Appendix
Attachment 4: 2021 06 07 - (buepoint) Footing Review
November 19, 2024Page 461 section
Engineering review of additional footing work.
Date: 2021.06.07Finding: Approved pending photos
Footing Review
PROJECT ADDRESS: 12 Vickery Road, View Royal, BC
PROJECT NO.: 10441
DEVELOPER:
DATE: 2021.06.07
CONTRACTOR:
TIME: 01:30pm
TYPE OF REVIEW:
[X] FOOTINGS
[ ] FOUNDATION WALLS
[ ] SHEATHING
[ ] FRAMING
[ ] OTHER:
OBSERVATIONS:
- Additional opening added for temporary doorway - OK
- Remainder of interior foundation has been prepared in general accordance with design
| CONCRETE | Reviewed | N/A | COMMENTS: |
|---|---|---|---|
| rebar in correct position: | [X] | [ ] | |
| rebar right size and spacing: | [X] | [ ] | |
| hold-down anchorage in place: | [X] | [ ] | |
| formwork generally as per plan: | [X] | [ ] |
| FRAMING | Reviewed | N/A |
|---|---|---|
| conformance with truss spec: | [ ] | [ ] |
| conformance with I-joist drawings: | [ ] | [ ] |
| beam and girder bearing: | [ ] | [ ] |
| continuity of top plates: | [ ] | [ ] |
| lintels / openings: | [ ] | [ ] |
| shearwalls / fastening / holddowns: | [ ] | [ ] |
| continuity of tall walls: | [ ] | [ ] |
| blocking in floor system for point loads: | [ ] | [ ] |
| wall sheathing: | [ ] | [ ] |
| wind girts: | [ ] | [ ] |
| post to beam free standing: | [ ] | [ ] |
| fasteners in hardware: | [ ] | [ ] |
| shearwalls to floor system: | [ ] | [ ] |
| penetrations: | [ ] | [ ] |
| LLRS consistent?: | [ ] | [ ] |
INSTRUCTIONS:
- Add one corner bar at top of each intersection
[ ] APPROVED
[X] APPROVED PENDING PHOTOS
[ ] FURTHER REVIEW REQUIRED
REVIEWED BY: Mark Buesink, P.Eng.
buepoint consulting ltd
4740 Appaloosa Way, Duncan, BC V9L 6J1
engineering@buepoint.com
(250) 597 2296
Page 46
Extracted from: 2024 11 19 Council Agenda - Agenda - Pdf