Public Hearing/Documents

Meeting Documents

October 17, 20231 PDF29 documents extracted

2023 10 17 Public Hearing Agenda - Agenda - Pdf

Agenda

TOWN OF VIEW ROYAL PUBLIC HEARING AGENDA TUESDAY, OCTOBER 17, 2023

Agenda for the public hearing of the Town of View Royal on October 17, 2023, regarding a covenant amendment for an intersection project.

Pages 1–23 key facts
Other

PUBLIC HEARING NOTICE OF ADVERTISING

A statement by the Development & Licensing Services Clerk certifying the methods and dates of advertisement for the public hearing.

Page 35 key facts
Staff Report

TOWN OF VIEW ROYAL PUBLIC HEARING REPORT: REQUEST TO AMEND COVENANT FOR ERSKINE LANE / WATKISS WAY ROUNDABOUT – FURTHER INFORMATION

A staff report detailing a proposal to construct a signalized intersection instead of a roundabout at Erskine Lane and Watkiss Way due to design constraints and property impacts.

Pages 4–85 key facts
Staff Report

TOWN OF VIEW ROYAL PLANNING, DEVELOPMENT AND ENGAGEMENT REPORT: REQUEST TO AMEND COVENANT FOR ERSKINE LANE / WATKISS WAY ROUNDABOUT

An earlier staff report introducing the proposal to replace the planned roundabout with a signalized intersection to avoid undesirable impacts such as tree removal and property encroachment.

Pages 9–164 key facts
Other

219 COVENANT – DEVELOPMENT AGREEMENT CA8718173

The legal covenant registered on title for 9 Erskine Lane securing community amenities and specific offsite works including a traffic circle.

Pages 17–405 key facts
Correspondence

Letter of Request: Amendment to Covenant CA8718173 – Development Agreement

A formal request from the developer to substitute the required roundabout with a signalized intersection based on traffic engineering findings and property constraints.

Page 413 key facts
Other

WATT MEMORANDUM: Watkiss Way and Erskine Lane Roundabout

A technical memorandum describing the design history and challenges of implementing a roundabout at the intersection, ultimately recommending a traffic signal.

Pages 42–584 key facts
Other

Geotechnical Assessment: Proposed Roundabout – Existing Retaining Wall Modifications

An assessment of existing dry stacked boulder retaining walls and the feasibility of modifications required for a roundabout.

Pages 59–604 key facts
Other

9 ERSKINE LANE Traffic Impact Assessment

A detailed study evaluating the traffic impacts of the proposed residential development on key area intersections.

Pages 61–1065 key facts
Other

APPENDIX A – SITE PLAN

Architectural and layout site plans for the development projects at 9 Erskine Lane.

Pages 107–1092 key facts
Other

APPENDIX B – SYNCHRO BACKGROUND

Technical background information regarding the Synchro modelling software and Level of Service (LOS) criteria.

Pages 110–1112 key facts
Other

APPENDIX C – SYNCHRO REPORTS

Detailed traffic modelling output reports for various development scenarios and horizons.

Pages 112–1623 key facts
Other

SIGNALIZED INTERSECTION LANE DESIGN - WATKISS WAY / ERSKINE LANE

Engineering design drawings for the proposed signalized intersection and roadway upgrades.

Pages 163–1653 key facts
Other

TIA Addendum No. 1 – Helmcken Rd. / Watkiss Way Intersection

An addendum to the traffic impact assessment specifically addressing the impact of intersection control selection on future traffic horizons.

Pages 166–1713 key facts
Other

Open House Summary: Intersection Improvement Options at Erskine Lane and Watkiss Way

A report summarizing public feedback from a community open house where residents reviewed roundabout and signalized intersection options.

Pages 172–1834 key facts
Presentation

Presentation: COVENANT AMENDMENT REQUEST – 9 ERSKINE LANE

Slide presentation summarizing the history, challenges, and staff recommendations regarding the roundabout versus signalized intersection proposal.

Pages 184–1973 key facts
Correspondence

Email from Carole Trudeau regarding traffic control proposal/Ernskine Lane

Resident correspondence supporting the traffic light intersection for safety and predictability.

Page 1982 key facts
Correspondence

Email from Don Denton regarding Blueprint housing project and traffic

Resident email chain regarding traffic concerns, parking, and the timing of intersection works.

Pages 199–2023 key facts
Correspondence

Email from Kathleen Gilbert regarding roundabout at Erskine

Resident expressing disappointment that the roundabout is being replaced with a traffic light, citing safety data for roundabouts.

Page 2032 key facts
Correspondence

Email from Glenda Balkan regarding West Urban Development on Erskine Lane

Resident opposing a signalized intersection and insisting on the previously promised roundabout.

Page 2042 key facts
Correspondence

Email from Michael Faulkner regarding Watkiss Way and Erskine Lane

Resident correspondence expressing concern about egress for strata units and safety for elementary school children.

Pages 205–2063 key facts
Correspondence

Email from Chris & Nancy Stewart regarding covenant amendment request

Residents supporting the signalized intersection to preserve mature trees on their property and address safety concerns for their daycare children.

Pages 207–2083 key facts
Correspondence

Email from Nicolas Denux regarding public hearing for 9 Erskine Lane

Correspondence from an area property owner supporting a traffic circle for better traffic calming in the school zone.

Page 2092 key facts
Correspondence

Email from The Shergolds regarding proposed traffic lights project

Correspondence from residents supporting signalized intersections for pedestrian and cyclist safety.

Page 2102 key facts
Correspondence

Email from Andrew Engelhardt regarding traffic signals at Watkiss and Stoneridge Dr

Correspondence supporting traffic signals but requesting the addition of advance left signals for exiting traffic.

Page 2112 key facts
Correspondence

Email from David Kury regarding recommendation to amend Covenant CA8718173

Resident feedback requesting in-ground loops and additional traffic calming measures be included in the signal design.

Page 2122 key facts
Correspondence

Email from Jessica Arnet regarding CRD Comments - 9 Erskine Road

Cover email transmitting comments from the Capital Regional District.

Page 2132 key facts
Form

CRD Staff Referral Response Form

Official referral response from CRD staff supporting the intersection control change and noting water infrastructure requirements.

Page 2143 key facts
Correspondence

Email from Doug Wilson regarding Watkiss Roundabout

Resident correspondence arguing that the council does not have enough financial and maintenance information to make a decision.

Page 2152 key facts