This site is in beta — data may be incomplete and features are still being added.

Meeting Documents

July 12, 20221 PDF61 documents extracted

2022 07 12 Committee of the Whole agenda - Agenda - Pdf

Minutes

TOWN OF VIEW ROYAL MINUTES OF A COMMITTEE OF THE WHOLE MEETING HELD ON TUESDAY, JUNE 14, 2022

Minutes of the previous meeting detailing discussions and motions regarding building reports, the draft Official Community Plan, and EV charging station grant applications.

Pages 7–135 key facts
Staff Report

Transforming Policing and Community Safety in British Columbia

A comprehensive report by the Special Committee on Reforming the Police Act recommending transformational shifts in BC policing, including a transition to a provincial police service and enhanced mental health responses.

Pages 14–686 key facts
Staff Report

Transforming Policing and Community Safety in British Columbia (Excerpts)

Excerpts from a report by the Special Committee on Reforming the Police Act, discussing justice system reform, systemic racism, police funding models, and oversight mechanisms.

Pages 69–984 key facts
Appendix

Appendix A: Participants

A list of individuals and organizations who participated in the Special Committee’s consultation on reforming the Police Act.

Pages 99–1021 key fact
Appendix

Appendix B: Survey

The survey questions and documentation used by the Special Committee to gather public input on policing experiences and reform opportunities.

Pages 103–1071 key fact
Appendix

Appendix C: The Work of the Previous Committee

A summary of the activities undertaken by the previous Special Committee on Reforming the Police Act during the 41st Parliament.

Pages 108–1091 key fact
Staff Report

Public Safety Report for May/June 2022

Operations update from the Director of Protective Services covering fire prevention, emergency programs, and bylaw enforcement activities.

Pages 110–1144 key facts
Appendix

View Royal Fire Rescue Monthly and Annual Statistics 2022

Detailed statistical breakdown of fire rescue impacts, prevention, training, and call volumes for the first half of 2022.

Pages 115–1173 key facts
Staff Report

2022 Building Report - June

Monthly dashboard summary of building permit activity, including construction values and permit fees for June 2022.

Page 1183 key facts
Appendix

2022 View Royal Building Department Monthly Statistics

Detailed table of building permit types (single family, multi-family, etc.) issued by month in 2022.

Page 1191 key fact
Staff Report

Budget Variance and Projects Update Report to June 30, 2022

Finance report providing information on the Town's financial results and the progress of capital and non-core projects through Q2 2022.

Pages 120–1224 key facts
Appendix

Schedule A - 2022 Consolidated Budget Variance

Financial table showing year-to-date revenue and expenses compared to the total 2022 budget.

Page 1232 key facts
Appendix

Schedule B - 2022 Non-core Projects

Listing of non-core projects, such as energy audits and climate action plans, showing budget vs. actual spending.

Page 1241 key fact
Appendix

Schedule C - 2022 Capital Projects

Status report on various capital projects including road improvements, equipment purchases, and park development.

Page 1251 key fact
Staff Report

Action List Update - 2nd Quarter

Transmittal report for the current list of Council resolutions that require outstanding staff action.

Page 1262 key facts
Other

Council Committee's Follow Up Actions List

The detailed tracking list for Council action items, showing the status, responsible department, and comments for various projects and motions.

Pages 127–1322 key facts
Appendix

Council Committee's FOLLOW UP ACTIONS LIST

A detailed tracking list showing the status and progress of various council resolutions and follow-up actions from early 2022.

Pages 133–1445 key facts
Staff Report

Finance & Administration Report: 2019–2022 STRATEGIC PLAN UPDATE

A cover report providing an update on the status of projects and initiatives within the 2019-2022 Strategic Plan.

Page 1453 key facts
Appendix

TOWN OF VIEW ROYAL STRATEGIC PLAN 2019 – 2022

The full strategic plan document outlining the town's vision, mission, values, and six key strategic priorities including liveability, economic growth, and environmental stewardship.

Pages 146–1685 key facts
Staff Report

FINANCE & ADMINISTRATION REPORT: CAO UPDATE

A report from the Chief Administrative Officer highlighting significant administrative activities, departmental updates, and notable capital projects.

Pages 169–1745 key facts
Staff Report

Planning & Development Report: Development Permit Application with Variances 2022-05 – 1519 Admirals Road

A report evaluating an application for a 21,288 sq ft expansion of the Canadian Tire store, requiring several variances related to parking and loading spaces.

Pages 175–1845 key facts
Appendix

Subject Property Map - 1519 Admirals Road (Attachment 1)

A cadastral map identifying the subject property at 1519 Admirals Road and surrounding land parcels.

Page 1852 key facts
Appendix

Subject Property Orthophoto (Attachment 2)

An aerial photograph providing an overhead visual view of the Canadian Tire site and adjacent properties.

Page 1862 key facts
Correspondence

Canadian Tire Expansion – Development Permit (with Variance) Submission (Attachment 3)

The formal proposal letter from McElhanney Ltd on behalf of Canadian Tire detailing the building expansion, site design, and parking variance rationale.

Pages 187–1925 key facts
Appendix

Commercial Development Permit Area Guideline Review

A tabular analysis reviewing how the Canadian Tire expansion project complies with the specific design and character guidelines of the Commercial Development Permit Area.

Pages 193–1963 key facts
Presentation

Development Permit Application with Variances No. 2022/05 - 1519 Admirals Road

A presentation outlining a development permit application for retail and warehouse expansion at the Canadian Tire site, including requested parking and building variances.

Pages 261–2775 key facts
Staff Report

PLANNING & DEVELOPMENT REPORT: REZONING APPLICATION 2022/05 – 296 ELTHAM ROAD & 242 HELMCKEN ROAD

Staff report introducing a rezoning application to convert two detached residential properties into a 20-unit townhouse development with underground parking.

Pages 278–2856 key facts
Appendix

Attachment 1 - Subject Property Map

Cadastral map highlighting the subject properties at 242 Helmcken Road and 296 Eltham Road.

Page 2862 key facts
Appendix

Attachment 2 - Subject Property Orthophoto

Aerial orthophoto showing the subject site and surrounding residential context.

Page 2871 key fact
Correspondence

Attachment 3 - Letter from Applicant

Formal letter from Ankenman Marchand Architects to the Mayor and Council detailing project goals, sustainability, and community benefits.

Pages 288–2893 key facts
Other

Attachment 4 - Design Rationale

Detailed document explaining the site context, proposal objectives, and residential unit mix for the townhouse project.

Pages 290–2913 key facts
Appendix

Attachment 5 - Architectural Plans

A comprehensive set of architectural drawings including site plans, floor plans, elevations, sections, and shadow studies.

Pages 292–3173 key facts
Appendix

Attachment 6 - Landscape Plan

Landscape drawing showing existing tree retention, new proposed plantings, and site landscaping details.

Page 3182 key facts
Appendix

Attachment 7 - Servicing Plan

Engineering drawing outlining the civil servicing requirements, site access, and existing utility locations.

Page 3192 key facts
Other

Attachment 8 - Conceptual Storm Water Management Plan

Engineering report and calculations detailing the stormwater management design and detention requirements for the development.

Pages 320–3244 key facts
Appendix

Area Listing (all nodes) - 33862 - Post (Attachment 8)

Technical stormwater management report (HydroCAD) providing post-development runoff analysis and pond system summaries for the development site.

Pages 325–3275 key facts
Appendix

OFFICIAL COMMUNITY PLAN BYLAW NO. 811, 2011 Relevant Official Community Plan Policies (Attachment 9)

Excerpt of relevant land use, amenity, transportation, and environmental policies from the Official Community Plan applicable to the development application.

Pages 328–3324 key facts
Presentation

Presentation: REZONING 2022/05 - 296 Eltham and 242 Helmcken Road

Slide deck for the proposal to rezone two detached residential properties into a townhouse multifamily development.

Pages 333–3405 key facts
Staff Report

Bill 26 Amendments - Planning & Development Report

Report summarizing legislative changes from Bill 26 regarding public notification methods, public hearing requirements for OCP-consistent rezonings, and delegation of minor variance authority.

Pages 341–3464 key facts
Presentation

Presentation: COUNCIL ACTION LIST: C-123-21 - Bill 26 Amendments

Presentation outlining the purpose and proposed implementation of Bill 26 legislative changes in the Town of View Royal.

Pages 347–3594 key facts
Staff Report

REZONING APPLICATION 2022/04 – 335 STEWART AVENUE - Planning & Development Report

Staff report introducing a rezoning application for 335 Stewart Avenue to allow for an addition to an existing residential property that exceeds current floor area limits.

Pages 360–3655 key facts
Appendix

Attachment 1 - Subject Property Map - 335 Stewart Ave

Official map showing the location and surrounding lot numbers for 335 Stewart Avenue.

Page 3661 key fact
Appendix

Attachment 2 - 335 Stewart Avenue Orthophoto

Aerial orthophoto provided by the Capital Regional District showing the property site at 335 Stewart Avenue.

Page 3671 key fact
Correspondence

Attachment 3 - Letter from Applicant regarding 335 Stewart Avenue proposed addition

Letter from the applicant explaining the background of the proposed garage/living addition and site photos of existing conditions.

Pages 368–3765 key facts
Appendix

Attachment 4 - Site Plan (Sheet A0)

Detailed site plan showing the location of the existing building, the proposed addition, and riparian setbacks for 335 Stewart Avenue.

Page 3773 key facts
Appendix

Attachment 5 - Renderings and Elevations

Architectural renderings and floor plans showing the front view and interior layout of the proposed residential addition.

Pages 378–3832 key facts
Appendix

Attachment 6 - Zoning Bylaw excerpt - R-1 Zone

Copy of the existing R-1: Detached Residential (Large Lot) zoning text used to compare with the applicant's request.

Pages 384–3853 key facts
Presentation

Presentation: REZONING 2022/04 - 335 Stewart Avenue

Presentation slides summarizing the proposal to rezone 335 Stewart Avenue to permit the increased floor area addition.

Pages 386–3883 key facts
Presentation

Presentation: REZONING 2022/04 335 Stewart Avenue

A presentation outlining a rezoning application for 335 Stewart Avenue, focusing on environmental impacts, setbacks, and site servicing.

Pages 389–3924 key facts
Staff Report

PLANNING & DEVELOPMENT REPORT: DEVELOPMENT VARIANCE PERMIT 2022/03 – 2446 Lund Road

A staff report regarding a request to vary the rear yard setback at 2446 Lund Road to permit an attached patio cover.

Pages 393–3975 key facts
Appendix

Attachment 1 - 2446 Lund Road Property Location and Air Photo

An aerial map showing the property location of 2446 Lund Road and its proximity to Chilco Park.

Page 3982 key facts
Correspondence

Attachment 2 - Letter from Applicant – May 7, 2022

A letter from the property owners requesting a setback relaxation for a patio cover structure.

Page 3994 key facts
Appendix

Attachment 3 - Site Plan

A site plan illustrating the required setbacks and the location of the proposed pergola on the property.

Page 4002 key facts
Appendix

Attachment 4 - Project Plan (Patio Photo)

A photograph of the existing patio area with measurement markers for the proposed variance.

Page 4012 key facts
Appendix

Attachment 4 - Project Plan (Overhead View)

A detailed layout of the patio including furniture, vegetable beds, and the variance line.

Page 4022 key facts
Appendix

Attachment 5 - Proposed install drawings (Patio Cover)

A hand-drawn technical sketch of the 22'x16' V-pan patio cover including post and skylight locations.

Page 4033 key facts
Appendix

Attachment 5 - Proposed install drawings (Roof Mount Detail)

A hand-drawn cross-section detail showing how the patio cover mounts to the existing house roof.

Page 4042 key facts
Appendix

Attachment 6 - Engineering Load Tables

Technical load tables and structural charts for 3" and 3.5" square tube aluminum beams.

Page 4063 key facts
Appendix

Attachment 6 - Load Tables for Panels and Skylights

Load capacity tables for specific structural panels and skyview T-bar components.

Page 4072 key facts
Presentation

Presentation: DEVELOPMENT VARIANCE PERMIT 2022/03 2446 Lund Road

A presentation summarizing the variance request for 2446 Lund Road, covering background facts and discussion points.

Pages 408–4134 key facts
Staff Report

COMMITTEE OF THE WHOLE REPORT: Pedestrian Street Lighting Project – Direct Award

A report recommending the direct award of a pedestrian street lighting contract and the deferral of one intersection's improvements due to budget constraints.

Pages 414–4164 key facts