Proposed underground parking drawing illustrating stalls and bicycle storage for 280 Island Highway.

1 CALL TO ORDER
280 Island Highway33 underground stalls37 Class 1 Bicycle storage spacesDated October 25, 2019

PROPOSED

Architectural drawing titled "1 UNDERGROUND PARKING" showing the layout of a subterranean parking level. The plan includes 33 underground stalls and 7 surface stalls for a total of 40 stalls. It also depicts a bicycle storage area for 37 Class 1 bikes, storage lockers, mechanical/sprinkler rooms, an electrical room, and a vestibule. Structural grid lines A through H and 1 through 7 are marked.
Architectural drawing titled "1 UNDERGROUND PARKING" showing the layout of a subterranean parking level. The plan includes 33 underground stalls and 7 surface stalls for a total of 40 stalls. It also depicts a bicycle storage area for 37 Class 1 bikes, storage lockers, mechanical/sprinkler rooms, an electrical room, and a vestibule. Structural grid lines A through H and 1 through 7 are marked.

WALL ASSEMBLY SCHEDULE:

FLOOR ASSEMBLIES:

  • F1 SLAB ON GRADE:
    • REINFORCED CONCRETE SLAB AS PER STRUCTURAL DRAWINGS
    • 10 MIL POLY MOISTURE BARRIER
    • 2" RIGID INSULATION
    • 4" [100] COMPACT GRANULAR FILL
    • UNDISTURBED BEARING OR COMPACTED ENGINEERED FILL.
  • F2 WOOD FLOOR ASSEMBLY: (F.R.R. 1 HR., STC 55)
    • FINISHED FLOOR AS PER FINISH SCHEDULE
    • FLOOR SYSTEM (SEE STRUCTURAL)
    • 3/4" @ 12" O.C. (305mm) STEEL STRAPPING @ 16" (400mm) O.C.
    • 2 LAYERS 5/8" (15.9mm) TYPE 'X' G.W.B.
    • FLOOR TYPE B-74 B.C.B.C. 2012.
  • F3 CONCRETE SUSPENDED SLAB: (OCCUPIED SPACE - HEATED)
    • FINISHED FLOORING PER FINISH SCHEDULE
    • REINFORCED CONCRETE SLAB - SEE STRUCTURAL
    • 2" [50] RIGID NON-COMBUSTIBLE INSULATION.
  • F3a CONCRETE SUSPENDED SLAB: (LANDSCAPE AREA)
    • EARTH FILL (SEE LANDSCAPE)
    • 4" [100] DRAINAGE FILL WITH FILTER CLOTH
    • 2 PLY TORCH-ON MEMBRANE
    • REINFORCED CONCRETE SLAB - SEE STRUCTURAL.
  • F4 SUSPENDED DECK: (EXPOSED WOOD ASSEMBLY)
    • CEDAR DECKING ON 2x4 SLEEPERS
    • P.T.M. VENTED SOFFIT.
  • F5 INTERIOR FLOOR OVER EXTERIOR SPACE: (F.R.R. 1.5 HR., STC 55)
    • FINISHED FLOORING AS PER FINISH SCHEDULE
    • 1 1/2" (38mm) CONCRETE OVERLAY
    • FLOOR SYSTEM (SEE STRUCTURAL)
    • SPRAY FOAM INSULATION TO JOIST CAVITIES (R28) MIN. R-VALUE
    • 7/8" RESILIENT METAL FURRING CHANNELS @ 12" O.C.
    • 2 LAYERS 5/8" (15.9mm) TYPE 'X' G.W.B.
  • F6 DECK OVER INTERIOR SPACE: (OCCUPIED SPACE - HEATED)
    • CONCRETE PAVERS ON PEDESTALS
    • 2 PLY SBS MODIFIED BITUMINOUS MEMBRANE
    • 1/2" PROTECTION BOARD
    • RIGID INSULATION TO R40
    • VAPOUR BARRIER
    • REINFORCED CONCRETE SLAB - SEE STRUCTURAL
    • 1/2" GYPSUM WALLBOARD ON WOOD STRAPPING
    • CROSS STRAPPING TO CREATE 3.5" min. BETWEEN INSUL. AND SHEATHING
    • 5/8" TYPE 'X' G.W.B. AT CEILING ON RESILIENT METAL FURRING CHANNEL
    • 1 LAYER 5/8" TYPE X G.W.B.

FOUNDATION / EXTERIOR WALL ASSEMBLIES:

  • W1 FOUNDATION WALL ASSEMBLY (BELOW GRADE):
    • GRANULAR BACKFILL
    • MEMBRANE
    • DAMPPROOFING (IF REQUIRED)
    • REINFORCED CONCRETE WALL (SEE STRUC.).
  • W2 EXTERIOR WALL ASSEMBLY (T&G WOOD RAINSCREEN):
    • WOOD SIDING AS PER SCHEDULE
    • 3/4" x 2-1/2" @ 16" P.T. VERT. STRAPPING
    • 3/4" @ 16" HORIZ. P.T. STRAPPING AT AREAS OF VERTICAL SIDING
    • PERFORATED ALUMINUM BUG SCREEN AT TOP AND BOTTOM VENT CAVITIES
    • 1/2" EXTERIOR PLY SHEATHING
    • 2x6 WOOD STUDS @ 16" O.C. W/ R22 FRICTION FIT INSULATION TO JOIST CAVITIES
    • 6 MIL POLY VAPOUR BARRIER
    • 1/2" G.W.B.
  • W2a W2 WITH SEISMIC SHEATHING WHERE REQUIRED. SEE STRUCTURAL.
  • W3 EXTERIOR WALL ASSEMBLY (STUCCO RAINSCREEN FINISH):
    • ACRYLIC STUCCO (3 COATS)
    • RAIN-SCREEN MEMBRANE W/ SLIP SHEET
    • 1/2" EXTERIOR PLY SHEATHING
    • 1 x 3 [19 x 76] V. T. VERT. STRAPPING AT 16" [400] O.C.
    • PERFORATED ALUMINUM BUG SCREEN AT TOP AND BOTTOM VENT CAVITIES
    • 1/2" (12.7) PLY SHEATHING
    • 2x6 WOOD STUDS @ 16" O.C. W/ R22 FRICTION FIT BATT INSULATION IN CAVITIES
    • 6 MIL POLY VAPOUR BARRIER
    • 5/8" TYPE 'X' G.W.B. ON INTERIOR FINISH SIDE.
  • W3a W3 WITH SEISMIC SHEATHING WHERE REQUIRED. SEE STRUCTURAL.
  • W5 CONCRETE MASONRY: (HOLLOW CORE CONCRETE MASONRY UNIT - CMU)
    • EXTERIOR FINISH AS PER SCHEDULE
    • CONCRETE BLOCK (8" - 200mm)
    • WALL TYPE B-36 B.C.B.C. 2012.

INT. PARTITION / SHAFT WALL ASSEMBLIES:

  • P1 PARTITION ASSEMBLY: WALL TYPE W4 - STC. 32 B.C.B.C. 2012
    • WALL FINISH AS PER FINISH SCHEDULE ON 1/2" G.W.B. BOTH SIDES OF 1/2" (12.7) PLYWOOD SHEATHING @ 16" O.C., OR
    • 2x4 WOOD STUDS @ 16" [400] O.C. (MIN.), WITH ACOUSTIC BATT INSUL. TO STUD CAVITIES
    • WALL FINISH AS PER ROOM FINISH SCHEDULE.
  • P2 PARTY WALL SHEAR ASSEMBLY: (1 HR. F.R.R. STC 55) WALL TYPE W14a B.C.B.C. 2012
    • WALL FINISH AS PER ROOM FINISH SCHEDULE
    • 2 LAYERS 5/8" TYPE 'C' G.W.B. ON ONE SIDE
    • 1" (25.4) AIR SEPARATION
    • 1/2" PLYWOOD SHEATHING @ 16" O.C. EACH SIDE
    • 2x4 WOOD STUDS @ 16" O.C. EACH SIDE
    • 3 1/2" MIN. MINERAL FIBRE INSUL. TO STUD CAVITIES
    • 2 LAYERS 5/8" TYPE 'X' G.W.B. ON OTHER SIDE
    • NOTE: WHERE CORNER WALL IS SHEAR WALL REQUIRE THE FOLLOWING: 5/8" TYPE 'X' G.W.B. ON INTERIOR CORRIDOR SIDE. SEE STRUCTURAL.
  • P3 CORRIDOR WALL ASSEMBLY: (1 HR. F.R.R. STC 50) WALL TYPE W11a B.C.B.C. 2012
    • WALL FINISH AS PER FINISH SCHEDULE
    • 2 LAYERS 5/8" TYPE 'X' G.W.B.
    • 2 ROWS 2x3" (38 x 89) WOOD STUDS AT 16" [400] O.C. STAGGERED, ON COMMON 2x6" (38 x 140) WOOD PLATES
    • 3 1/2" MIN. MINERAL FIBRE INSUL. TO STUD CAVITIES
    • RESILIENT METAL CHANNELS @ 16" [400] O.C. (LOCATED AS PER SPECIFICATION).
  • P3a CORRIDOR WALL SHEAR ASSEMBLY:
    • WALL FINISH BY FINISH SCHEDULE WHERE REQUIRED
    • RESILIENT CHANNELS @ 16" O.C. AS PER W11a
    • 2 LAYERS 5/8" TYPE 'X' G.W.B.
    • 1/2" PLYWOOD CORRIDOR SIDE
    • SEE STRUCTURAL.
  • P4 ELEVATOR SHAFT ASSEMBLY:
    • 5/8" FIRE-RATED BOARD (BLOCK OR F.R.R.)
    • 2x4 WOOD STUDS
    • WOOD BEARING WALL AS REQUIRED, SEE STRUCTURAL
    • TWO LAYERS 5/8" G.W.B TO BE APPLIED TO ALL EXPOSED FACES.
  • P4a ELEVATOR SHAFT ASSEMBLY - WOOD FRAME:
    • AS PER P4 BUT AS REQUIRED
    • 2x4 WOOD WALL AS REQUIRED, SEE STRUCTURAL
    • TWO LAYERS 5/8" G.W.B TO BE APPLIED TO ALL EXPOSED FACES.
  • P5 RATED WALL ASSEMBLY: (1 HR. F.R.R. STC 54) WALL TYPE W4b B.C.B.C. 2012
    • FINISH WALL PER FINISH SCHEDULE
    • 1 LAYER 5/8" TYPE 'X' G.W.B.
    • 1 LAYER 5/8" TYPE 'X' G.W.B. (TOTAL 2x5/8" G.W.B.)
    • 2x4 (38x89) WOOD STUDS @ 16" (400) O.C. EACH SIDE
    • 1 1/2" [38] ACOUSTIC BATT INSUL. TO STUD CAVITIES
    • RESILIENT METAL CHANNELS @ 16" (400) O.C.
    • 2 LAYERS 5/8" TYPE 'X' G.W.B.
  • P5a RATED SHAFT WALL ASSEMBLY: (1 HR. F.R.R. STC 50)
    • 2 LAYERS 5/8" TYPE 'X' G.W.B. ON SEMI-REFLECTIVE/REFLECTIVE PLATES AT STUD TOP & BOTTOM
    • 2x4 WOOD STUDS @ 16" O.C. (400mm)
    • 3 1/2" MIN. MINERAL FIBRE INSUL. TO STUD CAVITIES
    • 5/8" FIRE-RATED GYPSUM LINER PANEL.
  • P7 CONCRETE WALL: SEE STRUCTURAL.
  • P8 PARTITION ASSEMBLY: WALL TYPE W4 - STC. 35 B.C.B.C. 2012
    • WALL FINISH AS PER ROOM FINISH SCHEDULE
    • 2 LAYERS 5/8" G.W.B. ON BOTH SIDES OF 3 5/8" (92) METAL STUD @ 16" O.C.
    • 3 1/2" (89) ACOUSTIC BATT INSUL. TO STUD CAVITIES.
  • P9 PARTITION ASSEMBLY: (1.5 HR. F.R.R. STC. 55)
    • 2 LAYERS 5/8" TYPE 'X' G.W.B. BOTH SIDES OF 3 5/8" (92) METAL STUD @ 16" O.C.
    • 3 1/2" [89] ACOUSTIC BATT INSUL. TO STUD CAVITIES.
Page 205

ROOF ASSEMBLY:

  • R1 FLAT ROOF ASSEMBLY:
    • 2 PLY SBS MODIFIED BITUMINOUS MEMBRANE
    • 180 FR GRANULAR CAP SHEET ON
    • 180 BASE SHEET
    • 1/2" PROTECTION BOARD
    • POLY ISOCYANURATE INSULATION TO ACHIEVE R40
    • VAPOUR RETARDER MEMBRANE
    • 5/8" DENS DECK SHEATHING AS PER STRUCTURAL
    • 6 MIL POLY VAPOUR BARRIER
    • PLYWOOD ROOF SHEATHING.
  • R2 SLOPED ROOF ASSEMBLY:
    • 2 PLY SBS MODIFIED BITUMINOUS MEMBRANE
    • 180 FR GRANULAR CAP SHEET ON
    • 180 BASE SHEET
    • 1/2" PROTECTION BOARD
    • 5/8" DENS DECK SHEATHING AS PER STRUCTURAL ON T&G WOOD DECKING
    • MINIMUM R40 RIGID INSULATION
    • VENTILATED SPACE AS PER BCBC BETWEEN INSULATION AND SHEATHING (TRANSFERRED TO VENT AT PEAK)
    • RIGID INSULATION OVER ROOF
    • 6 MIL POLY VAPOUR / AIR BARRIER
    • 1 LAYER 5/8" TYPE 'X' G.W.B. INTERIOR.
No. Issued / Revisions Date
13 DP AMENDMENT 25 OCT '19
12 ISSUED FOR CONSTRUCTION 5 JULY '18
11 ISSUED FOR CONSTRUCTION 7 MAY '18
10 ISSUED FOR CONSTRUCTION 1 MAY '18
9 ISSUED FOR CONSTRUCTION 19 APRIL '18
8 ISSUED FOR CONSTRUCTION 15 FEB '18
7 BUILDING PERMIT 18 AUG '17
6 BUILDING PERMIT 20 JUNE '17
5 FOUNDATION PERMIT 30 MARCH '17
4 DEVELOPMENT PERMIT 9 SEPT '16
3 DEVELOPMENT PERMIT 9 JUNE '16
2 DEVELOPMENT PERMIT 31 MAY '16
1 DEVELOPMENT PERMIT 11 MAY '16

alan lowe architect inc. 118 - 210 Erie Street Victoria, British Columbia | T 250.380.2888

RESIDENTIAL DEVELOPMENT

280 ISLAND HIGHWAY VICTORIA BC

drawing title: UNDERGROUND PARKING

project no.: 15-445 date: 25 OCT 2019 scale: AS NOTED checked by: LOWE drawn by: JW-AA sheet no.: A2.0