This site is in beta — data may be incomplete and features are still being added.
Council Meeting/Documents

Meeting Documents

October 17, 20231 PDF120 documents extracted

2023 10 17 Council Agenda - Agenda - Pdf

Minutes

MINUTES OF A COUNCIL MEETING HELD ON TUESDAY, OCTOBER 3, 2023

Official record of the proceedings from the October 3, 2023, View Royal Council meeting, including resolutions and public attendance details.

Pages 8–164 key facts
Form

PETITION & DELEGATION REQUEST FORM - Kevin Lorette

A formal request from Kevin Lorette of the Capital Regional District (CRD) to appear as a delegation regarding housing bylaw amendments.

Page 174 key facts
Presentation

Capital Regional District Presentation: Future Housing Priorities & Partnerships

A slide deck overview of the CRD's intent to increase borrowing authority to support affordable housing through land assembly and partnerships.

Pages 18–274 key facts
Form

PETITION & DELEGATION REQUEST FORM - Niki Ottosen

A delegation request form from Niki Ottosen regarding The Backpack Project, seeking support for a donation box at the municipal hall.

Page 284 key facts
Staff Report

STAFF REPORT: REQUEST TO AMEND COVENANT FOR ERSKINE LANE / WATKISS WAY ROUNDABOUT – FURTHER INFORMATION

A staff report recommending the modification of a covenant to allow for a signalized intersection instead of a roundabout to reduce property impacts and tree removal.

Pages 29–334 key facts
Appendix

Attachment 1: TOWN OF VIEW ROYAL PLANNING, DEVELOPMENT AND ENGAGEMENT REPORT

An earlier report provided as an attachment regarding the amendment of the covenant for the Erskine Lane / Watkiss Way roundabout.

Page 344 key facts
Staff Report

Report to Committee of the Whole Re: Request to Amend Covenant for Erskine Lane / Watkiss Way Roundabout

A staff report evaluating the feasibility of a roundabout versus a signalized intersection at Erskine Lane and Watkiss Way for a 336-unit rental development.

Pages 35–414 key facts
Appendix

Land Title Act Form C - Covenant CA8718173

The original legal covenant registered in 2021 securing community amenity contributions for the development at 9 Erskine Lane.

Pages 42–514 key facts
Form

Land Title Act Form Declaration - Appointment of Trustees

A legal declaration regarding the death of the original trustee and the appointment of Darlene Evelyn Grigull and John Willy Adams as new trustees.

Page 522 key facts
Appendix

Trust Document Extract - Appointment of Trustees

An extract from the trust document detailing the appointment procedures and list of beneficiaries.

Page 532 key facts
Form

Land Title Act Form Declaration - Change of Trustee Application

A secondary legal declaration confirming the application for a change of trustee has been filed under document CA8746669.

Page 542 key facts
Form

Land Title Act Form 17 - Charge, Notation or Filing

An application form to update the Land Title office regarding the change of trustee due to the death of Beverley Adams.

Page 553 key facts
Appendix

Certificate of Death - Beverley Iris Adams

Official death certificate used as supporting documentation for legal property and trust transfers.

Page 563 key facts
Appendix

Land Title Act Form A - Freehold Transfer

A transfer document moving the property title into the Beverley Adams Alter Ego Trust.

Page 573 key facts
Appendix

Trust Settlement - Beverley Adams Alter Ego Trust

Legal document establishing the terms, purpose, and powers of the Beverley Adams Alter Ego Trust.

Pages 58–643 key facts
Appendix

Trust Document Excerpt - Covenant CA8718173

A single page from a larger trust document or covenant agreement outlining trustee powers and beneficiary interests.

Page 653 key facts
Correspondence

RE: Amendment to Covenant CA8718173 – Development Agreement

A letter from WestUrban Developments requesting to amend a development covenant to replace a required roundabout with a signalized intersection.

Page 665 key facts
Appendix

MEMORANDUM - Watkiss Way and Erskine Lane Roundabout

A technical memorandum from WATT Consulting Group analyzing design iterations, constraints, and alternatives for the proposed roundabout at Watkiss Way and Erskine Lane.

Pages 67–835 key facts
Appendix

Geotechnical Assessment - Proposed Multi-Family Development - 9 Erskine Lane

A geotechnical report and engineering plan assessing existing retaining wall modifications required for the proposed roundabout construction.

Pages 84–855 key facts
Appendix

9 ERSKINE LANE Traffic Impact Assessment

A traffic impact study evaluating the long-term operational effects of a proposed 336-unit residential development on the local road network.

Pages 86–945 key facts
Appendix

9 Erskine Lane Traffic Impact Assessment

A technical report assessing the traffic impacts of a proposed 336-unit residential development at 9 Erskine Lane, including trip generation forecasts and intersection performance analysis.

Pages 95–1246 key facts
Appendix

9 Erskine Lane Traffic Impact Assessment - Sections 6.5.2 to 9.0

A portion of a traffic impact assessment report evaluating intersection performance and levels of service for the year 2033 post-development.

Pages 125–1315 key facts
Appendix

APPENDIX A – SITE PLAN

Architectural site plans and detailed project data for Lot A and Lot B of the development project.

Pages 132–1345 key facts
Appendix

APPENDIX B – SYNCHRO BACKGROUND

Technical background information describing the Synchro modelling software and the criteria used for grading levels of service (LOS).

Pages 135–1363 key facts
Appendix

APPENDIX C – SYNCHRO REPORTS

A collection of computer-generated SimTraffic performance and queuing reports for various 2033 traffic scenarios.

Pages 137–1545 key facts
Appendix

2033 Background PM SimTraffic Report - Queuing and Blocking Report

Traffic simulation report analyzing queuing and blocking for the year 2033 background scenario during the afternoon peak.

Pages 155–1563 key facts
Appendix

2033 Full Build Out PM Extg+Growth+9+CD SimTraffic Report - Performance Report

SimTraffic performance report evaluating delay and travel times for the 2033 full build-out scenario.

Page 1572 key facts
Appendix

2033 Full Build Out PM Extg+Growth+9+CD SimTraffic Report - Queuing and Blocking Report

Queuing and blocking data for the 2033 full build-out scenario at specific site access points on Erskine Lane.

Page 1583 key facts
Appendix

2033 Full Build Out PM Extg+Growth+9+CD SimTraffic Report - SimTraffic Performance Report

Comprehensive performance analysis of major intersections including Helmcken Rd and Watkiss Way for the 2033 full build-out scenario.

Pages 159–1603 key facts
Appendix

2033 Full Build Out PM Extg+Growth+9+CD SimTraffic Report - Queuing and Blocking Report

Detailed queuing analysis for the 2033 full build-out scenario covering multiple intersections and the Erskine Lane roundabout.

Pages 161–1633 key facts
Appendix

Existing AM and 9 Erskine - 2023 SimTraffic Report - SimTraffic Performance Report

Performance report for existing morning conditions plus proposed development at 9 Erskine Lane.

Page 1642 key facts
Appendix

Existing AM and 9 Erskine - 2023 SimTraffic Report - Queuing and Blocking Report

Queuing analysis for existing morning conditions with the 9 Erskine Lane development.

Page 1653 key facts
Appendix

Existing PM and 9 Erskine - 2023 SimTraffic Report - SimTraffic Performance Report

Performance report for existing afternoon conditions with the 9 Erskine Lane development.

Page 1662 key facts
Appendix

Existing PM and 9 Erskine - 2023 SimTraffic Report - Queuing and Blocking Report

Queuing analysis for existing afternoon conditions with the 9 Erskine Lane development.

Page 1673 key facts
Appendix

Existing AM - 2023 SimTraffic Report - SimTraffic Performance Report

SimTraffic performance analysis for 2023 existing morning traffic conditions.

Pages 168–1692 key facts
Appendix

Existing AM - 2023 SimTraffic Report - Queuing and Blocking Report

Queuing and blocking analysis for 2023 existing morning traffic conditions across the network.

Pages 170–1723 key facts
Appendix

Existing AM and 9 Erskine - 2023 SimTraffic Report - SimTraffic Performance Report

Performance report for existing morning traffic plus the 9 Erskine development, using data from a different simulation run.

Pages 173–1742 key facts
Appendix

Existing AM and 9 Erskine - 2023 SimTraffic Report - Queuing and Blocking Report

Queuing and blocking data for existing morning traffic with the 9 Erskine development.

Pages 175–1773 key facts
Appendix

Existing PM and 9 Erskine - 2023 SimTraffic Report - SimTraffic Performance Report

Performance report for existing afternoon traffic plus the 9 Erskine development scenario.

Pages 178–1792 key facts
Appendix

Existing PM and 9 Erskine - 2023 SimTraffic Report - Queuing and Blocking Report

Queuing analysis for existing afternoon traffic with the 9 Erskine development scenario.

Pages 180–1822 key facts
Appendix

Existing PM - 2023 SimTraffic Report - SimTraffic Performance Report

Performance analysis of 2023 existing afternoon peak traffic conditions.

Pages 183–1842 key facts
Appendix

Queuing and Blocking Report - Existing PM 2023

A traffic simulation report (SimTraffic) analyzing queuing and blocking data for intersections along Watkiss Way.

Pages 185–1874 key facts
Appendix

Signalized Intersection Lane Design - Watkiss Way / Erskine Lane

Engineering diagrams and lane design plans for a proposed signalized intersection at the Watkiss Way and Erskine Lane junction.

Pages 188–1904 key facts
Staff Report

MEMORANDUM: TIA Addendum No. 1 – Helmcken Rd. / Watkiss Way Intersection

A technical memorandum from WATT Consulting Group providing an addendum to the Traffic Impact Assessment for the Helmcken Road and Watkiss Way intersection.

Pages 191–1964 key facts
Appendix

Open House Summary - Intersection Improvement Options at Erskine Lane and Watkiss Way

A summary report of a public open house regarding intersection improvements, including public feedback forms and sign-in sheets.

Pages 197–2084 key facts
Staff Report

Council Report: Development Variance Permit 2023-07 – 25 Chancellor Avenue

A staff report recommending approval of variances for an accessory building length and separation distance at 25 Chancellor Avenue.

Pages 209–2114 key facts
Staff Report

Attachment A: Planning, Development and Engagement Report – 25 Chancellor Avenue

A background report to the Committee of the Whole introducing the development variance permit application for a new accessory building.

Pages 212–2144 key facts
Staff Report

Report to Committee of the Whole Re: DVP 2023/07 – 25 Chancellor Avenue (Conclusion)

The conclusion section of a staff report regarding a development variance permit for 25 Chancellor Avenue, recommending approval.

Page 2154 key facts
Correspondence

Correspondence: Variance for garage length at 25 Chancellor Avenue

A letter from resident Brian Westwood requesting a variance to build a new garage using an existing footprint that exceeds allowed length.

Page 2163 key facts
Appendix

Attachment 2: Site Plan (25 Chancellor Avenue)

An annotated aerial photo showing the property lines and proposed garage dimensions at 25 Chancellor Avenue.

Page 2173 key facts
Appendix

Garage Dimensions Drawing - 25 Chancellor Avenue

Hand-drawn technical diagram showing the specific length, width, and height dimensions for the proposed garage.

Page 2184 key facts
Appendix

Attachment 3: Building Concept

Detailed building concept sketches for the proposed garage at 25 Chancellor Avenue, including material specifications.

Pages 219–2203 key facts
Presentation

Presentation: DEVELOPMENT VARIANCE PERMIT 2023-07 - 25 Chancellor Avenue

Council presentation slides summarizing the variance requests for the accessory building length and separation distance at 25 Chancellor Avenue.

Pages 221–2264 key facts
Staff Report

COUNCIL REPORT: DEVELOPMENT PERMIT 2022/10 – 10 ERSKINE LANE

A staff report from the Senior Planner recommending approval of a development permit for a 43-unit multi-unit residential building.

Pages 227–2314 key facts
Staff Report

PLANNING, DEVELOPMENT AND ENGAGEMENT REPORT: DEVELOPMENT PERMIT 2022/10 – 10 ERSKINE LANE (May 4, 2023)

A previous staff report providing background context and technical details for the 10 Erskine Lane development project.

Pages 232–2394 key facts
Appendix

Attachment 1. Location Map (10 Erskine Lane)

A site location map showing the subject property at 10 Erskine Lane and its proximity to the Victoria General Hospital and Galloping Goose Trail.

Page 2402 key facts
Correspondence

Attachment 2: Development Permit application for 10 Erskine Road (Wiser Projects Letter)

A letter from Wiser Projects providing a project summary and rationale for the 43-unit development at 10 Erskine Lane on behalf of Parsi Development.

Pages 241–2444 key facts
Appendix

Attachment 2: Development Permit Rationale and DPA Guidelines Summary - 10 Erskine Lane

A submission document from Wiser Projects providing the design rationale and a detailed compliance table for a proposed 43-unit apartment building against Mixed Residential Development Permit Area guidelines.

Pages 245–2515 key facts
Appendix

Attachment 3: Site Survey of No. 10 Erskine Lane - Drawing A100

A professional site survey plan for 10 Erskine Lane showing existing topography, property lines, and connection to the Galloping Goose Trail.

Page 2524 key facts
Appendix

Attachment 3: Project Data and Architectural Floor Plans - 8 + 10 Erskine Lane

A set of architectural drawings and technical project data including zoning calculations, site plan, and floor plans for a 5-storey residential development.

Pages 253–2597 key facts
Appendix

Attachment 3: Architectural Drawings for 8+10 Erskine Lane

Architectural set for a multi-family residential building including roof plans, elevations, sections, and unit types.

Pages 260–2675 key facts
Appendix

Attachment 4: Landscape Concept Plan for 10 Erskine Lane

Detailed landscape design plan including a suggested plant list, pedestrian pathways, and amenity areas.

Pages 268–2696 key facts
Appendix

Attachment 5: Construction Impact Assessment & Tree Management Plan

Arborist report evaluating the impact of proposed construction on existing trees and detailing preservation or removal requirements.

Pages 270–2855 key facts
Appendix

Attachment 5 - Appendix A: Tree Management Plan (T1)

Map and technical notes identifying tree protection zones and barrier locations on the project site.

Pages 286–2873 key facts
Appendix

Attachment 5 - Appendix B: Hard Surface Above Tree Roots Detail

Technical detail for installing permeable paved surfaces over root systems to avoid structural soil compaction and root loss.

Pages 288–2893 key facts
Appendix

APPENDIX C - PHOTOGRAPHS (Construction Impact Assessment and Tree Management Plan for 10 Erskine Lane)

Photographic documentation of tree species and site features at 10 Erskine Lane, supporting a tree management plan for Parsi Development Ltd.

Pages 290–2923 key facts
Appendix

Attachment 6 - Preliminary Engineering Plan

A technical drawing detailing the preliminary engineering for the development at 10 Erskine Lane, including site profiles and utility locations.

Page 2934 key facts
Appendix

Attachment 7 - DEVELOPMENT PERMIT AREA GUIDELINES -REVIEW

A detailed evaluation of the 10 Erskine Lane project proposal against the Mixed Residential Development Permit Area design guidelines.

Pages 294–3004 key facts
Correspondence

Attachment 2 - RE: Updates to Development Permit application for 10 Erskine Road

A letter from Wiser Projects regarding revisions and updates to the development permit application for 10 Erskine Lane to address staff and Council feedback.

Pages 301–3034 key facts
Appendix

Appendix A: Policy Analysis

A table summarizing how the 10 Erskine Lane project aligns with various Official Community Plan (OCP) policies regarding land use, housing, and transportation.

Page 3043 key facts
Appendix

Attachment 2 - Form and Character - Mixed Residential Development Permit Area (Table 3: DPA Analysis)

A detailed analysis evaluating a proposed 43-unit residential development against Official Community Plan (OCP) design guidelines for mixed residential areas.

Pages 305–3116 key facts
Appendix

Attachment 3: Architectural Rendering - Perspective View

An architectural 3D rendering showing the perspective view of the proposed multi-unit residential building at 10 Erskine Lane.

Page 3153 key facts
Appendix

Attachment 3: Architectural Rendering - Overhead View

An architectural 3D rendering providing an overhead view of the proposed development at 10 Erskine Lane, highlighting the parking area and building footprint.

Page 3162 key facts
Appendix

Attachment 3: Architectural Rendering - Rear Perspective View

An architectural 3D rendering showing the rear elevation and site entry for the proposed building at 10 Erskine Lane.

Page 3172 key facts
Appendix

Attachment 3: Architectural Rendering - Side Elevation View

An architectural 3D rendering showing the side elevation of the 10 Erskine Lane development adjacent to existing greenery.

Page 3182 key facts
Appendix

Attachment 4: Site Survey - 10 Erskine Lane

A technical site survey plan prepared by BC Land Surveyors for the property located at 10 Erskine Lane.

Page 3194 key facts
Appendix

Attachment 4: Project Data - 10 Erskine Lane

A detailed technical sheet outlining project statistics, zoning compliance, and density for the 10 Erskine Lane development.

Page 3206 key facts
Appendix

Attachment 4: Site Plan - Drawing A102

The architectural site plan showing the building footprint, setbacks, and parking layout for 10 Erskine Lane.

Page 3215 key facts
Appendix

Attachment 4: Architectural Drawings - 8-10 Erskine Lane

A comprehensive set of architectural plans for a multi-story residential development at 8-10 Erskine Lane, including basement through roof plans, elevations, and unit types.

Pages 322–3345 key facts
Appendix

Attachment 5: Sound Travel and Lighting Plans - 8-10 Erskine Lane

Technical drawings assessing highway noise impact and exterior lighting layout for the 8-10 Erskine Lane project.

Pages 335–3373 key facts
Appendix

Attachment 6: Landscape Concept Plan and Viewing Deck Details - 10 Erskine Lane

Landscape architecture plans and structural details for a viewing deck at the 10 Erskine Lane development site.

Pages 338–3394 key facts
Appendix

Attachment 7: Construction Impact Assessment & Tree Management Plan - 10 Erskine Lane

Arborist report evaluating the impact of proposed construction on existing tree resources and detailing necessary removals and protections.

Pages 340–3515 key facts
Appendix

Construction Impact Assessment and Tree Management Plan for 10 Erskine Lane

An arborist report detailing mitigation strategies for protected trees during construction at 10 Erskine Lane, including barrier specifications and arborist supervision requirements.

Pages 352–3555 key facts
Appendix

APPENDIX A - TREE MANAGEMENT PLAN (T1)

A detailed site map and legend identifying trees to be retained, removed, or protected under the tree management plan for the 10 Erskine Lane project.

Pages 356–3573 key facts
Appendix

APPENDIX B – HARD SURFACE ABOVE TREE ROOTS DETAIL

A technical detail specification for constructing paved surfaces over tree roots to ensure root health and structural stability.

Page 3581 key fact
Appendix

APPENDIX C - PHOTOGRAPHS

Site photographs documenting existing vegetation at 10 Erskine Lane, including a Grand fir and the onsite Leylandii hedge.

Pages 359–3612 key facts
Appendix

APPENDIX C – LANDSCAPE CONCEPT PLAN AND VIEWING PLATFORM DETIAL (TYPICAL SECTION)

Visual plans and structural sections for the landscape concept and viewing deck proposed for the 10 Erskine Lane development.

Pages 362–3644 key facts
Other

ATTACHMENTS: Report to Council Re: Request To Amend Covenant For Erskine Lane / Watkiss Way Roundabout – Further Information

A list of seven attachments supporting the staff report for Development Permit 2022/10 at 10 Erskine Lane.

Page 3653 key facts
Presentation

DEVELOPMENT PERMIT 2022-10 10 Erskine Lane (Presentation)

A presentation summarizing the application to construct a 43-unit residential building, including architectural renderings, zoning compliance, and sound impact data.

Pages 366–3785 key facts
Staff Report

BC ACTIVE TRANSPORTATION INFRASTRUCTURE GRANT PROGRAM COUNCIL REPORT

A report from the Director of Engineering recommending that the Town apply for a provincial grant to fund Island Highway upgrades between Hart Road and Wilfert Road.

Pages 379–3815 key facts
Staff Report

Report to Council Re: BC Active Transportation Infrastructure Grant Program

Staff report recommending that the Town apply for a provincial grant to fund the Island Highway Upgrades project between Hart Road and Wilfert Road.

Pages 382–3844 key facts
Appendix

Project Summary C-066: Island Hwy upgrades – Hart Road to Wilfert Road

A technical and financial project summary for the Island Highway upgrades, detailing the scope, budget, and funding source.

Page 3853 key facts
Staff Report

CAPITAL WEST ACCESSIBILITY ADVISORY COMMITTEE – TERMS OF REFERENCE, PROGRESS UPDATE & NEXT STEPS

Report providing the Terms of Reference for a joint intermunicipal accessibility advisory committee and outlining the progress made to date on the Town's accessibility plan.

Pages 386–3893 key facts
Appendix

Attachment "A" - CAPITAL WEST ACCESSIBILITY ADVISORY COMMITTEE TERMS OF REFERENCE

Operational guidelines for the Capital West Accessibility Advisory Committee, including its mandate, membership rules, and meeting protocols.

Pages 390–3943 key facts
Minutes

Minutes of the West Shore Parks and Recreation Society Board of Directors Meeting - Wednesday, September 13th, 2023

Minutes detailing the proceedings of the WSPR board meeting, covering financial updates, fitness center improvements, and a proposal for new pickleball courts.

Pages 395–4074 key facts
Correspondence

CONSENT FOR BYLAW NO. 4551 – LAND ASSEMBLY, HOUSING AND LAND BANKING SERVICE ESTABLISHMENT BYLAW NO. 1, 2010, AMENDMENT BYLAW NO. 2, 2023

Formal request from the Capital Regional District (CRD) seeking View Royal's consent to increase the maximum requisition capacity for housing services.

Pages 408–4094 key facts
Bylaw

CAPITAL REGIONAL DISTRICT BYLAW NO. 4551

Legislation to amend the land assembly and housing service establishment bylaw to increase the maximum requisition to support affordable housing initiatives.

Pages 410–4112 key facts
Staff Report

REPORT TO HOSPITALS AND HOUSING COMMITTEE - Future Housing Partnerships Alternative Approval Process and Bylaw Amendments

A staff report proposing amendments to increase the allowable annual maximum requisition and authorize $85 million in borrowing for housing partnerships.

Pages 412–4175 key facts
Appendix

APPENDIX A - CAPITAL REGIONAL DISTRICT BYLAW NO. 3712

An unofficial consolidation of the bylaw converting the authority for land assembly, housing, and land banking to an establishing bylaw.

Pages 418–4203 key facts
Appendix

APPENDIX B - REPORT TO HOSPITALS AND HOUSING COMMITTEE - Capital Regional District Land Banking and Housing Land Acquisition Financing

A previous staff report from March 1, 2023, outlining funding options and revenue implications for land acquisitions.

Pages 421–4243 key facts
Appendix

APPENDIX C - CAPITAL REGIONAL DISTRICT BYLAW NO. 4551

A draft bylaw to amend the maximum requisition amount for the Land Assembly, Housing and Land Banking Service.

Pages 425–4262 key facts
Appendix

APPENDIX D - CAPITAL REGIONAL DISTRICT BYLAW NO. 4552

A draft bylaw to authorize the borrowing of $85,000,000 for future housing partnerships.

Pages 427–4282 key facts
Appendix

APPENDIX E - Summary Homes for People

An action plan summary for meeting housing challenges in B.C. through various pillars like unlocking more homes and delivering affordable units.

Pages 429–4302 key facts
Staff Report

REPORT TO CAPITAL REGIONAL DISTRICT BOARD - Consent on Behalf for Bylaw 4551 – Amendment to Increase Annual Requisition

A report seeking to obtain participating area approval via director consent instead of an alternative approval process.

Pages 431–4322 key facts
Correspondence

Correspondence from Carmen LeBlanc and Doug Slater, FortisBC re: Renewable Natural Gas and emissions reduction

Correspondence from FortisBC requesting support for their Renewable Natural Gas filing and updating the Council on decarbonization progress.

Pages 433–4363 key facts
Correspondence

District of Hope Office of the Mayor - Letter of Support for Proposed Renewable Natural Gas Program

A letter from Mayor Victor Smith supporting the permanence of RNG in new construction buildings.

Page 4372 key facts
Correspondence

Correspondence from Jen re: Parking

A resident's email expressing concern about parking congestion on Quincy Street due to hospital employees and new condo developments.

Page 4382 key facts
Correspondence

Correspondence from Ardys Baker re: Province's changes to housing legislation

Resident correspondence regarding the impacts of upcoming provincial housing policy on traffic and safety in quiet neighborhoods.

Page 4392 key facts
Correspondence

Correspondence from Linda Simon re: Increasing the fee for type 2 suite

Resident opposition to the plan to double the fee for Type 2 secondary suite permits.

Page 4402 key facts
Correspondence

Correspondence from Deb Thurlbeck re: fee increase of suites

Correspondence opposing the 100% increase in suite permit fees and suggesting expenditure trimming instead.

Page 4412 key facts
Correspondence

FW: Proposed Secondary Suite Permit Bylaw Amendments

Email correspondence from R. Steer expressing concerns over the proposed increase in secondary suite renewal fees and suggesting their elimination.

Page 4424 key facts
Staff Report

SECONDARY SUITE REQUIREMENTS - STAFF REPORT

A staff report recommending amendments to secondary suite regulations, specifically regarding owner-occupancy requirements and permit fee structures.

Pages 443–4475 key facts
Appendix

Attachment A: Secondary Suite Type 1 and Type 2 Permits (COMMITTEE OF THE WHOLE REPORT)

An analysis report from the Committee of the Whole detailing the definitions of Type 1 and Type 2 secondary suite permits and the rationale for fee changes.

Pages 448–4565 key facts
Presentation

Secondary Suite Requirements – Proposed Bylaw Amendments (Presentation)

A slide deck summarizing proposed bylaw changes for secondary suite requirements, permit deletions, and fee updates.

Pages 457–4604 key facts
Bylaw

TOWN OF VIEW ROYAL BYLAW NO. 1124

A bylaw to amend Zoning Bylaw No. 900, 2014 by deleting specific sections related to secondary suite occupancy and permitting.

Page 4613 key facts
Bylaw

TOWN OF VIEW ROYAL BYLAW NO. 1125

A bylaw to amend the Secondary Suites Permit Bylaw No. 601, 2005, clarifying Type 2 permit definitions and posting requirements.

Pages 462–4634 key facts
Bylaw

TOWN OF VIEW ROYAL BYLAW NO. 1126

A bylaw to amend the Municipal Ticket Information Bylaw No. 643, 2007 to include fines for failing to renew Type 2 secondary suite permits.

Pages 464–4664 key facts
Bylaw

TOWN OF VIEW ROYAL BYLAW NO. 1127

A bylaw to amend the Fees and Charges Bylaw No. 958, 2016 to establish the new renewal fee for Type 2 secondary suite permits.

Page 4673 key facts
Bylaw

TOWN OF VIEW ROYAL BYLAW NO. 1123

A bylaw to amend business license fees specifically for cannabis retail stores within the Fees and Charges Bylaw.

Page 4683 key facts
Correspondence

New business next week council - Correspondence

Email correspondence from 'John' requesting that Council direct staff to write a letter to the CRD regarding the deployment of post-disaster potable water drop kits.

Page 4694 key facts