow the central driveway, which has been designed to minimize steep gradients as it traverses the sloping topography.

d. Lighting will be dark skies friendly. Street lighting will be LED, which provides good directed illumination, and will be located on the side of the main driveway furthest away from the park to minimize light intrusion.

Additional information to be provided.

Sensitive Terrestrial Ecosystems Development Permit Area (Environmental and Hazard)

  1. Already addressed in previous DPs: a. environmental impact and mitigation measures including steep slope and interface fire hazard management b. Clearing, blasting, and grading of this Phase 3 site with measures to: 1. Protect retained trees on the periphery (and in the park) 2. Address geotechnical / steep slope hazard management 3. Control sediment and erosion

  2. Interface fire hazard management requirements are addressed by including the following requirements as conditions: a. Keeping 10m low fire fuel areas between buildings and the forest edge b. Use of fire-resistant roofing and cladding materials c. Enclosed metal soffits d. Buildings to be sprinklered

2. Zoning

General

Section Description – CD-23 zone Required Proposed
12.23.3. Lot Size, minimum 4000m² 42,580 m²
12.23.3. Total number of residential units on all lands zoned CD-23 Max 350 Existing: 178
+ Proposed Ph. 3: 15
Total: 193
12.23.3. Total Floor Space Ratio on all lands zoned CD-23

Total CD-23 land area: 51,930m²
0.78:1 Existing: 10,200m²
+ Proposed: 2398m²
Floor space: 12,598m²

Total CD-23 FSR: 0.25:1
12.23.3. Floor Space Ratio on 1950 West Park Lane for Residential, Townhouse or Residential, Duplex use
Lot area: 42,580m²
0.5:1 Existing: 4827m²
+ Proposed: 2398m²
Floor space: 7225m²

Total lot FSR 0.17:1
12.23.3. Lot Coverage, maximum 50% (21297.6m²) To be determined
12.23.3. Impermeable Surface Coverage, maximum 50% (21297.6m²) To be determined

Setbacks

CD-23 zone Front Lot Line setback (West Park Lane) Rear Lot Line setback Side Lot Line setback (Thetis Lk Park) Setback to Thetis Lake Park
Required Min. 6.0m min. 6.0m Min. 4.5m Min. 10.0m
Block L >60.0m >60.0m 10.0m 10.0m
Block M >60.0m >40.0m 10.2m 10.2m
Block N >60.0m 12.9m 13.9m 13.9m
Block O >60.0m 14.8m >30.0m >30.0m
Block P >60.0m >60.0m >40.0m >40.0m
Block Q >60.0m >40.0m >50.0m >50.0m

Other

Section Description Required Proposed Variance
2.2 Definition of Grade Weighted average of the existing grade or the finished grade, whichever is lower Avg finished grade as designated on plans Avg finished grade as designated on plans
5.2.2 (e) Maximum gradient and cross slope parking 6 % residential zones To be determined

Additional information The following zoning requirements need to be confirmed: a. lot coverage b. impermeable surface area c. maximum gradient and cross slope of surface parking spaces

Phase 3 site plan identifying cross-section locations
Phase 3 site plan identifying cross-section locations
Engineering cross-sections A-A and B-B showing Existing Grade vs. Finished Grade for the development
Engineering cross-sections A-A and B-B showing Existing Grade vs. Finished Grade for the development

3. Servicing

  1. In 2019, water, sanitary sewer, and storm drain connections were installed at West Park Lane to accommodate the overall development.
  2. Site and servicing access is by easement over the adjoining parcel at 1910/1920 West Park Lane. A central driveway connects the phases.
  3. An erosion and sediment control plan was provided for this phase. The following is required prior to approval of the development permit: a. Confirm through engineered calculations that the sewer and drain connection is adequately sized for the proposed development b. Confirm that stormwater detention infrastructure installed during Phases 1 and 2 are sufficiently built to meet Town’s bylaw requirements.

It is recommended that a master erosion and sediment control plan be prepared by the Applicant’s engineer and provided to the Town for acceptance to streamline for management of this aspect in future phases of clearing and building.

4. Next Steps

Further information should be provided prior to Council consideration as follows:

Development Permit Area Guidelines a. Additional site sections should be provided to show how the buildings and driveway relate to the topography. b. A 1.9-2.0m chain link fence along the east boundary abutting Thetis Lake Regional Park would better address Crime Prevention Through Environmental Design (CPTED) principles than the proposed 1.5m chain link fence. c. Landscape plan i. Additional horizontal depth to garden beds adjacent to Thetis Lake Regional Park should be provided provide more space for screening and a transition between the development and the park ii. Note that planting is to be done in accordance with current BCSLA/BCNTA Standards iii. Note that planting areas are to be irrigated. iv. If an irrigation kiosk is proposed, show on plans. v. Show sidewalk to match civil plans d. Provide a cost estimate for hard and soft landscaping, e. Show any additional pad mounted transformer locations. f. Confirm if there will be any mechanical equipment on the roofs. g. If solid waste and recycling storage will be centralized, please show on plans. h. Commitment to an energy efficiency standard is supported.

Zoning a. Zoning requirements for lot coverage and impermeable surface need to be confirmed. b. The cross slopes of required driveway parking spaces along the main driveway should be confirmed.

Servicing a. Confirm that the sewer and drain connection is adequately sized for the proposed development b. Confirm that stormwater detention infrastructure installed for overall site is sufficient to meet the requirements of the Town’s bylaws.

It is recommended that a master erosion and sediment control plan be prepared by the Applicant’s engineer and provided to the Town for acceptance to streamline for management of this aspect in future phases of clearing and building.

Page 529–541

Document Images

(1)
Document image
Extracted from: 2021 03 09 Committee of the Whole Agenda - Agenda - Pdf