Council Meeting/Documents/Plan/Profile - Burnett Road Upgrade (Stantec)
Appendix

Plan/Profile - Burnett Road Upgrade (Stantec)

July 5, 2016Page 1909 sections

Engineering cross-sections and detailed plan for the Burnett Road sidewalk and roadway improvements.

2. APPROVAL OF AGENDA
Shows bike lanes and sidewalk transitions
Engineering drawing for Burnett Road Upgrade including plan and profile views, typical sections, and construction notes.
Engineering drawing for Burnett Road Upgrade including plan and profile views, typical sections, and construction notes.
Page 190

BURNETT ROAD TYPICAL SECTION (Detail 1)

  • 3.10 LANE (x2)
  • VARIES BOULEVARD
  • 1.50 BIKE LANE (2.0% slope)
  • 1.50 SIDEWALK (2.0% slope)
  • 80mm ASPHALT PAVEMENT LAP JOINT
  • BARRIER CURB AS PER MMCD C4
  • TOPSOIL AND SEED (BY OTHERS)
  • 100Ø PERF. PIPE WITH GEOTEXTILE SURROUND (TIGHT PIPE UNDER DRIVEWAY CROSSINGS)
  • 100mm CONCRETE SIDEWALK
  • 50mm ASPHALT PAVEMENT
  • 150mm GRANULAR BASE
Page 190

RETAINING WALL DETAILS (Detail 2)

  • BENCHED LOCK BLOCK
  • PERFORATED DRAIN
  • EXISTING GROUND
  • 300mm THICK CRUSHED GRANULAR LEVELLING PAD
  • STANDARD BLOCK
  • (HALF BLOCK SIMILAR TO STANDARD BLOCK EXCEPT WITH A HEIGHT OF 0.38m)
Page 190

BIKE RAMP DETAIL (Detail 3)

  • 1.0m CURB TRANSITION
  • PAVEMENT EDGE / LIP OF GUTTER
  • BARRIER CURB AS PER MMCD C4
  • SIDEWALK
  • BIKE LANE
Page 190

SIDEWALK TRANSITION DETAIL (Detail 4)

  • BOULEVARD
  • 1.5m BIKE LANE
  • 1.5m SIDEWALK
  • SIDEWALK ELEVATION TO MATCH BIKE LANE
  • TRANSITION SIDEWALK ELEVATION
  • 1.0m CURB TRANSITION
Page 190

CONSTRUCTION NOTES

  1. INSTALL CURB DROPS AT DRIVEWAY CROSSINGS AS PER MMCD C7. MATCH EXISTING DRIVEWAY WIDTH. PERFORATED PIPE IN BOULEVARD TO CHANGE TO SOLID PIPE UNDER DRIVEWAY CROSSINGS.
  2. ADJUST VALVE BOX TO NEW FINISHED GRADE.
  3. INSTALL BIKE RAMP, REFER TO DETAIL 4.
  4. FOR SIDEWALK TRANSITION, REFER TO DETAIL 5.
  5. SOLID 150Ø PVC PIPE TO CONNECT PERF. DRAIN TO EXISTING DITCH.
  6. EXTEND EXISTING SPEED HUMP TO NEW CURB.
  7. CONNECT TO NEW PERF. PIPE BELOW SWALE.
  8. SIDEWALK AND BIKE PATH ELEVATIONS TO MATCH AT DRIVEWAY CROSSINGS. TRANSITION OVER 1.0m ON BOTH SIDES.
  9. CONNECT PERF. DRAIN FROM WALL TO PERF. DRAIN IN SWALE.
Page 190

RETAINING WALL ELEVATION (Detail 5)

  • TOP OF WALL
    • Station 0+000.000: Elevation 20.251
    • 90° BEND Station 0+032.934: Elevation 18.167
    • 90° BEND Station 0+040.305: Elevation 17.510
  • BOTTOM OF WALL
    • Station 0+000.543: Elevation 18.802
    • Station 0+049.300: Elevation 15.627
  • Station markers: -0+005, 0+000, 0+020, 0+040, 0+050
Page 190

PLAN VIEW: BURNETT ROAD

  • Streets & Landmarks: ISLAND HIGHWAY, BURNETT ROAD, BISHAN PLACE, E & N RAILWAY.
  • Property Lots: LOT 326, LOT 336, LOT 240, LOT 236, LOT 34, LOT 340 VP57283, LOT 31, LOT 130.
  • Key Features & Callouts:
    • GRAVEL SHOULDER
    • EXISTING UTILITY POLE TO REMAIN, ADJUST GUY WIRE AS REQUIRED
    • EXISTING DITCH
    • CEDAR HEDGE
    • 1.5m BIKE LANE / 1.5m CONC. SIDEWALK
    • REGRADE DRIVEWAY, REINSTALL FENCE AND PROVIDE STEPS AT ACCESS POINT. STAIR DETAIL PENDING.
    • BLOCK RETAINING WALL, SEE DETAILS 2 AND 5.
    • INSTALL ASPHALT WATER CONTROL FROM END OF CONC. CURB TO EXISTING ASPHALT CURB.
    • INSTALL NON-MOUNTABLE CURB AS PER MMCD C4.
    • OVERHEAD HYDRO / TEL.
    • LIMIT OF CONSTRUCTION.
  • Legend:
    • NEW PAVEMENT (solid grey)
    • NEW CONCRETE SIDEWALK / DRIVEWAY (stippled)
Page 190

PROJECT INFORMATION

Field Content
Client/Project TOWN OF VIEW ROYAL / BURNETT ROAD UPGRADE
Title PLAN / PROFILE BURNETT ROAD
Consultant Stantec
Address 400 - 655 Tyee Road, Victoria BC
Date 15.12.02
Project No. [Not specified]
Drawing No. C02
Scale 1:250
Page 190
Extracted from: 2016 07 05 Council Agenda - Pdf