This site is in beta — data may be incomplete and features are still being added.
Council Meeting/Documents/Attachment 5: DP1.0 - Site Plan
Appendix

Attachment 5: DP1.0 - Site Plan

March 7, 2017Page 351 section

Detailed site plan for Eagle Creek Village Phase 2 - North Building.

1. CALL TO ORDER
North Building Main Floor T.O.S Geo. 27.00m

Eagle Creek Village Phase 2 - North Bldg

Town of View Royal, British Columbia

Sheet Notes

  1. Site survey information, taken from information provided by McElhanney Associates Land Surveying Ltd. General contractor to consult with civil engineer to maintain/establish property line, datum and building location.
  2. General contractor to coordinate all utility line connections with Town of View Royal.
  3. Refer to landscape architect's drawings and specs for all landscaping, sitegrading, site drainage and storm water management.
  4. Building outline represents edge of slab (main level). All dimensions shown are to grid lines.
  5. Refer to civil engineer's drawings and specs for all grading in relation to the site, retaining walls & drainage.
  6. Refer to electrical drawings for all utility connections.
  7. General contractor to patch and make good all landscaping, walkways, and roadwork damaged during construction.
  8. This plan is issued for the purpose of positioning the building in relation to the site. Refer to engineer's and landscape architect's drawings for all other site information.
  9. Unless otherwise noted all dimensions to the property line are perpendicular to the property line.
  10. Refer to civil drawings for fire truck access.
  11. Barrier-free access, curb cuts and ramps to conform to BC Building Code.
  12. Crosswalks and handicapped parking symbols to be painted on asphalt per landscape drawings.
  13. Maximum permitted stalls for all parking areas is 39.

Legend

  • Proposed New Building Footprint
  • Side Walk & Conc. Curb
  • Landscape Planter (Control Joint Pattern Typ.) (See Landscape Plan for control joint pattern)
  • Landscape Planter (Stamped/Colour Location) (See Landscape Plan for stamped/colour locations)
  • Landscaped Area, Slope

Keynote Legend

  1. Trench Drain
  2. Reserved
  3. Roof Overhang/Canopy Above
  4. Fire Hydrant - See Civil Engineering Drawings
  5. Manhole - See Civil Engineering Drawings
  6. Roll Curb
  7. Pad-mounted Transformer
  8. Entry Sign
  9. Telus/Shaw Service Point
  10. Catch Basin - See Civil Engineering Drawings
  11. Bicycle Racks (6 spaces)
  12. Directional Signage for Pathway to Park
  13. Black Metal Railing on Top of Conc. Retaining
  14. Electric Car Charging Station

Site Data

North Building Phase B

  • Floor Area: 1605 SQ.M.
  • Main Floor T.O.S GEO. 27.00M = 100.00

Existing South Building Phase A (Approved)

  • Floor Area: 1209 SQ.M.
  • T.C.S GEO. 27.0M = 100.00

Site Detail Section (2 / DP1.0)

  • Weep holes to be placed at base of wall and at mid-height, min. 100mm dia. sloped to drain to wall face @ 2.0m c/c.
  • Steel reinforcement to be placed/drilled at 1.8m c/c along base of wall, steel to be 20M rebar drilled 400mm into intact rock and fully grouted or epoxied.
  • All rock wall/boulder interfaces to be set in wet concrete.

Revision History

# Date Remarks
1 NOV. 10, 2016 ISSUED FOR DP
2 JAN 25 2017 COMMITTEE OF WHOLE REVISIONS

Project Information

  • Drawn: KN
  • Checked: IM
  • Project Number: 11 14 032
  • Sheet Number: DP1.0
  • Firm: Omicron Architecture Engineering Ltd.
  • Address: 5th Floor, Cascade Tower, 333 - 4th Avenue SW, Calgary, AB T2P 3L9
  • Phone: 1-877-632-3350
Page 35
Extracted from: 2017 03 07 Council Agenda - Agenda - Pdf