Council Meeting/Documents/Highway 1 McKenzie I/C to Colwood I/C Bus On Shoulder Project Update Meeting for Town of View Royal Council
Presentation

Highway 1 McKenzie I/C to Colwood I/C Bus On Shoulder Project Update Meeting for Town of View Royal Council

March 18, 2025Pages 17–3317 sections

Technical presentation regarding construction schedules, traffic management, and communication plans for the Highway 1 Bus on Shoulder Project.

Construction Start: Late March / Early April 2025Construction Complete: Fall 2027Speed limits reduced to 60 km/hr during active workNo closures on Sundays or long weekends

Highway 1 McKenzie I/C to Colwood I/C Bus On Shoulder Project

Project Update Meeting for Town of View Royal Council

March 18, 2025

Page 17–33

What’s Covered

  • Background
  • Project scope
  • Current status
  • Galloping Goose Trail Bridge improvements
  • Outfall at Portage Linear Park
  • Traffic Management
  • Night Work
  • Communications
Page 17–33

Background

Map showing the status of major transit projects serving the West Shore, including completed, construction, and not yet started phases
Map showing the status of major transit projects serving the West Shore, including completed, construction, and not yet started phases
Page 17–33

PROJECT SCOPE

Aerial map of the Highway 1 project area between Watkiss Way and McKenzie Avenue, north section
Aerial map of the Highway 1 project area between Watkiss Way and McKenzie Avenue, north section
Aerial map of the Highway 1 project area between Watkiss Way and McKenzie Avenue, south section
Aerial map of the Highway 1 project area between Watkiss Way and McKenzie Avenue, south section
Page 17–33

PROJECT SCOPE CROSS SECTION HELMCKEN TO COLWOOD

(Cross-section diagram illustrating highway layout including bus-on-shoulder lanes, travel lanes, paved shoulders, median swale, and ditching)

Page 17–33

PROJECT SCOPE CROSS SECTION EAST OF HELCKEN

(Cross-section diagram illustrating highway layout east of Helmcken, including bus-on-shoulder lanes, travel lanes, rock catchment ditch, and proximity to the Galloping Goose Trail)

Page 17–33

CURRENT PROJECT STATUS

  • Tendered – September to November 2024
  • Awarded – December 2024 – Jacob Bros. Construction
  • Construction Start – Late March / Early April 2025
  • Preconstruction Meetings – March 2025
  • Construction Complete – Fall 2027
Page 17–33

GALLOPING GOOSE TRAIL BRIDGE

Aerial rendering of the Galloping Goose Trail Bridge area showing the proposed structure and new planting areas near Watkiss Way and Craigflower Creek
Aerial rendering of the Galloping Goose Trail Bridge area showing the proposed structure and new planting areas near Watkiss Way and Craigflower Creek
Page 17–33

GALLOPING GOOSE TRAIL BRIDGE

(Technical engineering plan for the Galloping Goose Trail Bridge detailing planting areas, watermain locations, and rip rap treatment)

Page 17–33

BEAVER POND PLANTING AREA

(Environmental planting plan for the Beaver Pond area detailing existing trees to be retained and new planting zones between Burnside Road West and Trans-Canada Highway)

Page 17–33

Portage Inlet Park Outfall

Aerial photo of Portage Inlet Park along the Trans-Canada Highway identifying the location for existing culvert replacement and an improved outfall
Aerial photo of Portage Inlet Park along the Trans-Canada Highway identifying the location for existing culvert replacement and an improved outfall
Page 17–33

Portage Inlet Park Outfall

  • Arborist report completed and shared with Town of View Royal
  • 3 of 4 trees can be retained
  • Tree NT4 is the most at risk and will be replaced 3:1 if needed
  • Work will follow arborist’s recommendations
  • Work not anticipated in 2025
Page 17–33

Traffic Management

  • Speed: 60 km / hr during active work / 80 km / hr during periods of inactivity
  • No closures or stoppages on Sundays or long weekends (Friday noon to Tuesday noon)
  • No lane closures or stoppages from 5:30 a.m. until 8:00 p.m. GGT closures from 8:00 p.m. to 11:00 p.m.
  • Burnside Road On-Ramp closures from 8:00 p.m. to 05:30 a.m.
  • Helmcken lane closures from 10:00 p.m. to 5:30 a.m.
Page 17–33

Night Work

  • Generally, work will be completed during the day with a few exceptions:
    • Work to implementation of lane shifts on Highway 1
    • Blasting on north side of Highway 1 between Helmcken and McKenzie
    • Girder erection at GGT bridge
    • Paving works including final overlay
Page 17–33

Communications

  • MOTT website for this project is in place at: Highway 1 Bus on Shoulder McKenzie to Colwood - Province of British Columbia
  • E-mail address in website content: BusOnShoulders@gov.bc.ca
  • E-mails are processed regularly and answered. Will include Town of View Royal in response preparation as needed
Page 17–33

TOWN OF VIEW ROYAL QUESTIONS

Question mark icon
Question mark icon
Page 17–33

THANK YOU

Page 17–33

Document Images

(7)
Document image
Document image
Document image
Document image
Document image
Document image
Document image
Extracted from: 2025 03 18 Council Agenda - Agenda - Pdf