This site is in beta — data may be incomplete and features are still being added.

Meeting Documents

June 14, 20221 PDF35 documents extracted

2022 06 14 Committee of the Whole Agenda - Agenda - Pdf

Minutes

TOWN OF VIEW ROYAL MINUTES OF A COMMITTEE OF THE WHOLE MEETING HELD ON TUESDAY, MAY 10, 2022

Official minutes of the previous Committee of the Whole meeting including records of votes, discussions on public safety, and development permits.

Pages 6–124 key facts
Other

2022 Building Report - May

A one-page summary of building permit activity in the Town of View Royal for the month of May 2022.

Page 135 key facts
Staff Report

BUDGET VARIANCE AND PROJECTS UPDATE REPORT TO MAY 31, 2022

Financial report from the Manager of Accounting providing an update on budget variances and progress on capital and non-core projects.

Pages 14–165 key facts
Appendix

Schedule A – 2022 Consolidated Budget Variance

Detailed financial table showing 2022 YTD revenues and expenses versus total budget by category.

Page 174 key facts
Appendix

Schedule B – 2022 Non-core Projects

Table tracking the budget and actual spending for designated non-core projects for the current fiscal year.

Page 184 key facts
Appendix

Schedule C – 2022 Capital Projects

Financial tracking table for capital projects including infrastructure, vehicle replacements, and park improvements.

Page 194 key facts
Staff Report

CAO UPDATE

Monthly administrative update from the Chief Administrative Officer covering administrative, finance, and engineering department activities.

Pages 20–255 key facts
Other

Crane Place Access Signs Photograph

A site photograph showing 'Private Property' and 'Beware of Dog' signs on a driveway, used for context during new business discussions.

Page 263 key facts
Staff Report

Energy Step Code Bylaw Staff Report

A report outlining recommendations for implementing the BC Energy Step Code in View Royal using a phased approach.

Pages 27–324 key facts
Appendix

Attachment 1 - Developers and Step Code Survey Results

Comprehensive results from a survey of 11 local developers regarding their preparedness and concerns for Energy Step Code implementation.

Pages 33–383 key facts
Presentation

Energy Step Code Presentation

A series of slides summarizing the regional update and proposed 2-phase approach for Energy Step Code adoption in View Royal.

Pages 39–473 key facts
Staff Report

Development Permit Application 2021/02 – 167, 169, and 171 Island Highway

Staff report evaluating a development permit application for a five-storey, 82-unit condominium building.

Pages 48–585 key facts
Appendix

Attachment 1 - Subject Property Map

Cadastral map highlighting the three lots comprising the development site at 167, 169, and 171 Island Hwy.

Page 592 key facts
Appendix

Attachment 2 - Subject Property Orthophoto

Aerial photograph with the development site boundary outlined in red.

Page 602 key facts
Correspondence

Attachment 3 - Justification Letter

A letter from Urban West Architecture Inc. providing project overview, community benefits, and sustainability goals.

Pages 61–644 key facts
Appendix

Attachment 4 - Architectural Drawings and Renderings

A comprehensive set of architectural plans, elevations, sections, and 3D renderings for the Portage Park Residences project.

Pages 65–865 key facts
Appendix

Attachment 5 - Conceptual Servicing Plan

Civil engineering drawing detailing proposed utility connections and road improvements for the development.

Page 874 key facts
Appendix

Attachment 6 - Landscape Concept Plan

Detailed landscape design plan including tree retention/removal, softscape legends, and amenity features.

Page 884 key facts
Appendix

Attachment 7 - Construction Impact Assessment & Tree Management Plan

A detailed arborist report assessing the impact of construction on existing trees and providing management recommendations.

Pages 89–1005 key facts
Appendix

Construction Impact Assessment and Tree Management Plan for 167, 169 & 171 Island Hwy

A technical arborist report prepared for GTMann Contracting Ltd detailing strategies for the retention and removal of trees impacted by construction.

Pages 197–2054 key facts
Form

Attachment 8 Project Sustainability Checklist

A completed municipal checklist evaluating the economic, environmental, and social sustainability components of the proposed multi-family development.

Pages 206–2133 key facts
Appendix

Attachment 9 Form and Character of Development (Mixed Residential Guidelines)

An excerpt from the Official Community Plan outlining the objectives and design guidelines for developments within the Mixed Residential Permit Area.

Pages 214–2183 key facts
Appendix

Attachment 10 A011 SITE PLAN

A detailed architectural site plan for the proposed Portage Park Residences project.

Page 2194 key facts
Appendix

Attachment 11 L100 LANDSCAPE CONCEPT PLAN

A landscape design plan detailing the proposed softscape and hardscape elements for the development.

Page 2203 key facts
Presentation

DEVELOPMENT PERMIT 2022/02 167 – 171 Island Highway Presentation

A staff presentation outlining the proposed 82-unit condo building, including unit mix, architectural renderings, and requested variances.

Pages 221–2414 key facts
Staff Report

Planning & Development Report - Draft Official Community Plan

A staff report from the Director of Development Services re-introducing the draft OCP and seeking feedback before seeking public input.

Pages 242–2433 key facts
Other

Town of View Royal OFFICIAL COMMUNITY PLAN DRAFT JUNE 2022

The draft version of the Town's long-range policy plan, outlining goals and policies for growth, housing, and environment through 2036.

Pages 244–2924 key facts
Other

TOWN OF VIEW ROYAL – OFFICIAL COMMUNITY PLAN

The draft text of the Official Community Plan (OCP) containing sections on community well-being, heritage conservation, cultural resources, and detailed development permit area guidelines for residential and commercial zones.

Pages 293–3796 key facts
Staff Report

COMMITTEE OF THE WHOLE REPORT - REGIONAL PUBLIC ELECTRIC VEHICLE CHARGING NETWORK PROJECT GRANT APPLICATION

A staff report recommending the Town's participation in a CRD-led grant application to fund the installation of four level 2 public EV charging stations on municipal land.

Pages 380–3825 key facts
Appendix

Attachment 1. Preliminary Charging Station Locations

A table specifying the two proposed addresses for the installation of the electric vehicle chargers.

Page 3833 key facts
Staff Report

REPORT TO ENVIRONMENTAL SERVICES COMMITTEE - Clean BC Communities Fund Grant Application – Clean Energy Transportation – Public Electric Vehicle Infrastructure Project

An external report from the Capital Regional District (CRD) providing background on the regional EV infrastructure roadmap and the CleanBC Communities Fund grant intake.

Pages 384–3875 key facts
Presentation

REGIONAL PUBLIC ELECTRIC VEHICLE CHARGING NETWORK PROJECT GRANT APPLICATION (Presentation Slide)

A summary slide for the committee presentation regarding the commitment of Town land for the EV charging station project.

Page 3883 key facts
Presentation

REGIONAL PUBLIC ELECTRIC VEHICLE CHARGING NETWORK PROJECT GRANT APPLICATION

A presentation outlining the CRD-led regional public electric vehicle charging network project grant application to the ICIP CleanBC Communities Fund.

Pages 389–3934 key facts
Staff Report

View Royal EV Charging Stations Update

A staff report detailing the usage and financial performance of the Town's two EV charging stations since user fees were introduced in March 2022.

Pages 394–3975 key facts
Presentation

VIEW ROYAL EV CHARGING STATIONS UPDATE

A slide deck presentation summarizing the usage details, revenue, and conclusions of the EV charging station update report.

Pages 398–4054 key facts