This site is in beta — data may be incomplete and features are still being added.

Meeting Documents

February 11, 20251 PDF31 documents extracted

2025 02 11 Committee of the Whole Agenda - Agenda - Pdf

Agenda

TOWN OF VIEW ROYAL COMMITTEE OF THE WHOLE MEETING AGENDA

The agenda for the Committee of the Whole meeting on February 11, 2025, listing reports on development permits, park designs, and the CAO update.

Pages 1–44 key facts
Minutes

MINUTES OF A COMMITTEE OF THE WHOLE MEETING HELD ON TUESDAY, JANUARY 14, 2025

Minutes from the previous Committee of the Whole meeting covering reports on public safety, rezoning applications, and portfolio updates from council members.

Pages 5–94 key facts
Staff Report

STAFF REPORT: DEVELOPMENT VARIANCE PERMIT 2023-10 - 1 HOSPITAL WAY

A proposal for a new Electrical Energy Centre at Victoria General Hospital requiring multiple variances for setbacks, height, and parking.

Pages 10–174 key facts
Correspondence

Attachment 1: Victoria General Hospital – Electrical Energy Centre Development Variance Application Letter

A letter from Stantec Architecture Ltd. detailing the technical requirements and rationale for the proposed Electrical Energy Centre at VGH.

Pages 18–243 key facts
Appendix

Attachment 2: VICTORIA GENERAL HOSPITAL ELECTRICAL ENERGY CENTRE Architectural and Civil Plans

Detailed architectural and civil drawings for the proposed energy centre at 1 Hospital Way.

Pages 25–403 key facts
Appendix

Attachment 3: ALR Land Use Decision - ALC File 69721

The Provincial Agricultural Land Commission decision allowing an access route on ALR land for the hospital's electrical energy centre.

Pages 41–503 key facts
Appendix

Attachment 4: SITE WORK REPORT - GYE + ASSOCIATES

Arborist site work report regarding subterranean surface mapping and bedrock testing at VGH.

Pages 51–533 key facts
Appendix

Attachment 5: Proposed Energy Centre 1 Hospital Way Site Description / Plan

A site description plan identifying different ecological strata and forest conditions in the project area.

Page 543 key facts
Appendix

Attachment 6: Arborist Report and Tree Management Plan - Gye + Associates

A comprehensive tree inventory and impact assessment for the View Royal portion of the VGH energy centre project.

Pages 55–684 key facts
Presentation

PRESENTATION: DEVELOPMENT VARIANCE PERMIT 2023-10 - 1 Hospital Way

Presentation slides summarizing the purpose, variances, and staff recommendations for the VGH energy centre.

Pages 69–772 key facts
Staff Report

STAFF REPORT: DEVELOPMENT VARIANCE PERMIT 2024-04 – 406 CREED ROAD

A retroactive permit application for a deck constructed at 406 Creed Road that encroaches on the required rear yard setback.

Pages 78–823 key facts
Correspondence

Attachment 1: Applicant’s Letter to Mayor and Council - 406 Creed Road

An apology and request from the property owner for a variance to allow an unpermitted deck construction.

Page 832 key facts
Appendix

Attachment 2: BC LAND SURVEYORS SITE PLAN OF: Civic: 406 Creed Road

Survey and architectural plans for the proposed deck at 406 Creed Road.

Pages 84–852 key facts
Presentation

PRESENTATION: DEVELOPMENT VARIANCE PERMIT 2024-04 - 406 Creed Rd

Presentation slides regarding the variance request for the deck at 406 Creed Road.

Pages 86–902 key facts
Staff Report

STAFF REPORT: HOME OCCUPATION – SCOPE OF BYLAW REVIEW

A proposal to review and update the Town's home occupation regulations to align with the Strategic Plan.

Pages 91–943 key facts
Appendix

Attachment 1: Zoning Bylaw Section 4.2 – Home Occupation Regulations

Current zoning text defining and regulating different levels of home occupations in View Royal.

Pages 95–982 key facts
Presentation

PRESENTATION: Home Occupation – Scope of Bylaw Review

Presentation summarizing the proposed scope for reviewing home occupation regulations.

Pages 99–1022 key facts
Staff Report

STAFF REPORT: OFFICIAL COMMUNITY PLAN: MIXED-USE AND MIXED EMPLOYMENT FEASIBILITY ANALYSIS PROJECT SCOPE

Information on the project scope for analyzing the feasibility of mixed-use development along the Island Highway corridor.

Pages 103–1063 key facts
Appendix

Attachment 1: View Royal Land Economics Study (2021)

A 2021 study by Coriolis Consulting Corp. evaluating the market demand and financial viability for various types of development in View Royal.

Pages 107–1653 key facts
Staff Report

STAFF REPORT: REQUEST FOR PRIDE COLOURED CROSSWALK

A report evaluating the feasibility, cost, and location options for a Pride-coloured crosswalk or alternative installation.

Pages 166–1713 key facts
Correspondence

Correspondence: Email from View Royal Elementary PAC regarding Pride Crosswalk

An email from the Parent Advisory Council supporting the installation of a pride crosswalk near the school.

Page 1722 key facts
Staff Report

STAFF REPORT: WATKISS PARK DESIGN FINALIZATION

Summary of community engagement and final landscape design presentation for the new Watkiss Park.

Pages 173–1784 key facts
Appendix

Attachment 1: Watkiss Way Community Park Concept Design

Graphic landscape design plan and site furnishing concepts for Phase 1 of Watkiss Park.

Pages 179–1802 key facts
Appendix

Attachment 2: WHAT WE HEARD SUMMARY REPORT - Watkiss Way Park

A summary of feedback gathered from an onsite open house and online survey regarding the park design.

Pages 181–1994 key facts
Appendix

Attachment 3: Project Summary C-122 – Watkiss Way Community Park Development

Financial plan summary for the park development, including historical budget use and carry-forward amounts.

Pages 200–2012 key facts
Staff Report

STAFF REPORT: HELMCKEN ROAD AT WATKISS WAY INTERSECTION PROTECTION MEASURES

A recommendation to install a 'quick build traffic calming curb' (Calgary Curb) to improve safety for northbound cyclists.

Pages 202–2064 key facts
Appendix

Attachment 1: Helmcken Road Intersection Design Drawing

Engineering drawings showing planned intersection improvements and the location of the traffic calming curb.

Pages 207–2092 key facts
Staff Report

STAFF REPORT: VIEW ROYAL FIRESMART PROGRAM – ACTIVITIES COMPLETED

Report introducing a summary of achievements by the Town's FireSmart Coordinator.

Page 2102 key facts
Appendix

Attachment A: View Royal FireSmart Program - Summary of Activities

A detailed list of completed activities including education sessions, community planning, and residential home assessments.

Pages 211–2143 key facts
Staff Report

STAFF REPORT: CAO UPDATE

Updates on major Town initiatives including RCMP detachment expansion, 911 cost coordination, and public engagement platforms.

Pages 215–2214 key facts
Staff Report

STAFF REPORT: 2025 BUILDING REPORT - JANUARY

Statistical report of building and plumbing permits issued during January 2025.

Page 2223 key facts