This site is in beta — data may be incomplete and features are still being added.
Special Council/Documents

Meeting Documents

June 13, 20171 PDF40 documents extracted

2017 06 13 Special Council Meeting Agenda - Agenda - Pdf

Appendix

Subject Property Map 2951 Craigowan Rd (Christie Pt)

A map produced by the Capital Regional District (CRD) showing the location and boundaries of the subject property.

Page 342 key facts
Appendix

Subject Property Ortho 2951 Craigowan Rd (Christie Pt)

An aerial orthophoto of the Christie Point peninsula property.

Page 352 key facts
Correspondence

realstar management Letter - December 13, 2016

The initial cover letter from Realstar Management submitting the rezoning application and outlining proposed community benefits.

Pages 36–374 key facts
Correspondence

realstar management Letter - Response to TOVR Initial Comments - March 27, 2017

A detailed technical response from the applicant addressing town concerns regarding engineering, drainage, transportation, and tenant relocation assistance.

Pages 38–504 key facts
Other

Realstar Management Response to Town of View Royal regarding Christie Point Redevelopment

A comprehensive response letter from the developer addressing environmental, archaeological, transportation, and community feedback concerns.

Pages 51–614 key facts
Appendix

CHRISTIE POINT BUILDING HEIGHT CLARIFICATION (Attachment 1)

Technical illustration and explanation regarding the requested building height increases for flood mitigation and tree retention.

Page 623 key facts
Appendix

FLOOD RISK AREAS (Attachment 2)

Map indicating estimated areas at or below 3.5m geodetic elevation requiring new higher flood construction levels.

Page 632 key facts
Appendix

TREE PLANTING & GROWTH PLAN (Attachment 3)

Site plan detailing the locations and species of new tree plantings and their projected canopy size after 20 years.

Page 644 key facts
Appendix

ESTIMATED TREE GROWTH (Attachment 4)

Visual simulations showing the approximate maturation of new tree plantings from four distinct viewpoints over 30 years.

Pages 65–682 key facts
Appendix

WATERFRONT VIEW ANALYSIS (Attachment 5)

Geometric analysis showing the apparent building height from various distances for neighbors with views toward Christie Point.

Page 692 key facts
Appendix

VICTORIA HARBOUR MIGRATORY BIRD SANCTUARY CASE STUDY (Attachment 6)

A case study of the Selkirk Waterfront Community used as precedent for responsible development within a migratory bird sanctuary.

Page 703 key facts
Appendix

Appendix B: Christie Point Redevelopment Plan Community and Stakeholder Engagement Summary (Attachment 7)

A comprehensive report summarizing community outreach, stakeholder meetings, and public feedback received regarding the redevelopment project.

Pages 71–965 key facts
Appendix

Christie Point Redevelopment Plan | Community and Stakeholder Engagement Summary

A narrative summary of engagement activities conducted following the submission of the rezoning application, including information on open houses.

Pages 97–1003 key facts
Correspondence

Appendix A: Letter to Chief Ron Sam, Songhees Nation

Correspondence from Realstar Management to the Songhees Nation regarding the redevelopment plan and preliminary planning principles.

Pages 101–1044 key facts
Correspondence

Appendix A: Letter to Chief Andrew Thomas, Esquimalt Nation

Correspondence from Realstar Management to the Esquimalt Nation outlining redevelopment goals and sharing planning principles.

Pages 105–1084 key facts
Appendix

Appendix B: Neighbourhood Open House Feedback Summary

Detailed compilation of feedback and comments received from tenants and community members during meetings and open houses held in September 2016.

Pages 109–1233 key facts
Appendix

Appendix C: Christie Point Resident Newsletter - September 2016

First project newsletter for residents explaining the rezoning process and initial redevelopment concepts.

Pages 124–1293 key facts
Appendix

Christie Point Newsletter - February 2017

Resident update detailing changes to the proposal based on feedback, including a reduction in height and unit count.

Pages 130–1323 key facts
Appendix

Christie Point FAQ - January 2017

Frequently asked questions document providing technical details on density, building height, and environmental mitigation.

Pages 133–1414 key facts
Appendix

Engagement Summary: What We’ve Heard / Responsive Action

A summary table correlating community concerns with specific actions taken by the developer to address them.

Page 1422 key facts
Appendix

What We’ve Heard / Responsive Action

A summary table of community concerns regarding environment, traffic, and building heights, along with the developer's responsive actions.

Pages 143–1443 key facts
Appendix

Attachment 8. Christie Point Demographic and Rent Analysis

Detailed analysis of current tenant demographics, income levels, and rental rates at Christie Point as of March 2017.

Pages 145–1484 key facts
Appendix

TREE RETENTION STATUS - CHRISTIE POINT REDEVELOPMENT PLAN

Technical drawing and chart detailing tree species, health, and whether they are slated for removal or retention.

Page 1493 key facts
Appendix

LANDSCAPE MASTERPLAN - CHRISTIE POINT

Illustrative masterplan showing proposed landscape features including trails, viewpoints, and restoration zones.

Page 1502 key facts
Appendix

BICYCLE FACILITIES IDEAS

Visual examples of proposed resident and visitor bicycle parking and maintenance facilities.

Page 1511 key fact
Correspondence

Correspondence from Realstar Management RE: Community Amenity Contribution

Letter outlining the developer's proposed $2.45 million Community Amenity Contribution package.

Pages 152–1565 key facts
Correspondence

Memo from CRD: Developer Contributions to Regional Housing Trust Fund

Memorandum providing information on the Regional Housing Trust Fund (RHTF) and how developer contributions are utilized.

Pages 157–1583 key facts
Staff Report

Christie Point TIA Review (Opus International Consultants)

Technical review of the Traffic Impact Assessment conducted by Bunt & Associates for the project site.

Pages 159–1693 key facts
Appendix

View Royal - Traffic Signal Warrant Analysis

Worksheets evaluating the technical necessity for a traffic signal at Island Highway and Shoreline Drive under different seasonal counts.

Pages 170–1712 key facts
Correspondence

MEMO: TIA Review Response (Bunt & Associates)

Response from the developer's traffic consultant addressing the technical comments raised by the Town's reviewer.

Pages 172–1773 key facts
Appendix

Exhibits 1-11: Traffic Performance Data

Series of technical maps showing Level of Service (LOS) and traffic volume/capacity ratios for various 2018 and 2028 scenarios.

Pages 178–1883 key facts
Appendix

Appendix A: Conceptual Road Designs

Technical drawings and aerial views showing proposed road designs and improvements for the Christie Point redevelopment.

Pages 189–1933 key facts
Appendix

Appendix B: SimTraffic Report – Total 2028 PM Peak Hour Queue Analysis

A traffic queuing and blocking report analyzing projected traffic flow and intersection capacity for the year 2028.

Pages 194–1953 key facts
Appendix

Appendix C: Conceptual Design Estimates

Detailed cost estimates for proposed road improvements at Shoreline Drive and Island Highway.

Pages 196–2003 key facts
Correspondence

Christie Point TIA Review

A letter from Opus International Consultants reviewing the traffic impact assessment comments from Bunt & Associates.

Pages 201–2023 key facts
Staff Report

Financial Analysis of Proposed Redevelopment of the Christie Point Site

A financial feasibility study by Coriolis Consulting Corp regarding community amenity contributions for the Christie Point project.

Pages 203–2185 key facts
Staff Report

TOWN OF VIEW ROYAL COMMITTEE OF THE WHOLE REPORT - REZONING – 2951 CRAIGOWAN ROAD (CHRISTIE POINT)

A background staff report detailing the site context, Official Community Plan alignment, and environmental considerations for the Christie Point rezoning application.

Pages 219–2345 key facts
Staff Report

Report to Committee of the Whole Re: Rezoning – 2951 Craigowan Rd (Christie Point)

A detailed technical report regarding the Christie Point redevelopment, covering transportation impacts, environment, and tenant compensation.

Pages 235–2485 key facts
Bylaw

TOWN OF VIEW ROYAL BYLAW NO. 976

A bylaw to create the CD-22 (Christie Point Residential) zone and rezone the property at 2951 Craigowan Road.

Pages 249–2514 key facts
Bylaw

TOWN OF VIEW ROYAL BYLAW NO. 976 (Bylaw for Reading)

A duplicate inclusion of Bylaw No. 976, provided separately for Council's formal first and second reading as per the agenda.

Pages 252–2543 key facts