This site is in beta — data may be incomplete and features are still being added.
Public Hearing/Documents

Meeting Documents

June 27, 20171 PDF70 documents extracted

2017 06 27 Public Hearing Agenda - Agenda - Pdf

Appendix

Subject Property Map 2951 Craigowan Rd (Christie Pt)

A cadastral map identifying the boundaries of the subject property at 2951 Craigowan Road.

Page 142 key facts
Appendix

Subject Property Ortho 2951 Craigowan Rd (Christie Pt)

An aerial orthophoto showing the current site context and surrounding shoreline of the subject property.

Page 152 key facts
Appendix

Subject Property Ortho 2951 Craigowan Rd (Christie Pt) - Duplicate

A duplicate copy of the orthophoto for the subject property.

Page 161 key fact
Appendix

Summary of Tenant Relocation Support Package

A summary letter from Realstar Management outlining the assistance and compensation package for current residents being displaced by the redevelopment.

Page 175 key facts
Bylaw

TOWN OF VIEW ROYAL BYLAW NO. 976

A draft bylaw to amend the Town of View Royal Zoning Bylaw to create the CD-22 (Christie Point Residential) zone and rezone the subject property.

Pages 18–204 key facts
Staff Report

TOWN OF VIEW ROYAL COUNCIL REPORT: REZONING – 2951 CRAIGOWAN ROAD (CHRISTIE POINT) - JUNE 9 REPORT

The previous staff report from June 9, 2017, providing detailed context on the rezoning application, OCP policies, and technical analysis.

Pages 21–505 key facts
Appendix

Subject Property Map 2951 Craigowan Rd (Christie Pt) - Attachment

Map attachment associated with the June 9, 2017 staff report.

Page 511 key fact
Appendix

Subject Property Ortho 2951 Craigowan Rd (Christie Pt) - Attachment

Orthophoto attachment associated with the June 9, 2017 staff report.

Page 521 key fact
Correspondence

Realstar Management Cover Letter – December 13, 2016

The original application cover letter from Realstar Management outlining the project goals and community benefits.

Pages 53–544 key facts
Correspondence

Realstar Management Response to TOVR Initial Department Comments

Applicant responses to technical comments provided by the Town's Engineering and Development Services departments.

Pages 55–633 key facts
Appendix

Realstar Management Response to Town of View Royal Comments

Detailed response from the developer addressing municipal comments on site use, environmental protection, housing, and mobility for the Christie Point project.

Pages 64–785 key facts
Appendix

Attachment 1: Christie Point Building Height Clarification

Architectural diagrams and text clarifying building height calculations and flood mitigation requirements for the redevelopment.

Page 792 key facts
Appendix

Attachment 2: Flood Risk Areas

Site map illustrating areas lying at or below 3.5m geodetic elevation that require higher flood construction levels.

Page 802 key facts
Appendix

Attachment 3: Tree Planting & Growth Plan

Landscape plan showing the locations and species of new trees to be planted across the peninsula.

Page 812 key facts
Appendix

Attachment 4: Estimated Tree Growth Visualizations

Visual simulations showing how the proposed tree plantings will mature over 30 years from various local viewpoints.

Pages 82–852 key facts
Appendix

Attachment 5: Waterfront View Analysis

Analysis of the number of waterfront neighbors with views toward Christie Point and diagrams showing apparent building height vs. distance.

Page 862 key facts
Appendix

Attachment 6: Victoria Harbour Migratory Bird Sanctuary Case Study

Information on the Migratory Bird Sanctuary and a case study of the Selkirk Waterfront Community as a precedent for responsible development.

Page 872 key facts
Appendix

Appendix B: Christie Point Redevelopment Plan Community and Stakeholder Engagement Summary

A comprehensive report detailing the engagement process with tenants, neighbors, First Nations, and community organizations from May 2016 to March 2017.

Pages 88–1144 key facts
Appendix

Appendix A: Letters to First Nations - Title and Spacer Pages

Title and divider pages for Appendix A, which contains correspondence with the Esquimalt and Songhees Nations.

Pages 115–117
Correspondence

Letter to Chief Ron Sam regarding Christie Point Redevelopment

A letter from Realstar Management to Chief Ron Sam of the Songhees Nation summarizing a previous meeting and outlining development principles.

Pages 118–1193 key facts
Presentation

Christie Point Redevelopment - Planning Principles

Visual presentation outlining eight core planning principles for the redevelopment, including respecting the environment and multi-modal transportation.

Pages 120–1212 key facts
Correspondence

Letter to Chief Andrew Thomas regarding Christie Point Redevelopment

A letter from Realstar Management to Chief Andrew Thomas of the Esquimalt Nation regarding the project's approach and planning principles.

Page 1222 key facts
Correspondence

Letter from Realstar Management regarding redevelopment process

Closing letter from Heather Grey-Wolf of Realstar Management discussing collaboration and the engagement of Terra Archaeology.

Page 1233 key facts
Presentation

Christie Point Redevelopment - Planning Principles

Visual presentation slides outlining eight core planning principles for the site's redevelopment, such as environmental respect and rental housing expansion.

Pages 124–1253 key facts
Appendix

Appendix B Neighbourhood Open House Feedback - Title Page

Introductory pages for the community and stakeholder engagement feedback section from the September 2016 open house.

Pages 126–1272 key facts
Appendix

Christie Point Redevelopment Summary of Comments Received TENANTS MEETING

Summary of feedback from a meeting with Christie Point residents held on September 20, 2016.

Pages 128–1293 key facts
Appendix

Christie Point Redevelopment Summary of Comments Received NEIGHBOURHOOD OPEN HOUSE

Detailed compilation of community feedback received after the September 22 neighborhood open house.

Pages 130–1344 key facts
Appendix

Summary of Comments Received COMMENT FORMS SUBMITTED ELECTRONICALLY

Summary of feedback received through electronic submissions between September and November 2016, including a resident's formal letter of opposition.

Pages 135–1384 key facts
Appendix

Comments Posted on Comment Board using Notes at the Open House

Transcription of feedback provided on sticky notes during the neighborhood open house.

Pages 139–1404 key facts
Appendix

Appendix C Resident Newsletters and FAQ - Title Page

Title page for the section containing developer newsletters and frequently asked questions documents.

Pages 141–1422 key facts
Correspondence

Christie Point Newsletter - September 2016

Informational newsletter from Realstar detailing the rezoning process and scheduling upcoming public engagement meetings.

Pages 143–1463 key facts
Correspondence

Christie Point Newsletter - February 2017

Newsletter update detailing proposal changes, specifically reducing maximum height from 9 storeys to 6 storeys.

Pages 147–1493 key facts
Appendix

Christie Point FAQ - January 2017

Comprehensive frequently asked questions document addressing development rationale, density, building height, and environmental impacts.

Pages 150–1584 key facts
Appendix

What We’ve Heard / Responsive Action

Table summarizing specific community concerns and the corresponding actions or design changes taken by the developer.

Pages 159–1613 key facts
Appendix

Attachment 8. Christie Point Demographic and Rent Analysis

Data analysis of existing rent levels and tenant demographics at Christie Point compared to regional averages.

Pages 162–1654 key facts
Appendix

TREE RETENTION STATUS SITE PLAN

Map and table identifying trees for retention or removal and outlining new planting commitments.

Page 1663 key facts
Appendix

CHRISTIE POINT LANDSCAPE MASTERPLAN

Detailed site landscape plan highlighting restoration areas, native plantings, and community amenities like yoga space and gardens.

Page 1673 key facts
Presentation

BICYCLE FACILITIES IDEAS

Visual guide demonstrating types of resident and visitor bicycle parking facilities proposed for the development.

Page 1683 key facts
Correspondence

Letter RE: Christie Point Rezoning Application 2016-05 Community Amenity Contribution

Letter from Realstar Management formalizing a $2.45 million community amenity contribution offer.

Pages 169–1735 key facts
Correspondence

CRD Memo: Developer Contributions to Regional Housing Trust Fund

Memorandum from the Capital Regional District explaining the Regional Housing Trust Fund (RHTF) and how developer contributions are utilized.

Pages 174–1753 key facts
Staff Report

Christie Point TIA Review (Opus International)

Engineering review of the applicant's Traffic Impact Assessment, providing professional analysis and recommendations for signalization and lane configurations.

Pages 176–1814 key facts
Appendix

Opus International Memo - Christie Point Traffic Review

Technical memorandum reviewing transportation impacts, parking requirements, and road signalization for the development.

Pages 182–1863 key facts
Appendix

View Royal - Traffic Signal Warrant Analysis

Traffic signal warrant analysis based on June and November counts, including development volumes.

Pages 187–1883 key facts
Correspondence

MEMO: Christie Point TIA Review Response

Response from Bunt & Associates to issues raised by Town staff and Opus regarding the Transportation Impact Assessment.

Pages 189–1944 key facts
Appendix

Exhibits 1-11: Traffic Performance Data and Volumes

Visual exhibits depicting traffic performance, volumes, and mitigation scenarios for the Christie Point development.

Pages 195–2053 key facts
Appendix

Appendix A: Conceptual Road Designs

Architectural drawings and schematic plans for proposed road and trail improvements near Christie Point.

Pages 206–2103 key facts
Appendix

Appendix B: SimTraffic Report – Total 2028 PM Peak Hour Queue Analysis

Detailed queuing and blocking report for the Island Highway intersections under 2028 projected loads.

Pages 211–2122 key facts
Appendix

Appendix C: Conceptual Design Estimates

Itemized cost estimates for proposed off-site road, sidewalk, and infrastructure improvements.

Pages 213–2173 key facts
Correspondence

Opus International Letter - Christie Point TIA Review

Review letter providing final comments on the Bunt & Associates traffic analysis and proposed mitigation measures.

Pages 218–2193 key facts
Staff Report

Financial Analysis of Proposed Redevelopment of the Christie Point Site

Economic analysis by Coriolis Consulting regarding the feasibility of community amenity contributions from the redevelopment.

Pages 220–2294 key facts
Appendix

Coriolis Attachment 1 – Rental Rates Survey

Survey of current market rental rates for new purpose-built rental developments in the Greater Victoria area.

Page 2302 key facts
Appendix

Coriolis Attachment 2 - Existing Value Key Assumptions

Assumptions used for calculating the existing income-producing value of the Christie Point property.

Pages 231–2323 key facts
Appendix

Coriolis Attachment 3 - Redevelopment Scenarios

Detailed financial modeling for redevelopment scenarios, including revenue, cost, and residual land value calculations.

Pages 233–2353 key facts
Staff Report

TOWN OF VIEW ROYAL COMMITTEE OF THE WHOLE REPORT: REZONING – 2951 CRAIGOWAN ROAD (CHRISTIE POINT)

Initial report to the Committee of the Whole describing the site context, Official Community Plan alignment, and rezoning process.

Pages 236–2404 key facts
Staff Report

Report to Committee of the Whole Re: Rezoning – 2951 Craigowan Rd (Christie Point)

Comprehensive analysis of the Christie Point redevelopment proposal covering density, environmental impacts, transportation, and community amenity contributions.

Pages 477–5016 key facts
Bylaw

TOWN OF VIEW ROYAL BYLAW NO. 976 (Version 1)

A bylaw to create the CD-22 (Christie Point Residential) zone and rezone 2951 Craigowan Road.

Pages 502–5044 key facts
Bylaw

TOWN OF VIEW ROYAL BYLAW NO. 976 (Version 2 with Reading Dates)

A copy of the rezoning bylaw noting the dates of the first and second readings.

Pages 505–5071 key fact
Correspondence

Email from PISCES Re: development of Christie Point Apartments

Correspondence from the PISCES Society regarding environmental impacts on the bird sanctuary, light pollution, and building height.

Pages 508–5093 key facts
Correspondence

Email from Ron Diederichs (FLNR) Re: Christie Point Development

Technical feedback from the Ministry of Forests, Lands and Natural Resources regarding environmental guidelines and the Mixed Residential OCP designation.

Pages 510–5113 key facts
Correspondence

Email from Shahn Torontow Re: Christie Point Development

Correspondence from a citizen expressing concerns over project density, environmental setbacks, and traffic on Shoreline Drive.

Pages 512–5143 key facts
Correspondence

Letter from Judith Newnham Re: Christie Point Redevelopment

Letter from a resident responding to claims about tenant attitudes and discussing pet policies and wildlife.

Page 5153 key facts
Correspondence

Email from Doug & Lindsay Critchley Re: biofilters.pdf

Resident correspondence regarding water quality, buffer widths, and stormwater management at Christie Point.

Page 5162 key facts
Appendix

BIOFILTERS (Bioswales, Vegetative Buffers, & Constructed Wetlands) For Storm Water Discharge Pollution Removal

Technical guidance document from the Oregon Department of Environmental Quality regarding best management practices for stormwater biofilters.

Pages 517–5353 key facts
Bylaw

Zoning Bylaw No. 900, 2014, Amendment Bylaw No. 976, 2017

A proposed bylaw to amend the Town's zoning bylaw to create the CD-22 (Christie Point Residential) Zone and rezone the property at 2951 Craigowan Road.

Pages 564–5663 key facts
Correspondence

Email dated June 22, 2017 from G. Blogg, President, Portage Inlet Sanctuary Colquitz Estuary (PISCES) Society

Correspondence regarding Zoning Bylaw No. 976 from the PISCES Society.

Pages 567–5682 key facts
Correspondence

Email dated June 21, 2017 from R. Deiderichs, Section Head, Ecosystems Section, Ministry of Forest, Lands and Natural Resources Operations

Correspondence regarding the Christie Point Redevelopment from provincial ministry staff.

Pages 569–5702 key facts
Correspondence

Email dated June 21, 2017 from S. Torontow, Re: Christie Point Redevelopment

Public correspondence concerning the proposed Christie Point redevelopment.

Pages 571–5732 key facts
Correspondence

Letter dated June 21, 2017 from J. Newnham, 2931 Craigowan Road, Re: Christie Point Redevelopment

A letter from a local resident regarding the Christie Point redevelopment proposal.

Page 5743 key facts
Correspondence

Email dated June 21, 2017 from D. Critchley, Re: Christie Point Redevelopment

Correspondence including a detailed technical report on the design and effectiveness of bioswales and constructed wetlands for stormwater management.

Pages 575–6314 key facts
Correspondence

Email dated June 21, 2017 from Linda Baker, Re: Christie Point Redevelopment

Correspondence from a resident expressing support for the redevelopment and the proposed 6-storey building height.

Pages 632–6334 key facts