Conceptual Servicing Brief - Stormwater Model Analysis (Attachment 8)

December 14, 2021Pages 252–2531 section

Hydrological analysis and stormwater models for the property at 171 Island Highway, comparing pre-development and post-development runoff and storage requirements for a 10-year storm.

2. APPROVAL OF AGENDA (motion to approve)
Project Address: 171 Island HighwayPeak runoff (pre-development): 0.01255 m3/sStorage volume required: 25.1 m3Simulation period: June 07, 2021 to June 09, 2021

10 year storm:

Subcatchment S1

Objective functions for Runoff (m³/s)

From Jun 07, 2021 10:49 PM to Jun 09, 2021 1:11 AM (26.38 hours)

Metric S1 171 Island Highway Post-Development Model S1 171 Island Highway Pre-Development Model
Maximum Runoff (m³/s) 0.01827 0.01255
Minimum Runoff (m³/s) 0 0
Mean Runoff (m³/s) 0.00311 0.002418
Duration of Exceedances (h) 23.98 23.98
Duration of Deficits (h) 0.03333 4.217
Number of Exceedances 1 1
Number of Deficits 1 1
Volume of Exceedances (m³) 268.4 208.7
Volume of Deficits (m³) 0 0
Total Runoff (m³) 268.5 208.8
  • Runoff (m³/s) Exceedance: 0
  • Runoff (m³/s) Deficit: 0

Storage Analysis

Storage required for S1 171 Island Highway Post-Development Model

From Jun 07, 2021 10:49 PM to Jun 09, 2021 1:11 AM (26.38 hours)

  • Available storage before outflow: 0 m³
  • Maximum design outflow: 0.01255 m³/s

Storage volume required to obtain a peak flow of 0.01255 m³/s at location S1 is 25.1 m³.