Engineering review of the footings for 12 Vickery Road.

1 CALL TO ORDER- Councillor Brown, Acting Mayor called the meeting to order at 7:00 p.m.
Date: 2020.04.07Finding: Approved with observations

PROJECT ADDRESS: 12 Vickery Rd, Victoria, BC
PROJECT NO.: 10441
DATE: 2020.04.07
TIME: 03:30pm

TYPE OF REVIEW:

  • FOOTINGS
  • FOUNDATION WALLS
  • SHEATHING
  • FRAMING
  • OTHER:

OBSERVATIONS:

  • Rebar and form work appear to be in the appropriate locations
  • All rebar is 10M, NOT 15M as specified - ok for footings
  • additional rebar sitting on top of footings not okay
CONCRETE: Reviewed N/A COMMENTS:
rebar in correct position: [X] [ ]
rebar right size and spacing: [X] [ ] 10M instead of 15M
hold-down anchorage in place: [X] [ ]
formwork generally as per plan: [X] [ ]
FRAMING: Reviewed N/A
conformance with truss spec: [ ] [ ]
conformance with I-joist drawings: [ ] [ ]
beam and girder bearing: [ ] [ ]
continuity of top plates: [ ] [ ]
lintels / openings: [ ] [ ]
shearwalls / fastening / holddowns: [ ] [ ]
continuity of tall walls: [ ] [ ]
blocking in floor system for point loads: [ ] [ ]
wall sheathing: [ ] [ ]
wind girts: [ ] [ ]
post to beam free standing: [ ] [ ]
fasteners in hardware: [ ] [ ]
shearwalls to floor system: [ ] [ ]
penetrations: [ ] [ ]
LLRS consistent?: [ ] [ ]

INSTRUCTIONS:

-All further construction needs to conform with our drawings and any changes/ variation must be reviewed by buepoint and approved on paper/ via email.

  • do not connect additional rebar or concrete to footings
  • the only rebar that can project out of the footings is rebar into the foundation wall
  • basement slab to be floating on grade - not attached to any other part of structure

[X] APPROVED
[ ] APPROVED PENDING PHOTOS
[ ] FURTHER REVIEW REQUIRED

REVIEWED BY: Matt Krahn

buepoint consulting ltd
5386 Miller Rd, Duncan, BC V9L 6R2
engineering@buepoint.com
(250) 597 2296

Page 44

Document Images

(2)
Document image
Document image
Extracted from: 2024 11 19 Council Agenda - Agenda - Pdf