This site is in beta — data may be incomplete and features are still being added.

Meeting Documents

June 12, 20181 PDF23 documents extracted

2018 06 12 Committee of the Whole Agenda - Agenda - Pdf

Agenda

AGENDA TOWN OF VIEW ROYAL COMMITTEE OF THE WHOLE MEETING TUESDAY, JUNE 12, 2018

The formal agenda for the Committee of the Whole meeting including business items for protective services, finance, parks, and planning.

Pages 1–43 key facts
Minutes

MINUTES OF A COMMITTEE OF THE WHOLE MEETING HELD ON TUESDAY, MAY 8, 2018

Official minutes from the previous committee meeting, detailing discussions on transit improvements, public safety reports, and various rezoning applications.

Pages 5–173 key facts
Staff Report

West Shore RCMP 2017 Annual Year End Report

An annual comprehensive report from the RCMP detailing crime statistics, traffic safety, and strategic policing priorities for the West Shore region.

Pages 18–435 key facts
Staff Report

Capital Projects Update

A staff report tracking the progress and budget of various 2018 capital projects including transportation, sewer, and park improvements.

Pages 44–453 key facts
Staff Report

CAO UPDATE

A report from the Chief Administrative Officer providing highlights on administrative activities, finance, and development services.

Pages 46–515 key facts
Staff Report

Development Variance Permit 2018/02 – 275 Plowright Road

A planning report regarding a request to vary rear yard setbacks, fence height, and accessory building siting on a residential lot.

Pages 52–554 key facts
Appendix

Attachment 1. Subject Property Map

A cadastral map showing the subject property at 275 Plowright Road and surrounding parcels.

Page 561 key fact
Appendix

Attachment 2 Letter from Applicant, April 23, 2018

A letter from property owners Erik and Tanya Thompson explaining the rationale for the requested variances for a potting shed and deck extension.

Pages 57–582 key facts
Appendix

Attachment 3 Site Plan – Michael E. Claxton Land Surveyor

A detailed site plan marking the locations of requested variances for the deck, fence, and accessory building.

Page 592 key facts
Appendix

Attachment 4 Deck Plan

A technical drawing showing the plan view of the proposed deck extension at 275 Plowright Road.

Page 601 key fact
Appendix

Attachment 5 Deck Elevation

A technical elevation drawing of the proposed deck structure.

Page 612 key facts
Appendix

Attachment 6 Accessory Building elevation

A technical drawing showing the elevation of the proposed 8' tall potting shed.

Page 622 key facts
Appendix

Attachment 7 Site photos

Photographs of the existing rear yard and the proposed location for the potting shed.

Page 631 key fact
Staff Report

242-244 ISLAND HWY ZONING BYLAW NO. 900, 2014 AMENDMENT BYLAW NO. 1002 COMMUNITY AMENITY CONTRIBUTION OPTIONS

A report regarding Community Amenity Contribution (CAC) options for a proposed rezoning from R-1B to RM-3.

Pages 64–663 key facts
Staff Report

Use of Carbon Offsets for Green Building Incentives

A report evaluating the feasibility of using carbon offset funds to finance a green building incentive program.

Pages 67–693 key facts
Appendix

Appendix 2. Calculating Emission Reductions for Building Retrofits/Fuel Switching (Option 1A)

An extract from the 'Becoming Carbon Neutral' guidebook detailing methodologies for calculating emissions reductions from building retrofits.

Pages 70–742 key facts
Staff Report

COMMUNITY AMENITY CONTRIBUTION POLICY

A report introducing considerations for the development of a formal Community Amenity Contribution (CAC) policy to rationalize negotiations with developers.

Pages 75–803 key facts
Appendix

District of Central Saanich Community Amenity Contributions Policy

The formal Council Policy for CACs from the neighboring District of Central Saanich, provided as a reference model.

Pages 81–834 key facts
Appendix

The Short Guide - Community Amenity Contributions: Balancing Community Planning, Public Benefits and Housing Affordability

A provincial guide produced by the Ministry of Community, Sport and Cultural Development regarding best practices for CACs.

Pages 84–902 key facts
Staff Report

Hallowell Road Construction Update

An update on the E&N Rail Trail project construction on Hallowell Road, including parking changes and sound attenuation measures.

Pages 91–924 key facts
Appendix

Sketch #1 - Hallowell Road Rail Trail Upgrade

A detailed engineering drawing of the E&N Rail Trail construction and road realignments along Hallowell Road.

Page 931 key fact
Appendix

Sketch #2 - Hallowell Road Parking and Barrier Details

A zoomed engineering detail showing parking stall relocations and signage near Outlook Place on Hallowell Road.

Page 941 key fact
Appendix

Sketch #3 - Hallowell Road Rail Crossing and Trail Connection

An engineering plan showing trail connections, utility relocations, and fencing at the rail crossing near Admirals Road.

Page 951 key fact