Council Meeting/Documents/Attachment 6: DP1.1 - North-I Building Site Sections
Appendix

Attachment 6: DP1.1 - North-I Building Site Sections

March 7, 2017Page 362 sections

Cross-sectional drawings of the North Building showing floor levels and grade relationships.

1. CALL TO ORDER
21.96m building height above calculated avg. grade

Eagle Creek Village Phase 2 - North Bldg

Town of View Royal, British Columbia

OMICRON ARCHITECTURE ENGINEERING LTD. 10th Floor, Canadian Centre 833 - 4th Avenue SW Calgary, AB T2P 3T5 CANADA T: 403 262 9733 F: 403 262 9750 www.omicroncanada.com

# Date Remarks
1 NOV 18, 2016 ISSUED FOR DP
2 JAN 23, 2017 COMMITTEE OF WHOLE REVISIONS
Page 36

NORTH BUILDING SITE SECTIONS

Project Number: 11 14 032 Drawing Number: DP1.1 Date: February 1, 2017 Drawn: RI Checked: IM

1 SITE SECTION

Scale: 1:150

Elevation and Level Data:

  • T.O. SIXTH FLOOR WALL FRAMING: 115.71
  • T.O. FIFTH FLOOR CONCRETE TOPPING: 112.42
  • T.O. FOURTH FLOOR CONCRETE TOPPING: 109.13
  • T.O. THIRD FLOOR CONCRETE TOPPING: 106.14
  • T.O. SECOND FLOOR CONCRETE TOPPING: 103.15
  • T.O. PARKADE/MAIN FLOOR SLAB ON GRADE: 100.10 (27.0m GEODETIC)
  • T.O. LOWER LEVEL PARKING SLAB: 97.00

Site Notes:

  • Parkade Ramp: 12.3% Grade
  • Parkade Entrance
  • Upper Parkade & Entrance
  • Lower Parkade (L2)
  • 21.90 BUILDING HEIGHT ABOVE CALCULATED AVG. GRADE
  • MAXIMUM BUILDING HEIGHT (GEODETIC) 44.97m

2 SITE SECTION

Scale: 1:150

Level Labels:

  • 6th Floor
  • 5th Floor
  • 4th Floor
  • 3rd Floor
  • 2nd Floor
  • Upper Parkade (L2) & Main Entrance
  • Lower Parkade

Site Notes:

  • Parkade Entrance: 15% Grade

Legal Disclaimer: This drawing is a copyright instrument of service and remains the property of the Consultant. Information contained herein is for the use of the Client for the specific purpose of the current project only. Otherwise consultant must be used for reproduction in whole or in part without written permission. Drawings shall not be scaled. The Contractor shall verify and be responsible for all dimensions, site conditions, and report any errors or omissions to the Consultant before proceeding with the work. All work shall conform to the latest editions of local, provincial, and national codes and bylaws. Referenced codes and symbols: A = Architectural, E = Electrical, S = Structural, M = Mechanical/HVAC, P = Plumbing, C = Civil, FP = Fire Protection, L = Landscape, I = Interior.

Page 36