Appendix
Attachment 8 - Tree Management Plan
May 3, 2022Page 2411 section
Arborist plan showing trees to be retained or removed and protection instructions during construction.
Requires project arborist supervision for excavation near critical root zones.

Arborist Notes and Instructions:
- Project arborist to be onsite to supervise excavation required within the critical root zone of M4 for the proposed parkade ramp.
- Adjust tree fencing at time of excavation for the proposed above parking area — under the direction of the project arborist.
- Grind stump of 91.
- Project arborist to review the new stand edge after tree clearing has taken place. If trees do not appear to be windfirm — they may be recommended for removal.
- Project arborist to supervise excavation and stump removals required within the critical root zone of 84, 88, 89, 90, 81 for the proposed above ground parking (see hard surface above tree roots detail — appendix B of arborist report).
Page 241
Extracted from: 2022 05 03 Council Agenda - Agenda - Pdf