This site is in beta — data may be incomplete and features are still being added.
Committee of the Whole/Documents/EAGLE NEST DEVELOPMENT Traffic Impact Assessment Update
Appendix

EAGLE NEST DEVELOPMENT Traffic Impact Assessment Update

February 8, 2022Pages 317–3183 sections

An updated traffic study assessing the impact of the proposed development on local road infrastructure and peak hour traffic volumes.

9.2.3.a Draft Community Climate Action Strategy
January 10, 2019Watt Consulting GroupPrepared for Invictus Commercial Investment Corp

#501-740 Hillside Avenue Victoria, BC V8T 1Z4 T 250.388.9877 F 250.388.9879 wattconsultinggroup.com

Page 317–318

EAGLE NEST DEVELOPMENT

Traffic Impact Assessment Update

Author: D. Ridsdale, BA, CTech. Reviewer: N. King, P. Eng, PTOE

Prepared for: Invictus Commercial Investment Corp Our File: 2497.B01 Date: January 10, 2019

Page 317–318

TABLE OF CONTENTS

1.0 INTRODUCTION ................................................................................................... 1 2.0 EXISTING CONDITIONS ...................................................................................... 2 3.0 BACKGROUND VOLUMES AND CONDITIONS ................................................. 4 4.0 POST DEVELOPMENT CONDITIONS................................................................. 7 5.0 TRANSPORTATION DEMAND MANAGEMENT ............................................... 13 6.0 CONCLUSIONS.................................................................................................. 15 7.0 RECOMMENDATIONS....................................................................................... 16

APPENDICES

Appendix A: Synchro Background Appendix A: Synchro Background

LIST OF FIGURES

Figure 1: Study Area and Site Location ...................................................................................... 1 Figure 2: 2018 Existing Volumes and Levels of Service ............................................................. 4 Figure 3: Proposed Site Plan and Access .................................................................................. 7 Figure 4: Site Trip Assignment for Peak Hours .......................................................................... 10

LIST OF TABLES

Table 1: 2023 Background Conditions ....................................................................................... 6 Table 2: 2033 Background Conditions ....................................................................................... 6 Table 3: AM Peak Hour Trip Generation .................................................................................... 8 Table 4: PM Peak Hour Trip Generation .................................................................................... 8 Table 5: 2023 Post Development Conditions ............................................................................ 11 Table 6: 2033 Post Development Conditions ............................................................................ 12

Page 317–318

Document Images

(1)
Document image
Extracted from: 2022 02 08 Committee of the Whole Agenda - Agenda - Pdf