EAGLE NEST DEVELOPMENT Traffic Impact Assessment Update
An updated traffic study assessing the impact of the proposed development on local road infrastructure and peak hour traffic volumes.
#501-740 Hillside Avenue Victoria, BC V8T 1Z4 T 250.388.9877 F 250.388.9879 wattconsultinggroup.com
EAGLE NEST DEVELOPMENT
Traffic Impact Assessment Update
Author: D. Ridsdale, BA, CTech. Reviewer: N. King, P. Eng, PTOE
Prepared for: Invictus Commercial Investment Corp Our File: 2497.B01 Date: January 10, 2019
TABLE OF CONTENTS
1.0 INTRODUCTION ................................................................................................... 1 2.0 EXISTING CONDITIONS ...................................................................................... 2 3.0 BACKGROUND VOLUMES AND CONDITIONS ................................................. 4 4.0 POST DEVELOPMENT CONDITIONS................................................................. 7 5.0 TRANSPORTATION DEMAND MANAGEMENT ............................................... 13 6.0 CONCLUSIONS.................................................................................................. 15 7.0 RECOMMENDATIONS....................................................................................... 16
APPENDICES
Appendix A: Synchro Background Appendix A: Synchro Background
LIST OF FIGURES
Figure 1: Study Area and Site Location ...................................................................................... 1 Figure 2: 2018 Existing Volumes and Levels of Service ............................................................. 4 Figure 3: Proposed Site Plan and Access .................................................................................. 7 Figure 4: Site Trip Assignment for Peak Hours .......................................................................... 10
LIST OF TABLES
Table 1: 2023 Background Conditions ....................................................................................... 6 Table 2: 2033 Background Conditions ....................................................................................... 6 Table 3: AM Peak Hour Trip Generation .................................................................................... 8 Table 4: PM Peak Hour Trip Generation .................................................................................... 8 Table 5: 2023 Post Development Conditions ............................................................................ 11 Table 6: 2033 Post Development Conditions ............................................................................ 12
