This site is in beta — data may be incomplete and features are still being added.
Council Meeting/Documents/Attachment 7: DP1.2 - Site Section Through Phase 1 & 2
Appendix

Attachment 7: DP1.2 - Site Section Through Phase 1 & 2

March 7, 2017Page 371 section

Site section showing the spatial relationship between the North Building (Phase 2) and South Building (Phase 1).

1. CALL TO ORDER

OMICRON ARCHITECTURE ENGINEERING LTD.

Address: 10th Floor, Canadian Centre 833 - 4th Avenue SW Calgary, AB T2P 3T5 CANADA Toll-free: 1.877.632.3350 T: 403.262.1733 F: 403.262.9750 www.omicronae.com

Project: Eagle Creek Village Phase 2 - North Bldg Town of View Royal, British Columbia

Revision History

# Date Remarks
1 NOV 14, 2014 ISSUED FOR DP
2 JAN 23, 2017 COMMITTEE OF WHOLE REVISIONS

Drawing Details

  • Title: SITE SECTION THROUGH PHASE 1 & 2
  • Drawn: RI
  • Checked: IM
  • Project Number: 11 14 032
  • Sheet Number: DP1.2

Site Drawings

General Notes and Disclaimer

This drawing is a copyright instrument of service and remains the property of the Consultant. It is issued for reference only. Other copies of these drawings may not be used or reproduced in any way without written permission. Drawings are not to be scaled. The Contractor shall verify and be responsible for all dimensions and conditions on the job... be used for the execution of the work. The Contractor shall ensure that all previous issues of this drawing are marked "Superseded" with reference to the latest issue, and used for historical purposes only.

Abbreviations:

  • A - Architectural
  • S - Structural
  • M - Mechanical (HVAC)
  • P - Plumbing
  • E - Electrical
  • FP - Fire Protection
  • L - Landscape
  • C - Civil
Page 37
Extracted from: 2017 03 07 Council Agenda - Agenda - Pdf